This project will characterize unregulated drinking water contaminants at wells and intakes (which pump from groundwater, lakes, rivers), and to examine if they persist after standard public water system treatment.
Design of internal pathways to park facilities located between Cherokee Heights Blvd. and Chippewa Ave. Project includes internal design services, consultant and engineering fees, surveying, and soil analysis.
Design of internal pathways to park facilities located between Cherokee Heights Blvd. and Chippewa Ave. Project includes internal design services, consultant and engineering fees, surveying, and soil analysis.
The purpose of this project is to create a shared plan for the Watershed Restoration and Protection Strategy (WRAPS) process with roles, responsibilities, commitments and deliverables clearly understood by all (Minnesota Pollution Control Agency (MPCA), Chippewa River Watershed, and local partners). The MPCA and the Chippewa River Watershed Project (CRWP) will be working together to ascertain the level of involvement that local units of government and other partners want to engage in for the second round of the WRAPS process.