This project addresses the identified need for an Implementation Plan that provides an overall roadmap for the effort it will take to meet the Carnelian Marine St. Croix Multi-Lakes Total Maximum Daily Load (TMDL). An Implementation Plan will be developed, with involvement of the Project Partners and stakeholder groups, that sets forth prioritized strategies for attaining the TMDL and a method for tracking the progress of those efforts. The Implementation Plan will be restoration-focused, but will include protection-oriented information/actions as well.
This project will implement watershed load reduction practices to restore the top priority water body in the Carnelian Marine St. Croix Watershed District in northeast Washington County. Recently completed prioritization and targeting efforts have identified several Best Management Practice opportunities around goose Lake, the number one priority for implementation practices.
Continued TMDL project to support next phases associated with completion of TMDL's for ten lakes in the Carnelian Marine Saint Croix Watershed District (CMSCWD). Ten lakes are; East Boot, Fish, Goose, Hay, Jellum’s, Long, Loon, Louise, Mud and South Twin.
To document and display past and current county history through photographs at the Carver County Fair. Selected photographs will represent a cross-section of topics, people, and places in Carver County.
This project will increase the ability of the Carver County Water Management Organization (CCWMO) to approach local community partners and fund projects that treat stormwater runoff at the source instead of treating stormwater downstream at a regional pond or through other large scale best management practices (BMPs). The CCWMO will target three geographic areas that have demonstrated strong community involvement, effective partner relationships, and support for the goal of improving water quality of locally impaired waters or regionally significant water body.
The Carver County Planning and Water Management Department (PWM) has an active well sealing cost share program. Following the adoption of the updated County Groundwater Plan in February of 2016, the Carver County Board of Commissioners moved to accelerate the program to encourage landowners to seal abandoned wells. Carver County is looking to supplement existing funds, as demand is expected to increase. With this additional funding, it is the goal of Carver County PWM to seal an additional 15 wells county wide.
Carver County Staff will monitor Silver Creek at station S000-843 following the basic monitoring regime. S000-843 is located in the Lower Minnesota subwatershed in southeastern Carver County. The monitoring will be conducted from 2014 to 2015 and include 13 site visits in 2014; collecting TSVS, TSS, Total P, Ammonia-N, TKN, NO2+NO3, Sulfate, Chloride, and Hardness as CaCO3 ten times. E.coli will be collected nine times in 2014.
This project saw the electrification of 20 campsites in Cascade State Park. RV camping is extremely popular, and the North Shore has very few electrified campsites within our state park system. These new electric sites satisfy some of the incredible demand for this amenity.
Ramsey-Washington Metro Watershed District (RWMWD) will improve water quality in Casey Lake and ultimately Kohlman Lake through the installation of approximately 25 rain gardens on priority properties identified as part of the Casey Lake Urban Stormwater Retrofit Assessment completed by Ramsey Conservation District (RCD) in 2011.
To remodel an existing commercial building to be established as the Pillager Arts Center. The Pillager Arts Center will be an epicenter for arts education for the community and serve as a space where people can interact with other creative minds.
To update and enhance cultural heritage exhibits at the Cass County Fair. Projects will include brightening display areas, installing speakers, and removing outdated displays to replace with new exhibits of art and cultural artifacts from the Leech Lake Band of Ojibwa and other pieces relating to regional heritage.
This 3-part project is developing and installing shoreline buffer projects on Ten Mile Lake, and the Roosevelt, Lawrence, Leavitt Lake area (RALALA).An additional part will correct roadway erosion contributing to sedimentation and water quality degradation on Buxton Road between McKeowen and Mann Lakes. Woodrow Township will work with Cass County SWCD/ESD and adjacent landowners to construct sedimentation basins and rain gardens and restructure the roadbed by reducing the slope to eliminate erosion and sedimentation.
This monitoring project includes lake and stream monitoring and encompasses all of Cass County, and surrounding counties. The project will obtain water quality data for streams; in 2009, lakeshed assessments indicated that many surface waters throughout the county were data deficient. This project will address the need for sufficient data on a county-wide basis and fulfill the State’s intensive watershed monitoring program goals by obtaining water quality data at targeted lake and stream sites.
This project will include lake and stream monitoring on 23 lakes and 4 streams found within the Leech Lake River and Pine River watersheds in Cass County. The project will be conducted in an effort to gain sufficient data on these data-deficient lake and stream sites within these watersheds. All of the proposed monitoring sites are target sites located in the targeted watersheds for 2012. Cass ESD is partnering with Hubbard SWCD, the Leech Lake Band of Objibwe, and RMB Environmental Laboratories to conduct the fieldwork for this project.
To hire qualified professionals to catalog hundreds of books in the Minnesota Genealogical Society's collections, to allow greater access to these resources.
Preservation of a historically important collection of photographs, taken for the purposes of insurance underwriting in the mid-1950's, was the goal of this project. Appropriate storage was researched and determined. Archival grade sleeves and storage boxes were obtained. An inventory of all photographs was performed, cataloged and entered into a professional software database. Digital imaging of the original photographic prints provides researchers with a sustainable alternative to viewing the prints.
To fully catalog the museum's inventoried collection that documents the history of art in Minnesota under the direction of a qualified museum registrar.
Crow Wing SWCD is building off its success with Project Recharge and expanded the program to target Gull and Big Trout lakes. The SWCD selected these two lakes because of their declining transparency readings, 25 interested landowners, 2 adjacent resorts, and the community support, past partnerships, valuable fisheries, high ratio of forested land, and low ratio of impervious area in the lakeshed.The SWCD worked with partners to find willing landowners and businesses to complete the following types of projects:Swap Rock for Native Stock: Implement bioengineering to stabilize shorelines.
Harmful ?forever chemicals? were recently discovered in rainbow smelt- what else are we missing? We seek to protect anglers and their families by uncovering unknown contamination threats to Minnesota fish.