Big Carnelian Lake Stormwater Quality Improvements Phase I

Project Details by Fiscal Year
2022 Fiscal Year Funding Amount
$203,850
Fund Source
Clean Water Fund
Recipient
Carnelian-Marine-St. Croix WD
Recipient Type
Local/Regional Government
Status
In Progress
Start Date
January 2022
End Date
December 2024
Activity Type
Grants/Contracts
Counties Affected
Washington
Washington
Project Details

This project proposes to collect and treat 32 acres of stormwater flowing directly into Big Carnelian Lake with no water quality treatment. A 15,000 ft? bioinfiltration basin will treat 87% of the annual discharge and reduce 7.0 lbs. total phosphorus and 3 tons of sediment discharging into Big Carnelian Lake each year. Big Carnelian Lake is a high quality recreational lake with a public access and declining water quality trends. This is largest source of untreated urban stormwater discharging into the lake identified in the Big Carnelian Lake Subwatershed Analysis.

Competitive Grant Making Body
Board Members and Qualifications
Advisory Group Members and Qualifications
Conflict of Interest Disclosed
No
Conflict of Interest Contact

Annie Felix-Gerth

Legal Citation / Subdivision
Minnesota Session Laws - 2021, 1st Special Session, Chapter 1--H.F.No. 13, Article 2, Section 6(b)
Appropriation Language

(Projects and Practices)(b) $10,762,000 the first year and $11,504,000 the second year are for grants to local government units to protect and restore surface water and drinking water; to keep water on the land; to protect, enhance, and restore water quality in lakes, rivers, and streams; and to protect groundwater and drinking water, including feedlot water quality and subsurface sewage treatment system projects and stream bank, stream channel, shoreline restoration, and ravine stabilization projects. The projects must use practices demonstrated to be effective, be of long-lasting public benefit, include a match, and be consistent with total maximum daily load (TMDL) implementation plans, watershed restoration and protection strategies (WRAPS), or local water management plans or their equivalents. Up to 20 percent of this appropriation is available for land-treatment projects and practices that benefit drinking water.

2022 Fiscal Year Funding Amount
$203,850
Direct expenses
$0
Administration costs
$0
Number of full time equivalents funded
0.01
Proposed Measurable Outcome(s)

Install a 15,000 ft? infiltration basin and piping to collect and treat stormwater discharging to Big Carnelian Lake with no treatment. Decrease stormwater volumes by at least 2.8 ac.ft./yr., TP by 7.0 lbs./yr. and TSS by 3.0 tons by year.

Source of Additional Funds

LOCAL LEVERAGED FUNDS

Recipient Board Members
Members for Carnelian-Marine-St. Croix WD are: Andy Weaver, Jeff Roach, Kristin Tuenge, Mike White, Paul Richert, Wade Johnson
Project Manager
First Name
Mikael
Last Name
Isensee
Organization Name
Carnelian-Marine-St. Croix WD
Street Address
11660 Myeron Road North
City
Stillwater
State
MN
Zip Code
55082
Email
mike.isensee@cmscwd.org
Administered By
Administered by
Location

520 Lafayette Road North
St. Paul, MN 55155

Phone
651- 296-3767