All Projects

832 Results for
Recipient
Lincoln SWCD
2011 Fiscal Year Funding Amount
$184,210
Fund Source

Project partners play a vital role in the implementation of the Verdi Wellhead Protection Plan and have made this water source a priority in lowering nitrate levels. The aquifer used by the wells in the Verdi Well Field consists of a sand and gravel horizon about 30' thick which overlies clay-rich till. The geological sensitivity in all five of the Verdi wells is classified as "high".The Verdi Well Field supplies water to ten community water suppliers, 34 large rural users, and 1,126 rural hookups. Total population served by this water supply is about 7,500.

Lincoln
Recipient
Vermillion River Watershed Joint Powers Organization
2014 Fiscal Year Funding Amount
$78,779
Fund Source

The VRWJPO is pursuing a Watershed Restoration and Protection Strategy (WRAPS) project in cooperation with the MPCA in order to better identify the sources of stress and impairment to the river, tributaries, and lakes and evaluate the feasibility of reaching water quality goals, and properly allocating pollution reduction goals to those areas identified as likely pollution sources. Successful restoration and protection outcomes are dependent on successful community building and ownership of both the problems and solutions identified in the WRAPS.

Dakota
Scott
Recipient
Wenck Associates, Inc.
2014 Fiscal Year Funding Amount
$147,761
Fund Source

The goal is to develop the Watershed Restoration and Protection Strategy (WRAPS) and a public and stakeholder participation process that encourages local involvement in water quality discussions and solutions, identifying impaired waters, developing Total Maximum Daily Loads (TMDLs); and planning, setting priorities, and implementing the WRAPS recommendation to restore impaired waters. Phase II of the WRAPS will consists of developing TMDLs for the impaired reaches as well as developing the final WRAPS document and implementation planning.

Dakota
Scott
Recipient
Dakota SWCD
2017 Fiscal Year Funding Amount
$40,000
Fund Source

The purpose of this project is to complete subwatershed analysis for Cannon River and Vermillion River sub-watersheds to prioritize and target Best Management Practices based on cost-effectiveness with regard to pollutant reduction. This process is intended to proactively assist local water management and partner agencies in maximizing the value of each dollar spent to improve water quality in the respective rivers.

Dakota
Recipient
Ramsey Conservation District
2014 Fiscal Year Funding Amount
$56,000
Fund Source

Ramsey County is the smallest, most densely populated county in the state of Minnesota consisting of primarily urbanized land use. Ramsey County's water resources provide the industrial base, drinking water, and recreational opportunities for over one-half million people on a daily basis. The major environmental problems that Ramsey County lakes and streams face can be traced to the effects that urbanized land use has on these natural resources.

Ramsey
Recipient
Waseca, City of
2010 Fiscal Year Funding Amount
$505,050
Fund Source

Construct wastewater treatment improvements to meet TMDL wasteload requirement

Waseca
Recipient
Tetra Tech
2022 Fiscal Year Funding Amount
$319,212
Fund Source

Tetra Tech will work to support the science needed when planning in Minnesota for water storage practice implementation. The goal is to provide practical water storage recommendations that can be incorporated into smaller scale planning within major watersheds (HUC 8), as well as larger scale planning for the Sediment Reduction Strategy for the Minnesota River and South Metro Mississippi River.

Big Stone
Blue Earth
Brown
Carver
Chippewa
Cottonwood
Dakota
Douglas
Faribault
Freeborn
Grant
Hennepin
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
Martin
McLeod
Murray
Nicollet
Otter Tail
Pipestone
Pope
Redwood
Renville
Rice
Scott
Sibley
Stevens
Swift
Traverse
Waseca
Watonwan
Yellow Medicine
Recipient
Metropolitan Council/CDM Smith
2014 Fiscal Year Funding Amount
$54,694
2015 Fiscal Year Funding Amount
$42,006
Fund Source

The Metropolitan Council, in conjunction with CDM Smith and HKGi consultants, reorganized and expanded the water conservation tools on the water supply planning pages of the Metropolitan Council’s website. The revised toolbox was organized into an online, web-based guide format. These tools are supplemented with fact sheets and case studies that serve to educate and provide useful information to support water conservation programs and activities.

