Install fishing piers at 20 statewide locations (15 replacements and 5 new) with the goal of improving fishing opportunities especially for people with disabilities, children, elderly and those without a boat.
Renewal of existing State Trail surfaces, parking areas, and trail wayside areas, improving accessibility, enhancing user safety and implementing current best management practices. MNDNR Parks and Trails Division has a identified approximately 85 miles of existing state trail in need of rehabilitation and upgrading. This program also focuses on the rehabilitation or replacement of existing state trail bridges, including structural engineering inspections of all trail bridges .
Construction of stormwater harvest system to complete the re-introduction of the creek as a stormwater feature and recreational amenity for trail users. This is the final phase of providing healthy stream system along the trail. The creek will provide an enhanced connection between people, development and stormwater with open water, habitat, cleaner water at the outlet and a focus for the resting spots along the trail within the former brownfield site.
The primary outcome of this project will be to work with five local landowners to implement BMPs that focus on protection of the Renville County portion of the Minnesota River- Mankato Watershed from elevated nutrient levels, in particular phosphorus. This project will utilize outreach and education to incorporate public involvement and input into targeted BMP implementation and the decision making process of watershed issues.
To hire qualified professionals to rebuild the chancel wall in the Episcopal Church of the Good Samaritan, listed in the National Register of Historic Places.
Long-term forest plot datasets are helpful for understanding the changing conditions and ecology of forestland over time. The USDA Forest Service produced statewide forest inventories in 1935, 1953, 1962, 1977, 1990, 2003, 2008, and 2013. Unfortunately, only the data from 1977 to the present is currently easily accessible and available in full.
To restore the 1935 floor of the Litchfield Opera House as close as realistically possible to its original condition: with a finished and safe surface for public and catered events.
To hire qualified professionals to repair and restore windows in the Universal Laboratories Building, listed in the National Register of Historic Places.
This program annually evaluates a sample of up to ten Outdoor Heritage Fund habitat restoration projects and provides a report on the evaluations in accordance with state law (M.S. 97A.056, Subd. 10).
This project restored and enhanced rare and unique plant and animal communities identified by the DNR's County Biological Survey. Over 293 acres of prairie, forest, wetland were restored and enhanced. Ultimately, the county was able to approach or exceed the goal of 20% increase in diversity across all three habitats based on plant surveys conducted.
This program annually evaluates a sample of up to twenty Outdoor Heritage Fund habitat restoration projects, provides a report on the evaluations in accordance with state law and delivers communications on project outcomes and lessons learned in restoration practice. Accomplishments are summarized in the attached 2019 Annual Report. The 2019 report focuses specifically on stream restoration.
Capitol Region Watershed District is partnering with St. Paul Public Schools to implement a variety of highly visible Best Management Practices at Central High School that will improve the quality of stormwater discharged to the Mississippi River. A tremendous amount of sediment is discharged from the school annually due to the large impervious areas and lack of vegetation. Implementing the projects will reduce sediment by 86% and phosphorus by 90% over the target area annually.
Utilizing the new CREP III partnership to secure permanent conservation easements, this Phase 7 continuation of the RIM Buffers Program will protect and restore riparian buffer areas, totaling 4,106 acres on approximately 244 easements. This Program will continue to utilize a science-based ranking and selection process and be implemented locally, working with SWCD, NRCS, and FSA staff in the 54 county CREP area. It is estimated that $1 of OHF will be leveraged with $1 of Clean Water Funds and at least $4 of Federal funds through CREP.
Under the CREP partnership with USDA, 38 easements were recorded on a total of 2,732 acres to restore previously drained wetlands and adjacent uplands. One easement is a flowage easement that was required to complete wetland restoration work on an adjacent
This program is a part of a comprehensive clean water strategy to prevent sediment and nutrients from entering our lakes, rivers, and streams; enhance fish and wildlife habitat; protect groundwater and wetlands. Specifically the Riparian Buffer Easement Program targets creating buffers on riparian lands adjacent to lakes, rivers, streams and tributaries. Through the Reinvest in Minnesota Program (RIM) and in partnership with Soil and Water Conservation Districts and private landowners, permanent conservation easements are purchased and buffers established.
Lilydale-Harriet Island Regional Park. Continued phased implementation of approved Lilydale Regional Park Master Plan elements that may include such amenities as construction of approx. 3,000 lineal feet of roadway, trail, and related facilities. Lilydale
To hire qualified professionals to repair the flooring in the Hennepin County Library, Robbinsdale Branch, listed in the National Register of Historic Places.