All Projects

472 Results for
Recipient
Anoka CD
2014 Fiscal Year Funding Amount
$517,780
Fund Source

This Oak Glen Creek stormwater pond expansion and enhancement using an iron enhanced sand filter (IESF) is a partnership between the Anoka Conservation District (ACD) and a private company to protect a downstream corridor stabilization and improve the quality of stormwater discharged to the Mississippi River. Very little stormwater infrastructure currently exists in the 573 acre Oak Glen Creek subwatershed, and it discharges 147,519 pounds of sediment and 353 pounds of phosphorus to the Mississippi River annually.

Anoka
Recipient
Wood Environment & Infrastructure Solutions Inc
2019 Fiscal Year Funding Amount
$41,883
Fund Source

Wood Environment & Infrastructure Solutions, Inc. (Wood) was selected for this project to conduct work in support of the per- and polyfluoroalkyl substances (PFAS) program. This project is a multi-phased pilot study to further validate and refine potential locations across Minnesota that may have historically been, or are currently, contaminated with PFAS. The primary objective is to evaluate potential PFAS locations, specifically compost sites, to determine presence or absence of PFAS at each site.

Benton
Blue Earth
Dakota
Olmsted
Scott
St. Louis
Stearns
Recipient
Anoka CD
2021 Fiscal Year Funding Amount
$440,000
Fund Source
Anoka
Recipient
City of Elko New Market
2010 Fiscal Year Funding Amount
$5,000
Fund Source

Support aquifer test

Scott
Recipient
Coon Creek WD
2021 Fiscal Year Funding Amount
$330,000
Fund Source
Anoka
Recipient
Scott SWCD
2020 Fiscal Year Funding Amount
$283,900
Fund Source
Scott
Recipient
Prior Lake (Spring Lake Twp)
2014 Fiscal Year Funding Amount
$243,882
Fund Source

Construct collection system and connection to existing facility for unsewered area

Scott
Recipient
Prior Lake, City of
2015 Fiscal Year Funding Amount
$255,742
Fund Source

Construct collection system for unsewered area and connect to Prior Lake municipal sewer system

Scott
Recipient
Scott SWCD
2015 Fiscal Year Funding Amount
$136,130
Fund Source

This project is a cooperative initiative between the Prior Lake Spring Lake Watershed District, the City of Prior Lake, and the Scott Soil and Water Conservation District to implement on-the-ground Best Management Practices (BMPs) that will protect and improve water quality in Spring, Upper Prior and Lower Prior Lakes, water resources of local, regional, and state significance. Spring and Upper Prior Lakes are both impaired and have a completed Total Maximum Daily Load and Implementation Plan.

Scott
Recipient
Prior Lake-Spring Lake Watershed District
2015 Fiscal Year Funding Amount
$128,522
Fund Source

Regional public projects that are the focus of the proposed project include: Infiltration areas and a sedimentation pond enhancement in subwatersheds N3/N4; Parking lot storm drain rain gardens and a sedimentation pond enlargement in subwatersheds N5/N6; An infiltration area and a sedimentation pond enhancement in subwatersheds S9/S11; Ditch checks along Highway 13 in subwatershed 10.

Scott
Recipient
Anoka CD
2020 Fiscal Year Funding Amount
$240,000
Fund Source
Anoka
Recipient
Anoka CD
2017 Fiscal Year Funding Amount
$467,968
Fund Source

Golden Lake does not meet state water quality standards due to high phosphorus levels. The proposed iron enhanced sand filter basin was identified in the Golden Lake Subwatershed Stormwater Retrofit Analysis to be one of the most cost effective remaining practices for reducing external phosphorus loads to Golden Lake. This project, paired with two previously installed upstream Best Management Practices, will achieve on average, 84% of the phosphorus reduction goal for the watershed.

Anoka
Recipient
Scott County
2014 Fiscal Year Funding Amount
$800,000
Fund Source

This project will reduce sediment to the Minnesota River, control erosion and reduce sedimentation in a local DNR Protected Water and protect private land and public infrastructure. The County Road (CR) 6 ravine (Quarry Creek) cuts through the Minnesota River valley bluff in Blakeley Township. Active channel incision and erosion within the ravine has caused large amounts of sediment to be deposited under the bridge at CR 6 such that the road is frequently flooded and sediment has to be removed several times a year.

Scott
Recipient
Koochiching County SWCD
2019 Fiscal Year Funding Amount
$94,650
Fund Source

The purpose of this contract is to establish an international watershed coordinator for the Rainy River- Lake of the Woods (RR-LOW) watershed. The coordinator will assist the Minnesota Pollution Control Agency (MPCA) in facilitating and enhancing civic engagement and public participation activities through collaboration and integration of the efforts of groups working on watershed activities at local, state/provincial, tribal, and bi-national levels.

