The Phase VII Habitat Restoration Program included an Orr Wetland Restoration, a Belshan Property Targeted Habitat Acquisition Project, and a Shell Rock River Streambank Restoration Project. As a result, 152 acres of habitat and wetlands were protected, enhanced or restored.
This project will complete an extension of the Shell Rock River Hydrologic Simulation Program FORTRAN (HSPF) watershed model application through the year 2018. Compliance scenarios will be executed to address potential expansion of discharges from the Albert Lea Wastewater Treatment Plant (WWTP).
This project is for surface water assessment in the Shell Rock and Winnebago River Watershed including four stream sites and two lake sites. Waters of concern include Lime creek, Bancroft creek, Goose creek, a tributary to Fountain Lake, Albert Lea Lake and State Line Lake. The outcomes includes establishing baseline data for the associated sample site.
This project will conduct the second round of Intensive Watershed Monitoring (IWM) for the Mississippi River St. Cloud watershed. Partnering organizations intend to complete sampling of lakes and streams following the protocols and guidance set forth by the Minnesota Pollution Control Agency (MPCA). Watershed partners include Benton Soil and Water Conservation District (SWCD), Clearwater Watershed District, Sherburne SWCD, Stearns SWCD, Stearns County staff, and Wright SWCD.
The goal of the project is the reduction of nitrates in the groundwater by promoting and implementing best management practices and alternative management tools in the priority areas of Sherburne County. Practices included in the application are: Cover crops, irrigation water management , and nutrient management. Additional incentives included are for the Conservation Reserve Program. District Staff will also plant at least one acre of demonstration plots which will be highlighted at an annual field day.
The proposed project area covers roughly one hundred square miles within Sibley County, but also includes a small portion of Nicollet County where Judicial Ditch 1A runs into the south branch of the Rush River. One lake and seven streams are part of the proposed project monitoring sites. Of the seven stream locations, two are part of the High Island Creek Watershed, while the remaining five are part of the Rush River Watershed. The lone lake, Lake Washington, falls within the Bevens Creek Watershed.
This project replaced the waterlines at the Sibley State Park that service the toilet/shower buildings and the drinking water supply in the Oak Ridge camground.
develop Park ID entrance signs at Regional Parks and Trails consisting of Design/Engineering, and phased construction of Park ID signs consisting of demolition, grading, landscaping, utilities, lighting, sidewalk, bituminous paving, curb and gutter, fencing, site equipment, amenities, and signs.
The Wright Soil and Water Conservation District (SWCD) will expand its partnership with its USDA partners; this will be the first time that SWCD staff will conduct compliance spot checks for USDA Highly Erodible Land plans. This activity will add a level of certainty that these plans are in compliance.
The Roseau River Watershed District in partnership with the Roseau County SWCD will complete a study to target and prioritize sites contributing impairments within legal drainage systems. Project partners will utilize data developed by the International Water Institute (IWI) Water Quality Decision Support Application that establishes multivariate scoring of each site based on all relevant features contributing to surface water degradation.
The Six Lakes subwatershed analysis will utilize previously completed watershed modeling to conduct subwatershed analyses for six high priority lakes that are closest to meeting state water quality standards or require protection due to high public use and declining water quality trends. This project will develop a long list of cost benefit ranked water quality best management practices based on concept design.
The Six Mile Creek Halsted Bay (SMCHB) Habitat Restoration program restored 2,488 acres of deep and shallow lake habitat by implementing the state's most ambitious program to manage common carp below the threshold where they damage lake ecosystems with three primary tactics: