The Washington Conservation District (WCD), Washington County, and South Washington Watershed District (SWWD) are partnering to retrofit water quality improvement practices at the Oakdale Library. The goal is clean water and the project will work toward the 101 pound phosphorus load reduction target for Armstrong Lake identified in the SWWD Watershed Plan. The project will also benefit Wilmes Lake, which is downstream from Armstrong and is impaired by excess nutrients.
This project will provide condition monitoring and problem investigation monitoring at the following sites.
Mississippi River: Tributaries include Bassett Creek, Cannon River, Crow River, and Minnehaha Creek.
Minnesota River: Tributaries include Eagle Creek,Riley Creek, and Valley Creek tributary to the St. Croix River
Naturally occurring arsenic can make groundwater unsafe for drinking. Before going to the expense of drilling a well and sampling the water for arsenic, it would benefit public health to be able to predict the level of arsenic in groundwater in a certain area. A special research project with the U.S. Geological Survey is designed to develop the capacity to assess local geological conditions, related groundwater chemistry and well construction factors in three counties in order to predict the levels of arsenic found in groundwater related to those variables.
The Ashley Creek and Adley Creek Inventory Project will involve desk top analysis and a field scale inventory of riparian areas to determine priority areas to install erosion control Best Management Practices and vegetative buffers for nutrient reduction. Assessments will also be made for potential E.coli bacteria sources. Inventory data will be shared with local partners to further develop an implementation plan to address nutrient loading and the listed impairments on each creek.
This project is a continuation of Statewide Lake study that revealed the obiquitous presence of endrocrine active compounds (EACs) in many MN Lakes. The initial project findings suggested two potential knowledge gaps in our understanding of EACs and their effects in lake environments. First, the sources of EACs and their entrance points into lakes need to be better defined than was possible in our previous statewide lake study.
Minnesota is currently revising its state-level Nutrient Reduction Strategy (NRS), which was originally completed in 2014. Since 2014, all watersheds in the state have completed Watershed Restoration and Protection Strategies (WRAPS). These technical strategies and reports have been used thus far by over two thirds of watersheds when developing comprehensive local water plans known as “One Watershed, One Plan” (1W1P).
This project will promulgate a nitrate water quality standard to address aquatic life toxicity, and gather information needed to support the development of total nitrogen (N) loading reduction strategies for Minnesota’s waters and also address Minnesota’s contribution to marine water hypoxia. Project will also develop a framework for a watershed nitrogen planning aid that can be used to optimize selection of Best Management Practice (BMP) systems for reducing nitrogen.
The Rice Creek Watershed District (RCWD) is proposing to improve the water quality of stormwater runoff to Bald Eagle Lake through installation of a new wet pond and iron-enhanced sand filter (IESF) on Ramsey County Ditch #11. In partnership with White Bear Township, this project will remove approximately 43 pounds of phosphorus from runoff annually and builds upon the extensive work undertaken by the RCWD to improve water quality in Bald Eagle Lake.
This project will support updates to the Draft Bald Eagle Lake TMDL. The updates will address comments received during the public comment period. The comments resulted in the development of individual Wasteload Allocations for stormwater sources in the Bald Eagle Lake watershed.
Bartlett Lake in Koochiching County is impaired for eutrophication and has already undergone a paleolimnological study. This project will utilize the data and results of paleolimnological study to develop in-lake management strategies that, if implemented, could significantly improve the water quality of Bartlett Lake.
The primary goal of this project is to analyze of dated sediment cores to reconstruct changes in the lake condition over the last 150 years. This will be done using multiple lines of evidence including biogeochemistry, sediment accumulation, and diatom and algal remains as biological indicators.
The Board of Water and Soil Resources is required to contract with the Conservation Corps of Minnesota and Iowa (formerly Minnesota Conservation Corps), or CCMI, for installation of conservation practices benefitting water quality for at least $500,000 in each year of the 2010-11 biennium.
The Plymouth Creek Restoration Project will improve water quality in Plymouth Creek and Medicine Lake, the creek's primary receiving water. The project will reduce total phosphorus and suspended sediment in Plymouth Creek and Medicine Lake stemming from streambank erosion. Streambank erosion is a common source of pollution, particularly in developed landscapes where flows in streams are considered flashy and can easily scour unprotected and disturbed streambanks.
This project engages private property owners including non-profits, businesses, and institutions, in the Harrison Neighborhood of Near North Minneapolis to install storm water best management practices. The BMPs will reduce pollution in Bassett Creek including chlorides and bacteria, for which the creek is impaired. The primary focus is on Glenwood Avenue, a focal point in the community and a highly impervious area.
The Becker County Drainage Ditch Inventory and Inspection Project is a collaborative, multifaceted approach to develop a GIS-based drainage ditch inventory database system, inventory the current conditions of judicial ditches and adjacent land, and target and prioritize portions of each ditch system for restorative or protective measures.
Installation of a 43,000 sf infiltration gallery in Becker Park in the City of Crystal to infiltrate 0.5 inches of runoff from a 147 acre currently untreated mixed use subwatershed with 51% impervious surface. The project will reduce total phosphorus to Impaired Water Upper Twin Lake by 118 pounds annually, and reduce street flooding on Bass Lake Road (Hennepin County Road 10).
With over 500 public water lakes in Becker County, we are blessed with abundant and diverse lake resources that, like those of much of lake country, are at risk of degradation due to increasing development pressures, redevelopment of non-conforming lots, rising stormwater runoff and land use changes within their watersheds.
Beltrami County will be updating their water plan in 2017. This plan will be watershed protection oriented and will utilize all available data and maps in order to best protect our water resources. In 2012, Beltrami County completed screening on 19 of our large lakes with heavy land use development. What we found was that none of the lakes had enough chemical data for a trend analysis.
The Beltrami SWCD proposes to partner with citizen and non-profit groups to complete projects that will reduce stormwater runoff and retain water on the land. The majority of the projects will be in the Lake Bemidji lakeshed which has recently been identified in the WRAPs project as being on the verge of impaired for nutrients. With the City of Bemidji being a regional hub for Northwestern Minnesota and the First City on the Mississippi, there are ample opportunities for citizen involvement and ample opportunities for stormwater improvements.
As a part of the Mississippi Headwaters Stormwater Retrofit Analysis, a feasibility study was conducted on the Bemidji State University property to determine possible subsurface water quality best management practices options. Staff from Beltrami SWCD, in cooperation with the City of Bemidji and Bemidji State University, are proposing to install a subsurface stormwater treatment system to reduce Total Suspended Solids (TSS) and Total Phosphorus (TP) loading to Lake Bemidji and subsequently the Mississippi River.
This grant to the City of Morris provides public improvements for the beneficial use of wastewater effluent, where beneficial use is defined as the use of stormwater or wastewater effluent from a publicly owned wastewater treatement plant to replace the use of groundwater.
Great River Energy (GRE) operates a power plant in the City of Elk River which generates electricity by incinerating municipal solid wastes. The plant is located proximate to the City of Elk River wastewater treatment plant (WWTP). This project will result in a corresponding reduction of groundwater use by GRE.
Recent efforts by Carver County Water Management Organization Staff have centered on removing point sources of bacteria in both Bevens and Carver Creeks. These efforts have shown improvement in water quality; however the creeks are still above the state standard for E. coli. Early results from field surveys have pinpointed areas where livestock have uncontrolled access to streams. Five sites over a twenty mile stretch of Bevens Creek have shown evidence of livestock access to streams and associated damage to streambanks.
This project will provide administrative support to the Clean Water Partnership (CWP) loan program. By initiating the CWP loan program in Sibley County it will provide low interest loans to bring 21 non-complaint or failing existing systems into compliance by replacing them with new single sewage treatment systems.
This project is for stressor identification data collection in targeted areas of the Big Fork River Watershed for the Watershed Restoration and Protection Strategy (WRAPS) Project. This effort will identify and prioritize targeted restoration and protection areas where there are data gaps within the Big Fork River Watershed to maintain and enhance water quality.
The purpose of this contract is to expand data collection efforts, public participation efforts, and provide technical assistance in targeted areas of the Big Fork River Watershed for the Watershed Restoration and Protection Strategy (WRAPS) Project. A key aspect of this effort is to develop implementation strategies for targeted areas of the watershed to help state agencies, local governments, and other watershed stakeholders determine how to best proceed with restoring and protecting the watershed.
The purpose of this contract is to expand data collection efforts, public participation efforts, and provide technical assistance in targeted areas of the Big Fork River Watershed for the Watershed Restoration and Protection Strategy (WRAPS) Project. A key aspect of this effort is to develop implementation strategies for targeted areas of the watershed to help state agencies, local governments, and other watershed stakeholders determine how to best proceed with restoring and protecting the watershed.
This project will complete a Total Maximum Daily Load Implementation Plan for the watersheds of Big Sandy and Minnewawa Lakes. This restoration plan will provide pollution reduction and watershed management strategies that are developed with input from stakeholders in the watersheds.