All Projects

472 Results for
Recipient
East Otter Tail SWCD
2017 Fiscal Year Funding Amount
$52,556
Fund Source

This project will determine the condition of the water bodies in the Otter Tail River watershed, initiate public participation in the Watershed Restoration and Protection Strategy (WRAPS) development process, begin identification of potential stressors and priority management areas within the watershed, and begin development of initial drafts of the Total Maximum Daily Load (TMDL) study and WRAPS report.

Becker
Clearwater
Otter Tail
Wilkin
Recipient
Otter Tail, East SWCD
2017 Fiscal Year Funding Amount
$16,225
Fund Source

The Otter Tail Water Management District (OTWMD) manages the wastewater for nearly 1,750 private residences near Otter Tail Lake, Deer Lake, and Lake Blanche. There OTWMD is responsible for 101 monitoring wells that were installed in 1984 and 1985 that are no longer being used and need to be properly sealed. The goal of this project is for the East Otter Tail Soil and Water Conservation District (EOTSWCD) to assist the OTWMD in properly sealing 100% of the monitoring wells that are located within the Otter Tail Surficial Aquifer.

Otter Tail
Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$75,000
Fund Source

The goal of this project is to complete the construction, calibration, and validation of a Hydrological Simulation Program FORTRAN (HSPF) watershed model for the Otter Tail River watershed. The contractor will produce an HSPF model that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDL) Studies. The model will generate predicted output for hydrology, sediment, nutrients, and dissolved oxygen that is consistent with observed data.

Becker
Clay
Clearwater
Mahnomen
Otter Tail
Wilkin
Recipient
Otter Tail, East SWCD
2017 Fiscal Year Funding Amount
$471,000
Fund Source

The purpose of this project is to develop a detailed tool that can be used in all watersheds within the Otter Tail and Becker counties to prioritize, target, and measure implementation practices at the field scale. The PTM App will significantly increase the targeting capabilities in Otter Tail and Becker Counties. The Watershed Restoration and Protection Strategy has not been completed for Otter Tail County, yet, and the PTM App will be able to assist targeting and prioritizing when those documents are created.

Becker
Otter Tail
Recipient
Saint Croix Watershed Research Station
2017 Fiscal Year Funding Amount
$100,000
Fund Source

The goal of this project is to better target restoration activities in the Cannon River watershed via a paleolimnological study of a selected set of the lakes addressed in the Total Maximum Daily Load (TMDL) for the watershed. The goals are to better constrain lake phosphorus budgets, and determine the magnitude of ecological change experienced by a range of lake types.

Le Sueur
Rice
Recipient
Middle St. Croix River WMO
2017 Fiscal Year Funding Amount
$63,000
Fund Source

Perro Creek drains directly into the nutrient impaired St. Croix River. This project focuses on landowner outreach, design and installation of up to 10 bioinfiltration best management practices to reduce pollution from 85 acres of urban land draining directly into Perro Creek, then into Lake St. Croix with no water quality treatment. The installation of these practices will not only reduce stormwater volumes, but also the nutrients that are the root cause of the nutrient impairment in Lake St. Croix as well as the stormwater bacteria contributions to Perro Creek.

Washington
Recipient
Minnesota Department of Agriculture
2024 Fiscal Year Funding Amount
$350,000
2023 Fiscal Year Funding Amount
$350,000
2022 Fiscal Year Funding Amount
$350,000
2021 Fiscal Year Funding Amount
$350,000
2020 Fiscal Year Funding Amount
$350,000
2019 Fiscal Year Funding Amount
$350,000
2018 Fiscal Year Funding Amount
$350,000
2017 Fiscal Year Funding Amount
$350,000
2016 Fiscal Year Funding Amount
$350,000
2015 Fiscal Year Funding Amount
$350,000
2014 Fiscal Year Funding Amount
$350,000
2013 Fiscal Year Funding Amount
$350,000
2012 Fiscal Year Funding Amount
$350,000
2011 Fiscal Year Funding Amount
$350,000
2010 Fiscal Year Funding Amount
$325,000
Fund Source

The purpose of the Minnesota Department of Agriculture's monitoring activities is to determine the presence and concentration of pesticides in Minnesota's groundwater and surface water. Monitoring information is used to characterize and assess the extent of pesticide impacts to Minnesota's water resources.