Koochiching
Recipient
Koochiching Soil & Water Conservation District
2016 Fiscal Year Funding Amount
$75,000
2018 Fiscal Year Funding Amount
$51,212
2019 Fiscal Year Funding Amount
$35,756
2021 Fiscal Year Funding Amount
$52,850
2022 Fiscal Year Funding Amount
$68,980
Fund Source

The goal of this project is to conduct water chemistry monitoring at four subwatershed sites and two basin sites in 2016 and 2017; and six subwatershed sites and three basin sites in 2018-2019 based on flow conditions, targeting runoff events using protocols defined in the Watershed Pollutant Load Monitoring Network (WPLMN) Standard Operating Procedures and Guidance. The data collected will be submitted to the Minnesota Pollution Control Agency (MPCA) and used in the FLUX32 model for calculating pollutant loads.

Koochiching
St. Louis
Recipient
Koochiching County SWCD
2019 Fiscal Year Funding Amount
$323,695
Fund Source

There are seven major watersheds Koochiching County, this project will work in five of them: Big Fork, Little Fork, Rapid River, Lower Rainy River, and Rainy River Headwaters watersheds. The local Koochiching County Soil and Water Conservation District (SWCD) is positioned to assist in several elements of the Watershed Restoration and Protection Strategy (WRAPS) process. This includes gap monitoring for water chemistry, sediment work, TMDL (Total Maximum Daily Load) development, modeling scenarios, and WRAPS development.

Itasca
Koochiching
St. Louis
Recipient
University of Minnesota Center for Changing Landscapes
2018 Fiscal Year Funding Amount
$15,490
Fund Source

The University of Minnesota will develop effective interview questions for community watershed assessments in the Rainy River basin and provide assistance in understanding the data collected through community interviews.

Itasca
Koochiching
Lake of the Woods
Recipient
Koochiching County Soil and Water Conservation District (KSWCD)
2013 Fiscal Year Funding Amount
$104,975
Fund Source

The purpose of this project is to establish an International Watershed Coordinator for the Lake of the Woods and Rainy River (LOW/RR) watershed, to assist the MPCA in facilitating and enhancing civic engagement through collaboration and integration of the efforts of groups working on watershed activities at local, state/provincial and bi-national levels of organization.

Koochiching
Recipient
Koochiching County SWCD
2017 Fiscal Year Funding Amount
$99,930
Fund Source

This project will provide an important framework for civic and citizen engagement and communication in the International Rainy River-Lake of the Woods Watershed, which will contribute to long-term public participation in surface water protection and restoration activities.

Cook
Itasca
Koochiching
Lake
Lake of the Woods
St. Louis
Recipient
Lake of the Woods SWCD
2017 Fiscal Year Funding Amount
$143,880
2019 Fiscal Year Funding Amount
$43,283
Fund Source

The Rapid River Watershed Restoration and Protection Strategy (WRAPS) project will result in the development of the restoration and protection strategies for the watershed and engage the local stakeholders in the practices of watershed management. This project will also develop Total Maximum Daily Loads (TMDLs) for impaired waters.

Koochiching
Lake of the Woods
Recipient
Emmons and Olivier Resources, Inc.
2021 Fiscal Year Funding Amount
$70,150
Fund Source

This work order will fund the development and delivery of an approved final Total Maximum Daily Load Program (TMDL) study and Watershed Restoration and Protection Strategy (WRAPS) report for the Rapid River Watershed.

Koochiching
Lake of the Woods
Recipient
Redwood-Cottonwood Rivers Control Area (RCRCA)
2016 Fiscal Year Funding Amount
$142,257
2018 Fiscal Year Funding Amount
$40,405
2019 Fiscal Year Funding Amount
$28,078
2021 Fiscal Year Funding Amount
$51,246
2022 Fiscal Year Funding Amount
$73,370
Fund Source

The overall goal of this project is to perform water quality monitoring and load calculation duties to accomplish Minnesota Pollution Control Agency (MPCA) Watershed Pollutant Load Monitoring Network (WPLMN) monitoring efforts at the seven sites within the Redwood and Cottonwood River watersheds as well as the Minnesota River site near Morton. To accomplish this goal the requested funds will provide for technician’s time, mileage, lab costs, supplies, as well as equipment calibration and upkeep.

