The Red Lake Watershed District will create an inspection database for 103E ditches under their drainage authority. The district will acquire a database software solution to conduct field inspections and to track ditch maintenance projects and use the software to facilitate compliance with state statutes. The project will also develop a process for completing the annual inspection and reporting requirements under Statue 103E.
The objective of this project is to collect real-time parameter data for specific conductance, water temperature, pH, dissolved oxygen, turbidity and stream flow at the United States Geological Survey (USGS) gaging stations located at Fargo and Grand Forks North Dakota.
This project will monitor nine locations in the major watersheds (8-digit Hydrologic Unit Codes) of the Lower Red River Basin. The stream outlet monitoring will provide the water chemistry data needed to calculate annual pollutant loads. Staff from the Red River Watershed Management Board (RRWMB) will conduct the sampling, initially manage the data and provide the data to the Minnesota Pollution Control Agency (MPCA) for load calculations and import into the STORET data system.
The goal of this project is to collect real-time, parameter data for specific conductance, water temperature, pH, dissolved oxygen, turbidity, and stream flow at the United States Geological Survey (USGS) gaging stations located at Fargo and Grand Forks, ND on the Red River of the North. The data will be published on the USGS National Water Information System (NWIS) website.
The goal of this project is to extend, calibrate, and validate the existing Hydrological Simulation Program – FORTRAN (HSPF) watershed models in the Red Lake River, Thief River, Clearwater River and Red Lake watersheds.
International Water Institute (IWI) staff will monitor 24 sites in the Bois de Sioux, Mustinka (2 sites), Buffalo (8 sites), Red Lake (4 sites), Sandhill (3 sites), Thief (2 sites), and Tamarac River (3 sites) Watersheds intensively over a 2 year period in an attempt to collect 25 samples per year at each site. If conditions allow for the collection of all planned samples, 1200 stream samples will be collected over the time period. Monitoring will include field measurements, observations, and at least three photographs during each site visit.
MN Legislative Clean Water Fund funding to engage citizens in local watershed monitoring, work with regional partners to promote understanding and protection of watersheds, and organize and facilitate gathering of scientific data all for the benefit of water quality in the Red River Basin.
The purpose of this project is to improve understanding of primary productivity in the Red River and the diversity and population structure of the algal communities occurring along the river system. This will be accomplished through taxonomic identification of periphyton and phytoplankton assemblages necessary for characterizing responses to nutrient gradients along the Red River of the North.
This project is planned in the Skunk Creek subwatershed, which empties into the turbidity impaired Nemadji River. The goal of the project will restore the stream and stabilize the bank where a 30 year old sediment retention structure failed, releasing sediment into the Nemadji Watershed. In addition, remaining structures within the watershed will be prioritized and a discussion between land owners and permitting organizations will be initiated. This project will prevent an estimated 80 tons of sediment from annually entering into the Nemadji River.
The purpose of the project is to reduce the amount of sediment entering Burnham Creek, which is a tributary of the Red Lake River within the Red River Basin. The Red Lake River is classified as a source water protection area for the City of East Grand Forks and currently does not meet state water quality standards for sediment. The goal of this project is to install one grade stabilization structure within the channel which outlets into the Burnham Creek channel and two side water inlets with buffers.
To complete a critical .52 mile segment of recreational trail along the Mississippi Riverfront that will connect Levee Park in Red Wing's Historic Downtown to the local and regional trail system
The goal of this project is to engage citizens in local watershed monitoring, work with regional partners to promote understanding and protection of watersheds, and organize and facilitate gathering of scientific data for the benefit of water quality in the Red River Basin.
The goal of this project is to engage citizens in local watershed monitoring, work with regional partners to promote understanding and protection of watersheds, and organize and facilitate gathering of scientific data for the benefit of water quality in the Red River Basin.
The goal of this project is to construct, calibrate, and validate a watershed model using the Hydrological Simulation Program FORTRAN (HSPF) model for the Upper/Lower Red Lake Watershed. The contractor will produce an HSPF model that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDL) Studies. The model will generate predicted output for hydrology, sediment, nutrients, and dissolved oxygen that is consistent with observed data.
To support Ojibwe language learners on the Red Lake Nation through various platforms: community language efforts, cultural events, Ojibwe language Immersion camp and online.
The Red River Watershed Management Board (RRWMB) will partner with the Board of Water and Soil Resources (BWSR) on this basin-wide initiative to establish 780 acres of riparian/upland habitat within the Red River Basin (RRB) in Northwest Minnesota. This initiative will use BWSR's Reinvest in Minnesota (RIM) Program to target permanent conservation easements on agricultural lands to restore and protect stream and riparian habitat.
This project develops and implements an interactive facilitated curriculum for Indigenous leadership-in-action designed to empower Native peoples in Minnesota with traditional knowledge and concepts of leadership that were disrupted by the boarding school era and many other systemic efforts of cultural erasure.
Phase 2 development of the Hyland Play area--the Park District's most popular play area. A? Phase 2 will consist of expansion of the current play area to add additional play elements which will increase capacity for the site.
Supplement design and construction cost for the redevelopment of the existing playground in the Upper Afton section of Battle Creek Regional Park consisting of demolition, grading, utilities, trails, lighting, construction, landscaping, site amenities, signage, new playground container and playground equipment, and safety surfacing The plan is to improve accessibility and play value.
Supplement design and construction cost for the redevelopment of the existing playground in the Upper Afton section of Battle Creek Regional Park consisting of demolition, grading, utilities, trails, lighting, construction, landscaping, site amenities, signage, new playground container and playground equipment, and safety surfacing The plan is to improve accessibility and play value.
This project will monitor streams in target watersheds located in Ottertail and Wadena counties. Six sites have been identified by MPCA for biological monitoring; this project will complete the chemical and field analysis at these six sites.
The Redeye River watershed is conducting the second intensive watershed assessment. The water quality in the watershed is still pretty healthy, but the streams with poor water quality identified previously are still not meeting water quality standards. The goal during this cycle is to better identify problem areas so that parcel specific implementation can occur to achieve improved water quality. The best method available to better target implementation is through culvert inventories, visual and desktop surveys, as well as outreach.
Watershed based implementation funds will be used to target conservation practices utilizing the principles associated with Prioritize, Target and Measure as referenced in our Local Comprehensive Watershed Management Plan. The following are projects/practices, and their associated pollution reduction estimates, that are included in this budget request: (500 acres of Nonstructural BMPs) to protect/improve land management and reduce bacteria will reduce phosphorus by 65 lbs/yr, nitrogen by 520 lbs/yr, and sediment by 285 tons/yr.