This project works to reduce energy consumption and model renewable energy methods on state park, state recreation area, state forest and trail facilities. The DNR Parks and Trails Division is working to increase the use of energy conservation and renewable energy technologies.
Install fishing piers at 20 statewide locations (15 replacements and 5 new) with the goal of improving fishing opportunities especially for people with disabilities, children, elderly and those without a boat.
Renewal of existing State Trail surfaces, parking areas, and trail wayside areas, improving accessibility, enhancing user safety and implementing current best management practices. MNDNR Parks and Trails Division has a identified approximately 85 miles of existing state trail in need of rehabilitation and upgrading. This program also focuses on the rehabilitation or replacement of existing state trail bridges, including structural engineering inspections of all trail bridges .
Construction of stormwater harvest system to complete the re-introduction of the creek as a stormwater feature and recreational amenity for trail users. This is the final phase of providing healthy stream system along the trail. The creek will provide an enhanced connection between people, development and stormwater with open water, habitat, cleaner water at the outlet and a focus for the resting spots along the trail within the former brownfield site.
St. Croix Bluffs Regional Park. Replace campground shower building, dump station, well, septic, provide electric to campsites, water distribution to campground, trails, parking, and related infrastructure, landscaping.
Bunker Hills Regional Park, replace wave pool filtration system. Rice Creek Chain of Lakes Regional Park, design and reconstruct roads, campsites, utilities, landscaping.
Spring Lake Park Reserve, restore prairie at Schaar's Bluff Gathering Center campus including ecological improvement of 1,500 feet of Mississippi River bluff.
At Battle Creek Regional Park, restore 200 acres of prairie and oak savanna providing additional quality habitat for a variety of wildlife species, including those of greatest conservation need (e.g. Meadow Larks, Bobolinks and other grassland birds).
State law (M.L. 2011, First Special Session, Ch. 6) directs restoration evaluations to be conducted on habitat restoration projects completed with funds from the Parks and Trails Fund (M.S. 85.53). The Minnesota Department of Natural Resources (DNR) is responsible for convening a Restoration Evaluation Panel containing at least five technical experts who will evaluate a sample of up to 10 habitat restoration projects annually. The Panel will evaluate the restorations relative to the law, current science, stated goals and standards in the restoration plans, and applicable guidelines.
Central Mississippi Riverfront Regional Park, revise master plan to guide future trail development and improvements throughout park including Father Hennepin Bluffs, Nicollet Island, BF Nelson, Boom Island, and Mill Ruins.
Reconstruct the park entrance from Main St. to the Centerville boat launch parking lot, improve the boat launch and add an equity related space for teens/students at the beach area. Work will include design, engineering, construction, drainage improvements, lighting, landscape/natural resource restoration, signage, site furnishings, utility work, fee and contingencies.
This project will reconstruct the park entrance from Main Street to the Centerville boat launch parking lot, improve the boat launch and add an equity related space for teens/students at the beach area. Work will include design, engineering, construction, drainage improvements, lighting, landscape/natural resource restoration, signage, site furnishings, utility work, fees, and contingencies.
Create new and improve existing interpretive displays, upgrade site furnishings, and building improvements. Work will include design, engineering, and construction of exhibits, displays, furnishings and improvements.
Develop outdoor recreation facilities including a nature study/observation area, roads and trails, information boards and signs. Park includes shoreline adjacent to the Mississippi Wild & Scenic River. The new trails will provide safety and accessibility along the bluff line overlooking the river and prevent erosion caused by existing, informal earthen trails.
Lilydale-Harriet Island Regional Park. Continued phased implementation of approved Lilydale Regional Park Master Plan elements that may include such amenities as construction of approx. 3,000 lineal feet of roadway, trail, and related facilities. Lilydale
Lilydale-Harriet Island Regional Park. Continued phased implementation of approved Lilydale Regional Park Master Plan elements that may include such amenities as construction of approx. 3,000 lineal feet of roadway, trail, and related facilities. Lilydale
Como Regional Park. Continue implementation of the Master Plan to include completion of Estabrook Road reconstruction and installation of Historic Lantern-style lighting from west end of the Frog Pond to intersection at Lexington Parkway.
Finish construction of 3.71 miles of the Robert Piram Regional Trail. Project may include construction of trail-related amenities. Previous funding rounds provided the remainder of the construction budget.