Design, engineering and construction of a picnic shelter with restroom facilities. Site work will include grading, erosion control, and stormwater management.
Project includes additional design, engineering, easements, potential acquisitions, construction of safety improvements related to the regional trail project specifically at intersections of the trail and private businesses and rail properties.
Project will complete the design and engineering required for renovation of the bathroom buildings and the boat rental building within the main day-use recreation area of Baker Park Reserve
Project will complete the design and engineering necessary to construct 3.4 miles of paved trail connecting Lowry Nature Center in Carver Park to Lake Minnetonka Regional Park
Design, Engineering, Construction Administration and Construction of 4.6 acres of paved parking lots and 1.5 miles of paved roads within Lake Minnetonka Regional Park.
Lake Elmo Park Reserve. Build Winter Recreation Area including plan winter recreation area, develop recreation facilities to accommodate evening use; install lighting for ski trails and site; develop roads and parking lot; remodel barn for use as a trailhead. A?
Central Mississippi Riverfront Regional Park, redevelop Boom Island & BF Nelson picnic area, including playground replacement, bike and pedestrian trails, wading pool. Central Mississippi Riverfront Regional Park, develop master plan. Central Mississippi Riverfront Regional Park, construct playground. A?
Create a master plan for Minnehaha Parkway Regional Trail through extensive engagement with the community. Create a new master plan to provide direction for connecting more people to parks through future capital investment, and promote the park through its community engagement.
Develop and implement nature and outdoor recreation programming for people of color and lower income levels throughout Ramsey County Regional Parks and Trails system.
Design & engineering for final trail construction from Buerkle Road to Highway 96 including design & engineering for trails, sidewalk, storm water management, wetland impacts, landscape, signage, pedestrian bridge, site amenities; and design/engineering for preliminary trail extension plans between Highway 96 to County Road J consisting of design/engineering for trail alignment, amenities, conceptual pedestrian bridge, grading, landscaping, stormwater management, and signage; and prepare a master plan amendment for the Bruce Vento Regional Trail including design/engineering, commun
The USS Essex, a National Register Property located in Duluth, is Minnesota's only US Navy shipwreck, and the only known shipwreck originally built by renown shipbuilder Donald McKay. Its current location on the shoreline of Minnesota Point is unfavorable for long-term preservation. To ensure the long-term preservation of the Essex this project developed several options for the future of the Essex, and the requirements needed to fulfill those options.
Increasingly, people are turning to digital resources for answers to questions or as a starting point for research. MNopedia is a new digital resource for the public from the Minnesota Historical Society.
Working with the Minnesota Newspaper Association, local historical societies and newspaper publishers, the Minnesota Historical Society launched an innovative project to expand the number of contemporary newspapers available in digital form.
In the pilot phase of the project, the Society developed a methodology for digitizing, preserving and indexing newspaper content. Those processes will be tested with six newspapers and optimized in 2011.
Through this funding, the Minnesota Historical Society is advancing the work of making collections information available online. The Society is photographing 3D objects in the collections and completing corresponding descriptions that will be published online, allowing web site visitors to access an increasing volume of historical information.
Partner Organizations: Minnesota Geospatial Information Office (MNGeo), Minnesota Secretary of State, Minnesota Department of Transportation (MnDOT), Minnesota Association of County Surveyors (MACS), U.S. Bureau of Land Management (BLM)
The commissioner shall develop a ten-year strategic state parks and trails plan considering traditional funding and the funding available under the Minnesota Constitution, article XI, section 15. The plan shall incorporate the 25-year framework developed by the University of Minnesota Center for Changing Landscapes. (HF 1231, Art 3, Sec 2)
Work resulting from this appropriation resulted in the acquisition, development, and inclusion of 964 acres into the state Wildlife Management Area (WMA) system by way of five acquisitions. The acres acquired met the accomplishment plan goals of 960 acres, and spent 96% of the budget. The acquired acres compliment the WMA program by adding habitat function and natural resource ecosystem services.
This program provides critical assistance to MN DNR Parks and Trails Division Regional and District offices to assist with renewal and rehabilitation efforts prioritized locally by field staff. Projects include the following types: State Park Building and Facilities Emergency Repair and Maintenance, Paved Trail Maintenance and Asset Preservation, and State Park and State Forest Trail Renewal. This project is a newly reorganized budget area that consolidates these three smaller project areas reported on in previous years.
We restored and enhanced a total of 40,539 grassland acres with 446 activities on Wildlife Management Areas, Scientific and Natural Areas, Native Prairie Bank easements, Waterfowl Production Areas, and National Wildlife Refuges.
This DNR Aquatic Habitat appropriation used a programmatic approach to achieve prioritized aquatic habitat restoration and enhancement of lakes and streams. DNR modified two dams and replaced five culverts to restore fish passage on six streams. Twenty acres of habitat were restored on two streams and three acres of stream habitat were enhanced with this appropriation. All of these projects will provide excellent opportunities to educate the public on the importance of lake and stream habitat restoration and enhancement.
The 1901 Dodd Ford Bridge, a significant contributor to the development of Amboy, was slated for replacement by Blue Earth County. Federal funds were sought by the County for the project. This initiated section 106 and 4(f) reviews, which concluded that it would be prudent and feasible to renovate the bridge on site. However, more specific data is required about the historic bridge renovation program and costs. The grant money assisted in funding the hire of a consultant to examine costs and methods to restore and preserve the 1901 Dodd Ford Bridge.
The Drinking Water Contaminants of Emerging Concern (CEC) program identifies environmental contaminants for which current health-based standards currently do not exist or need to be updated, investigate the potential for human exposure to these chemicals, and develop guidance values for drinking water. Contaminants evaluated by CEC staff include contaminants that have been released or detected in Minnesota waters (surface water and groundwater) or that have the potential to migrate to or be detected in Minnesota waters.
This project will provide the data necessary to assess Eagle Lake. Assessment parameters will include chl-A, Total Phosphorous, secchi disk readings, temperature (2' interval), conductivity (2' interval), pH (2' interval), and dissolved oxygen (2' interval). These samples will be collected monthly from May through September.