Brown
Lyon
Redwood
Recipient
Red River Watershed Management Board
2012 Fiscal Year Funding Amount
$194,490
Fund Source

This project will provide land and water managers in the Red River Basin with data and online tools to prioritize actions on the landscape that achieve water quality objectives identified in local and state plans. This will help identify strategically important locations for implementing erosion control and water management practices. Standardized watershed-based data products will be integrated into a web-based planning tool which will be added to the Red River Basin Decision Information Network (RRBDIN) being developed as part of the Red River Watershed Feasibility Study.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Itasca
Kittson
Koochiching
Lake of the Woods
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
RESPEC
2016 Fiscal Year Funding Amount
$99,991
Fund Source

The goal of this project is to construct, calibrate, and validate a watershed model using the Hydrological Simulation Program FORTRAN (HSPF) model for the Upper/Lower Red Lake Watershed. The contractor will produce an HSPF model that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDL) Studies. The model will generate predicted output for hydrology, sediment, nutrients, and dissolved oxygen that is consistent with observed data.

Beltrami
Clearwater
Itasca
Koochiching
Recipient
Red River Watershed Management Board
2010 Fiscal Year Funding Amount
$346,000
Fund Source

This project will develop an effective transferable model to engage and educate watershed residents, stakeholders and others to better understand and protect watershed ecostystems through environmental monitoring, training, and formal and informal education programs in their local watershed. The project will build on the foundation of the existing Red River Basin River Watch program by strengthening three main activity areas: 1) curriculum integration and teacher training, 2) youth leadership and civic engagement, and 3) applied research collaboration and watershed science skills building.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Itasca
Kittson
Koochiching
Lake of the Woods
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Redwood-Cottonwood Rivers Control Area
2018 Fiscal Year Funding Amount
$100,000
Fund Source

The Redwood River watershed is one of the last remaining watersheds to complete Cycle I of the Watershed Restoration & Protections Strategies (WRAPS) process. The scope of this project upon completion is have two reports developed; a Watershed Restoration and Protection Strategies report and a Total Maximum Daily Load (TMDL) for the entire watershed.

Brown
Cottonwood
Lyon
Murray
Pipestone
Redwood
Recipient
Redwood-Cottonwood Rivers Control Area
2017 Fiscal Year Funding Amount
$76,111
Fund Source

In 2017 and 2018, Redwood-Cottonwood Rivers Control Area (RCRCA) will collect water chemistry samples from the 10 lakes and 24 stream sites identified in the Redwood and Cottonwood River watersheds. Six samples will be collected at 10 lakes from May through September in 2017; five samples will be collected at 5 lakes in 2018 from May through September. Eleven samples will be collected at each of the 24 stream sites following the Basic Regime in 2017. Sixteen samples at each stream site will be collected in 2017 and 2018 following the E.coli monitoring regime.

Brown
Cottonwood
Lincoln
Lyon
Murray
Pipestone
Redwood
Yellow Medicine
Recipient
Redwood-Cottonwood Rivers Control Area (RCRCA)
2013 Fiscal Year Funding Amount
$52,600
Fund Source

The Redwood and Cottonwood River Watersheds have been assessed and many reaches have been impaired for turbidity, bacteria, and low dissolved oxygen. This project will accelerate conservation efforts to reduce overland runoff sediment, bacteria, and nutrient loadings contributing to water quality impairments in targeted subwatersheds.

Brown
Cottonwood
Lincoln
Lyon
Murray
Pipestone
Redwood
Yellow Medicine
Recipient
Redwood-Cottonwood Rivers Control Area (RCRCA)
2013 Fiscal Year Funding Amount
$560,000
Fund Source

The Redwood River and Cottonwood River watersheds encompass approximately 2,020 square miles of southwestern Minnesota in the Minnesota River Basin. Land use in these watersheds is mostly agricultural and area geology makes them prone to erosion. Surface water issues within the two watersheds are a concern of local leaders. The counties and Soil and Water Conservation District leaders formed the Redwood Cottonwood Rivers Control Area (RCRCA) Joint Powers Board in 1983 to address sedimentation, water quality and quantity, and erosion issues.

Brown
Cottonwood
Lincoln
Lyon
Murray
Pipestone
Redwood
Yellow Medicine
Recipient
Rice Creek WD
2014 Fiscal Year Funding Amount
$25,000
Fund Source

The Rice Creek Watershed District (RCWD) will create a web-based, mobile-compatible public drainage system inspection and maintenance database. This database system will enable District staff to create and track maintenance requests and inspections from the field, including Geo-referencing locations requiring repair via a mobile device. The system will greatly reduce the time required to identify and log each maintenance request, enabling staff to inventory more miles of public drainage system yearly thereby identifying erosion problems more efficiently and thoroughly.