Statewide
Recipient
Emmons & Olivier Resources Inc
2017 Fiscal Year Funding Amount
$3,459
Fund Source

This project is a continuation of a Total Maximum Daily Load (TMDL) study that addresses lake eutrophication (phosphorus) in two lakes that are on the 2014 United States Environmental Protection Agency 303(d) list of impaired waters, located in the Pine River Watershed. The contractor will be responding to public comment on the Pine River TMDL.

Aitkin
Cass
Crow Wing
Hubbard
Recipient
Emmons & Olivier Resources Inc
2017 Fiscal Year Funding Amount
$2,427
Fund Source

The purpose of this project is to address Environmental Protection Agency (EPA) comments on the pre-public notice draft Total Maximum Daily Load (TMDL) report that were received by Minnesota Pollution Control Agency (MPCA) in January 2016.

Cass
Crow Wing
Recipient
Wenck Associates Inc
2017 Fiscal Year Funding Amount
$8,471
Fund Source

The overall goal is to develop a Watershed Restoration and Protection Strategy (WRAPS) Report and Total Maximum Daily Load (TMDL) Study that will address water quality impairments and maintain or improve water quality throughout the Pioneer Sarah Creek watershed, which is part of the North and South Fork Crow major watersheds. The study will identify sources of pollutants to the streams and lakes, allocate pollution reduction goals, and prioritize and identify implementation strategies to maintain or improve water quality in key lakes and streams in the watershed.

Hennepin
Recipient
Sand Hill River WD
2017 Fiscal Year Funding Amount
$68,800
Fund Source

Consistent with the implementation recommendation of the Total Maximum Daily Load Study , the goal of this project is to install 30 grade stabilization structures along Polk County Ditch 80 to reduce sediment loading by 270 tons per year. Polk County Ditch 80 contributes a large amount of sediment to the Sand Hill River which currently does not meet state water quality standards for sediment.

Polk
Recipient
Pomme de Tere River Association
2017 Fiscal Year Funding Amount
$46,133
Fund Source

The Pomme de Terre River Association will partner with the Minnesota Pollution Control Agency to conduct water quality monitoring in the Pomme de Terre River Watershed. The purpose will be to determine if waters meet the states non-point source pollution standards. The data collected will be utilized to produce the cycle two Watershed Restoration and Protection Strategy (WRAPS) report and supporting documents for the watershed. Through the utilization of this funding a total of 11 lakes and 7 stream reaches will be assessed.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
Pomme de Terre River Association
2017 Fiscal Year Funding Amount
$52,000
Fund Source

This project will establish a framework with the Pomme de Terre River Association (PDTRA), county staff, Soil and Water Conservation District staff, and state agencies that will outline their involvement throughout the development of the Watershed Restoration and Protection Strategy (WRAPS) for the Pomme de Terre River watershed. This work will form the basis to establish restoration and protection strategies that local governments and watershed organizations can use to make decisions that will lead to protecting and restoring the waters in the watershed.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
RESPEC
2017 Fiscal Year Funding Amount
$19,996
Fund Source

The goal of this project is to extend through 2016, calibrate, and validate the existing watershed model using Hydrological Simulation Program FORTRAN (HSPF) for the Pomme de Terre River Watershed. The contractor will produce an HSPF model that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDL) studies.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
Sauk River WD
2017 Fiscal Year Funding Amount
$210,570
Fund Source

Pope County Ditch 6 (CD 6) is an 18 mile channelized watershed and a primary tributary to Ashley Creek. CD6 and Ashley Creek are impaired for bacteria, dissolved oxygen and aquatic organisms. This project will address the storm water runoff concerns identified within this public drainage system in conjunction with repairs scheduled for 2017-2018. Alternative intake structures to manage nutrients and other practices, such as water and sediment control basins, will be installed to retain water on the upland properties and minimize flow rate and velocity.

