The objective of the present proposal is to assess and provide remedy to the urgent problem of microscopic plastic particles polluting water bodies in Minnesota.
Complete an updated master plan based on the RiverFirst Initiative, extensive community engagement, and a collaborative process with the City of Minneapolis around the Upper Harbor Terminal
Develop and implement an integrated brand awareness and marketing campaign to increase awareness and familiarity of the park system service offerings to Dakota County residents and increase new use throughout the park system. The campaign will use print, digital and other media strategies to inform a broad and diverse audiences with targeted approaches appropriate for those audiences.
The Rice Creek Watershed District (RCWD) is proposing to improve the water quality of stormwater runoff to Bald Eagle Lake through installation of a new wet pond and iron-enhanced sand filter (IESF) on Ramsey County Ditch #11. In partnership with White Bear Township, this project will remove approximately 43 pounds of phosphorus from runoff annually and builds upon the extensive work undertaken by the RCWD to improve water quality in Bald Eagle Lake.
To broaden public access to the Barnesville City Hall, listed in the National Register of Historic Places in continuous use since 1899, through the installation of an elevator and other appropriate modifications that satisfy the Americans with Disability Act
Supplement existing grant SG-11406 for planning, design, engineering, construction, permitting/administrative costs, and contingencies for a new cross country skiing and winter recreation area and supporting facilities, equipment, and infrastructure at Battle Creek Regional Park.
Supplement existing grant SG-11406 for planning, design, engineering, construction, permitting/administrative costs, and contingencies for a new cross country skiing and winter recreation area and supporting facilities, equipment, and infrastructure at Battle Creek Regional Park.
To complete the interior display areas of the historically accurate Forestry Ranger Station. Exhibits will feature the early history of forest fire fighting, an account of forestry activity on the Red Lake Indian Reservation, draft horse logging equipment, lumberjack tools, and a tribute to Paul Bunyon. Additionally, funds will be used for a stage where speakers can tell stories and teach about forestry stewardship.
to acquire 12.65 miles of abandoned rail line for trail development with connection to existing biking lane and trail head of the Blazing Star State Trail located in Albert Lea
To acquire professional services in conducting a Phase I archaeological investigation preparatory to further historic preservation work on the Berg Hotel, listed in the National Register of Historic Places
To hire a qualified professional to prepare a Historic Structures Report for the John Bergquist House, listed in the National Register of Historic Places.
Acquire 124-acre addition to existing 496-acre Bertram Chain of Lakes Regional Park. This property consists of 1,200 acres, including four undeveloped lakes (5.75 miles of lake shore and 1.5 miles of streams), in Wright County.
This project will complete a Total Maximum Daily Load Implementation Plan for the watersheds of Big Sandy and Minnewawa Lakes. This restoration plan will provide pollution reduction and watershed management strategies that are developed with input from stakeholders in the watersheds.
To offer live performances to enhance the education, preservation, and promotion of Minnesota history and cultural heritage. Live performances at Big Stone County Fair will include a Bluegrass Band, a percussion group showcasing music from around the globe, a magician highlighting the history and heritage of magic, a caricature artist, and a vaudeville-style comedy troupe.
The goal of this project is to develop statewide biological criteria for managing the state’s water resources, in keeping with the federal Clean Water Act. The MPCA is using the Biological Condition Gradient (BCG) for this development. The BCG is a conceptual model that describes changes in aquatic ecosystems on a gradient of increasing anthropogenic stress.
The Birdie Lane East Ravine Improvement project consists of eliminating ravine erosion and treatment of an 8.24-acre watershed to reduce total phosphorus reaching Lake Hazeltine by 98 pounds per year. The eroding ravine will be replaced with a linear treatment feature to provide treatment of a watershed that has land uses that include roads, single-family residential, and a golf course. The project will involve development of a cascade, pool, and riffle channel system.
The Council on Black Minnesotans and the Humanities Center will coordinate a Cultural Relations Summit for Minnesotans of Africans descent. The summit will celebrate culture traditions through instructional demonstrations, guided tours, and visual arts; plan for cultural institutions’ sustainability; and strengthen cultural connections through DNA technology. A web-based cultural portal and a video documentary on the contributions of Minnesotans of African will discover and preserve cultural traditions and enhance relations in Minnesota.
This project will reduce sediment to the Minnesota River, and protect private land and public infrastructure. Blakeley Trail (County Rd 60) in southwest Scott County is surrounded by deep ravines. As these ravines incise, they cause road shoulder landslides, which cut into private property, threaten the road at the head-cuts and generate sediment which creates maintenance and flooding issues downstream. The Scott Watershed Management Organization and the Scott County Highway Department have partnered on this project because of the multiple benefits.
The goal of this project is to facilitate strategic networking, relationships, and learning in targeted groups to assess, build, and leverage community capacity (i.e. community resources and values) to increase knowledge of the Blue Earth River watershed’s water resources and increase best management practice (BMP) adoption to restore and protect water quality in the Blue Earth River watershed. Additional goals include providing information that is readily available to the general public for updates on Watershed Approach work in the Blue Earth River watershed.
The goal of this project is to reduce the number of vulnerable unused wells located within sensitive areas and to prevent potential groundwater contamination. Most Minnesotans rely on groundwater as their primary source of drinking water. Unused and improperly sealed wells can serve as an open conduit to groundwater aquifers, allowing surface water runoff, contaminated water or improperly disposed waste to reach an uncontaminated aquifer. Properly sealing unused and improperly sealed wells is a preventive practice that protects groundwater aquifers from contamination.
The purpose of this project is to expand the County's long standing well sealing efforts by reducing the current inventory of identified well sealing projects.
To gain intellectual and physical control over a significant historical architectural drawing collection documenting the built environment of Rochester
Seminary Fen, a 600-acre complex in Carver County, supports one of only 500 calcareous fens in the world and is one of the highest quality calcareous fens in southern Minnesota. The Fen feeds Assumption Creek; one of the metro area's last known trout streams that supports naturally reproducing native brook trout. Assumption Creek then discharges to the nearby Minnesota River. The Fen's unique hydrology, soils, plants, and habitats are highly sensitive to water quality and sedimentation stress.
The purpose of this project is to complete a feasibility study to determine the best sites for projects in the Boot Creek headwaters, in the Le Sueur River watershed, to reduce erosion and pollutant loading. The study will identify critical source areas and provide additional watershed information to assist in prioritizing locations to address local resource management and water quality goals.