Anoka
Hennepin
Ramsey
Washington
Recipient
Barr Engineering
2012 Fiscal Year Funding Amount
$3,000
Fund Source

This project will complete the final Implementation Plan, semi-annual and final reports and hold project meetings. The Implementation Plan will identify target areas and priorities for implementation strategies to improve water quality for Bluff Creek. This project will build the groundwork so Bluff Creek will meet water quality standards for aquatic life in the future.

Carver
Dakota
Hennepin
Le Sueur
McLeod
Nicollet
Ramsey
Renville
Rice
Scott
Sibley
Recipient
Minnesota Board of Water and Soil Resources
2011 Fiscal Year Funding Amount
$6,940,000
Fund Source

This program is a part of a comprehensive clean water strategy to prevent sediment and nutrients from entering our lakes, rivers, and streams; enhance fish and wildlife habitat; protect groundwater and wetlands. Specifically the Riparian Buffer Easement Program targets creating buffers on riparian lands adjacent to public waters, except wetlands. Through the Reinvest in Minnesota Program (RIM) and in partnership with Soil and Water Conservation Districts and private landowners, permanent conservation easements are purchased and buffers established.

Blue Earth
Brown
Carver
Chisago
Cottonwood
Faribault
Jackson
Kandiyohi
Martin
McLeod
Meeker
Murray
Nobles
Olmsted
Otter Tail
Pope
Redwood
Renville
Rice
Scott
Steele
Stevens
Wilkin
Recipient
Mille Lacs Soil & Water Conservation District
2013 Fiscal Year Funding Amount
$111,111
Fund Source

The purpose of the project is to collect data to represent the ambient condition of the lakes and streams of the Rum River Watershed within Mille Lacs, Isanti and Sherburne Counties that is needed to determine if thresholds set to protect designeated uses, such as aquatic recreation and aquatic life, are being met .

Aitkin
Anoka
Benton
Chisago
Crow Wing
Isanti
Kanabec
Mille Lacs
Morrison
Sherburne
Recipient
Anoka Conservation District
2013 Fiscal Year Funding Amount
$280,000
Fund Source

This project will gather watershed data necessary for the development of a Watershed Restoration and Protection Strategy with parameter-specific targets that will maintain or improve water quality in the Rum River Watershed. Local Partners will lead various portions of this project and a hired onsultant will be subcontracted to write selected TMDL protection plans.

Aitkin
Anoka
Benton
Chisago
Crow Wing
Isanti
Kanabec
Mille Lacs
Morrison
Sherburne
Recipient
Anoka, City of
2022 Fiscal Year Funding Amount
$1,008,820
Fund Source
Anoka
Recipient
Anoka Conservation District
2016 Fiscal Year Funding Amount
$75,000
Fund Source

This project will focus on Watershed Restoration and Protetion Strategy (WRAPS) and Total Maximum Daily Load (TMDL) report development for the Rum River Watershed, which includes Mille Lacs Lake (the second largest lake in Minnesota) and the Rum River of which Mille Lacs Lake is the headwaters. The project will produce a plan that partners and citizens will be able to implement, a framework for citizen engagement, and a set of watershed management activities that will achieve water quality standards for all impairments within the watershed.

Aitkin
Anoka
Benton
Chisago
Crow Wing
Isanti
Kanabec
Mille Lacs
Morrison
Sherburne
Recipient
Saint Francis, City of
2017 Fiscal Year Funding Amount
$7,000,000
Fund Source

Construct wastewater treatment improvements to meet TMDL wasteload requirement

Anoka
Recipient
Scott SWCD
2020 Fiscal Year Funding Amount
$229,000
Fund Source
Scott
Recipient
Scott County WMO
2023 Fiscal Year Funding Amount
$337,397
Fund Source
Scott
Recipient
Scott Watershed Management Organization
2011 Fiscal Year Funding Amount
$80,000
Fund Source

This goal of this project is improving water quality and expanding critical wildlife habitat by permanently restoring and enhancing wetlands in the Sand Creek and Prior/Spring Lake Watersheds. By making sign-up payments available through this grant, this project will restore or enhance 400 to 500 acres of wetlands moderating flows and improving water quality. The NRCS has committed $2.5 million through the Wetland Reserve Enhancement Program (WREP), the Scott WMO $314,000, the PLSLWD $145,000, Rice SWCD $40,000, Le Sueur SWCD $40,000, and the Scott SWCD $75,000.

Scott