Pope
Recipient
Okabena-Ocheda WD
2017 Fiscal Year Funding Amount
$428,000
Fund Source

Lake Okabena does not meet state water quality standards due to high phosphorus levels. The Total Daily Maximum Load Study identified a 70% reduction in phosphorus from the watershed is needed to meet water quality standards. The City of Worthington owns the recently closed Prairie View Golf Course. Okabena Creek flows through the golf course and some small ponds. This project will modify these three ponds to increase storage and removal efficiency, and add an iron-enhanced filter bench to enhance soluble phosphorus removal.

Nobles
Recipient
Buffalo-Red River WD
2017 Fiscal Year Funding Amount
$168,000
Fund Source

This project will result in the development of three critical pieces of information. They include: 1. Development of restoration and protection strategies for all waterbodies in the district relative to the State's Non-point Source Funding plan 2. Use of PTMApp to tie the WRAPs implementation tables from the Buffalo and Red River Watersheds to targeted on-the-ground projects and practices that will provide measurable water quality improvements, and 3.

Becker
Clay
Otter Tail
Wilkin
Recipient
Minnesota Department of Health
2020 Fiscal Year Funding Amount
$750,000
2019 Fiscal Year Funding Amount
$400,000
2018 Fiscal Year Funding Amount
$400,000
2017 Fiscal Year Funding Amount
$325,000
2015 Fiscal Year Funding Amount
$325,000
2014 Fiscal Year Funding Amount
$325,000
Fund Source

This project aims to ensure private wells are a safe source of drinking water, are tested regularly, and water quality issues are addressed.

Statewide
Recipient
Minnesota Pollution Control Agency
2014 Fiscal Year Funding Amount
$1,500,000
2015 Fiscal Year Funding Amount
$1,500,000
2016 Fiscal Year Funding Amount
$940,000
2017 Fiscal Year Funding Amount
$1,060,000
2018 Fiscal Year Funding Amount
$50,000
2019 Fiscal Year Funding Amount
$1,950,000
2020 Fiscal Year Funding Amount
$300,000
2021 Fiscal Year Funding Amount
$1,180,000
2022 Fiscal Year Funding Amount
$270,000
2023 Fiscal Year Funding Amount
$1,200,000
Fund Source

This will fund a competitive grant program for sewer projects that will help protect or restore the water quality of waters in national parks located within Minnesota.

Statewide
Recipient
Emmons & Olivier Resources Inc
2017 Fiscal Year Funding Amount
$7,469
Fund Source

This project is for technical assistance during the Lake Winona Nutrient Total Maximum Daily Load (TMDL) public notice and revisions to the document prior to sending to the Environmental Protection Agency (EPA) for final approval.

Douglas
Recipient
Anoka CD
2017 Fiscal Year Funding Amount
$467,968
Fund Source

Golden Lake does not meet state water quality standards due to high phosphorus levels. The proposed iron enhanced sand filter basin was identified in the Golden Lake Subwatershed Stormwater Retrofit Analysis to be one of the most cost effective remaining practices for reducing external phosphorus loads to Golden Lake. This project, paired with two previously installed upstream Best Management Practices, will achieve on average, 84% of the phosphorus reduction goal for the watershed.

Anoka
Recipient
Otter Tail, West SWCD
2017 Fiscal Year Funding Amount
$54,800
Fund Source

Realizing the need for increased technical capacity in the field offices, the Becker, East Otter Tail and West Otter Tail Soil and Water Conservation Districts have developed an agreement that will increase technical capacity while minimizing costs to each district. The first step was taken in this agreement through the recent hire of a shared engineer. Currently, minimal survey grade equipment is owned by the districts. This grant will be used to purchase an integrated survey system.

Becker
Otter Tail
Recipient
Koochiching County SWCD
2017 Fiscal Year Funding Amount
$99,930
Fund Source

This project will provide an important framework for civic and citizen engagement and communication in the International Rainy River-Lake of the Woods Watershed, which will contribute to long-term public participation in surface water protection and restoration activities.

Cook
Itasca
Koochiching
Lake
Lake of the Woods
St. Louis
Recipient
Ramsey Conservation District
2017 Fiscal Year Funding Amount
$108,000
Fund Source

Ramsey County, the most densely populated county in Minnesota, generates high levels of contaminated runoff from its impervious surfaces, which can have damaging effects on both surface water and groundwater. Concerns arise when these contaminants drain into abandoned and unused wells, threatening the quality of groundwater, especially in drinking water supply areas, wellhead protection areas, or groundwater recharge zones.

Ramsey
Recipient
Lake of the Woods SWCD
2017 Fiscal Year Funding Amount
$143,880
2019 Fiscal Year Funding Amount
$43,283
Fund Source

The Rapid River Watershed Restoration and Protection Strategy (WRAPS) project will result in the development of the restoration and protection strategies for the watershed and engage the local stakeholders in the practices of watershed management. This project will also develop Total Maximum Daily Loads (TMDLs) for impaired waters.

Koochiching
Lake of the Woods
Recipient
US Geological Survey
2017 Fiscal Year Funding Amount
$12,520
Fund Source

The goal of this project is to collect real-time, parameter data for specific conductance, water temperature, pH, dissolved oxygen, turbidity, and stream flow at the United States Geological Survey (USGS) gaging stations located at Fargo and Grand Forks, ND on the Red River of the North. The data will be published on the USGS National Water Information System (NWIS) website.

Clay
Polk
Recipient
RESPEC
2017 Fiscal Year Funding Amount
$49,999
Fund Source

The goal of this project is to extend, calibrate, and validate the existing Hydrological Simulation Program – FORTRAN (HSPF) watershed models in the Red Lake River, Thief River, Clearwater River and Red Lake watersheds.

Beltrami
Clearwater
Mahnomen
Marshall
Pennington
Polk
Red Lake
Recipient
Carlton SWCD
2017 Fiscal Year Funding Amount
$95,773
Fund Source

This project is planned in the Skunk Creek subwatershed, which empties into the turbidity impaired Nemadji River. The goal of the project will restore the stream and stabilize the bank where a 30 year old sediment retention structure failed, releasing sediment into the Nemadji Watershed. In addition, remaining structures within the watershed will be prioritized and a discussion between land owners and permitting organizations will be initiated. This project will prevent an estimated 80 tons of sediment from annually entering into the Nemadji River.

Carlton
Recipient
Polk, West SWCD
2017 Fiscal Year Funding Amount
$103,000
Fund Source

The purpose of the project is to reduce the amount of sediment entering Burnham Creek, which is a tributary of the Red Lake River within the Red River Basin. The Red Lake River is classified as a source water protection area for the City of East Grand Forks and currently does not meet state water quality standards for sediment. The goal of this project is to install one grade stabilization structure within the channel which outlets into the Burnham Creek channel and two side water inlets with buffers.

Polk
Recipient
Redwood-Cottonwood Rivers Control Area
2017 Fiscal Year Funding Amount
$76,111
Fund Source

In 2017 and 2018, Redwood-Cottonwood Rivers Control Area (RCRCA) will collect water chemistry samples from the 10 lakes and 24 stream sites identified in the Redwood and Cottonwood River watersheds. Six samples will be collected at 10 lakes from May through September in 2017; five samples will be collected at 5 lakes in 2018 from May through September. Eleven samples will be collected at each of the 24 stream sites following the Basic Regime in 2017. Sixteen samples at each stream site will be collected in 2017 and 2018 following the E.coli monitoring regime.

Brown
Cottonwood
Lincoln
Lyon
Murray
Pipestone
Redwood
Yellow Medicine
Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$86,582
Fund Source

The goal of this project is to complete the construction, calibration, and validation of an Hydrological Simulation Program FORTRAN (HSPF) watershed model for the Minnesota portions of three watersheds: Root River, Upper Iowa, and Mississippi River-Reno.

Fillmore
Houston
Mower
Olmsted
Winona
Recipient
Roseau River Watershed District
2017 Fiscal Year Funding Amount
$99,999
2020 Fiscal Year Funding Amount
$130,000
Fund Source

This is the second phase of the Roseau River Watershed Restoration and Protection Strategy (WRAPS) project, which includes: developing the Total Maximum Daily Load (TMDL) study, pollutant load allocations, watershed restoration and protection strategies, and conducting civic engagement.

Kittson
Roseau
Recipient
Elm Creek WMC
2017 Fiscal Year Funding Amount
$60,000
Fund Source

Seven lakes and four streams in the Elm Creek watershed are impaired by excess nutrients, bacteria, low oxygen, and unhealthy biotic communities. Modeling completed for the Watershed Restoration and Protection Strategy identified areas that contribute high loads of sediment and nutrients to the streams and lakes in the watershed, however, the scale of that modeling was not sufficient to pinpoint to the field level where BMPs would be most effective. The Rush Creek Headwaters Subwatershed Assessment will evaluate four high pollutant loading catchments.

Hennepin
Recipient
Saint Francis, City of
2017 Fiscal Year Funding Amount
$7,000,000
Fund Source

Construct wastewater treatment improvements to meet TMDL wasteload requirement

Anoka
Recipient
RESPEC
2017 Fiscal Year Funding Amount
$9,998
Fund Source

The goal of this project is to update the time series and calibration for the Sandhill River Hydrological Simulation Program – FORTRAN (HSPF) model.

Mahnomen
Norman
Polk
Recipient
Stearns SWCD
2017 Fiscal Year Funding Amount
$150,000
Fund Source

The Sauk River Chain of Lakes Community Partners Area has many lakes that are not meeting state water quality standards or are in jeopardy of not meeting standards and are in desperate need of runoff reduction strategies. The Stearns County Soil and Water Conservation District is eager to work with willing sponsors within the project area to educate, inform and expand the conservation culture to assist in siting and implementing water quality projects on the landscape.

Stearns
Recipient
RESPEC
2017 Fiscal Year Funding Amount
$74,991
Fund Source

The contractor will provide 4 day-long training sessions for the Scenario Analysis Manager (SAM) and 2 Processing Application Tool for HSPF (PATH) sessions. The SAM tool’s framework currently consists of a pre-processor (PATH) for interactively translating HSPF model application files, a Geographic Information System (GIS) for best management practice (BMP) site selection, a BMP database with pollutant removal efficiencies and associated costs, and scenario analysis, optimization, and reporting capabilities.

Statewide
Recipient
RESPEC
2017 Fiscal Year Funding Amount
$69,995
Fund Source

The contractor will collect and process the necessary files needed to develop a Processing Application Tool for HSPF (PATH) and Scenario Application Manager (SAM) project for 30 HUC 8 watersheds in Minnesota. SAM provides a graphical interface to the Hydrological Simulation Program FORTRAN (HSPF) model applications and expands the state’s investment in HSPF to a broader audience in support of the development of Total Maximum Daily Load (TMDL) studies and Watershed Restoration and Protection Strategy (WRAPS) reports.

Statewide
Recipient
RESPEC
2017 Fiscal Year Funding Amount
$211,886
Fund Source

The goal of this project is to develop forestry related best management practice (BMP) pollutant reduction/management efficiencies, costs, and management information applicable to Minnesota forests and incorporate these BMPs into the Hydrological Simulation Program FORTRAN (HSPF) model Scenario Application Manager (SAM) tool. By incorporating forestry BMPs into the existing SAM tool, forestry related management scenarios can be evaluated for potential impacts on surface waters and can inform the development of watershed restoration and protection strategies.

Statewide
Recipient
RESPEC
2017 Fiscal Year Funding Amount
$27,136
Fund Source

The goal of this work order is to collect and process the watershed specific files needed to create the Scenario Application Manager (SAM) project files to apply the SAM software in selected major watersheds in Minnesota where an Hydrological Simulation Program – FORTRAN (HSPF) model has been developed. This work order will also involve technical support for the SAM users who are applying the SAM projects.

Statewide