Aitkin
Anoka
Becker
Beltrami
Benton
Big Stone
Blue Earth
Brown
Carlton
Carver
Cass
Chippewa
Chisago
Clay
Clearwater
Cook
Cottonwood
Crow Wing
Dakota
Dodge
Douglas
Faribault
Fillmore
Freeborn
Goodhue
Grant
Hennepin
Houston
Hubbard
Isanti
Itasca
Jackson
Kanabec
Kandiyohi
Kittson
Koochiching
Lac qui Parle
Lake
Lake of the Woods
Le Sueur
Lincoln
Lyon
Mahnomen
Marshall
Martin
McLeod
Meeker
Mille Lacs
Morrison
Mower
Murray
Nicollet
Nobles
Norman
Olmsted
Otter Tail
Pennington
Pine
Pipestone
Polk
Pope
Ramsey
Red Lake
Redwood
Renville
Rice
Rock
Roseau
Scott
Sherburne
Sibley
St. Louis
Statewide
Stearns
Steele
Stevens
Swift
Todd
Traverse
Wabasha
Wadena
Waseca
Washington
Watonwan
Wilkin
Winona
Wright
Yellow Medicine
Recipient
Metropolitan Council
2022 Fiscal Year Funding Amount
$919,000
2021 Fiscal Year Funding Amount
$1,000,000
2020 Fiscal Year Funding Amount
$1,000,000
2019 Fiscal Year Funding Amount
$950,000
2018 Fiscal Year Funding Amount
$950,000
2017 Fiscal Year Funding Amount
$975,000
2016 Fiscal Year Funding Amount
$975,000
2015 Fiscal Year Funding Amount
$550,000
2014 Fiscal Year Funding Amount
$1,537,000
2013 Fiscal Year Funding Amount
$500,000
2012 Fiscal Year Funding Amount
$500,000
2011 Fiscal Year Funding Amount
$400,000
2010 Fiscal Year Funding Amount
$400,000
Fund Source

This program supports communities as they plan and implement projects that address emerging drinking water supply threats. It supports the exploration cost-effective regional and sub-regional solutions, leverages inter-jurisdictional coordination, and prevents overuse and degradation of groundwater resources.

Anoka
Carver
Dakota
Hennepin
Ramsey
Scott
Washington
Recipient
Metropolitan Council
2023 Fiscal Year Funding Amount
$625,000
2022 Fiscal Year Funding Amount
$625,000
2021 Fiscal Year Funding Amount
$375,000
2020 Fiscal Year Funding Amount
$375,000
2017 Fiscal Year Funding Amount
$250,000
2016 Fiscal Year Funding Amount
$250,000
Fund Source

The Metropolitan Council was awarded $1,250,000 from Minnesota Clean Water, Land and Legacy Amendment funds for a Water Efficiency Grant Program during the Minnesota Legislature's 2021 First Special Session. The Metropolitan Council (Council) implemented a water efficiency grant program effective July 1, 2022 to June 30, 2024. Grants were awarded on a competitive basis to municipalities that are served by a municipal water system. The Council provides 80% of the program cost; the municipality must provide the remaining 20%.

Anoka
Carver
Dakota
Hennepin
Ramsey
Scott
Washington
Recipient
Metropolitan Council/CDM Smith
2015 Fiscal Year Funding Amount
$50,005
2016 Fiscal Year Funding Amount
$4,990
Fund Source

The Metropolitan Council, in conjunction with CDM Smith consultants, undertook a project to collect and disseminate data regarding water costs and conservation programs in the seven-county metropolitan area, including:

• Evaluating all water rate structures of the communities in the seven-county metro area. The information on rates by community is correlated with community per capita values, peaking ratios, and other water use characteristics.

• Evaluating all water conservation programs in the communities in the seven-county metro area.

Anoka
Carver
Dakota
Hennepin
Ramsey
Scott
Washington
Recipient
Wabasha SWCD
2019 Fiscal Year Funding Amount
$55,000
Fund Source

This project will educate and assist landowners to seal unused wells by providing cost-share funds of 50% up to $1,000 per well located in highly vulnerable groundwater areas in 10 southeast Minnesota counties. Groundwater is the primary source of drinking water and due to the karst geology in SE MN groundwater is more vulnerable to contamination.

Dodge
Fillmore
Goodhue
Houston
Mower
Olmsted
Rice
Steele
Wabasha
Winona
Recipient
Yellow Medicine County
2017 Fiscal Year Funding Amount
$20,000
Fund Source

The Yellow Medicine One Watershed One Plan has identified Protecting and Preserving Groundwater Quality and Quantity as one of the three priorities addressed in the Plan. Seven priority sub-watersheds have been identified as priority areas, as well as two townships that have been identified by the Department of Agriculture to have vulnerable groundwater areas. Our goal is to provide 50% cost share to seal 34 abandoned wells that are located in these priority areas.

Lac qui Parle
Lincoln
Lyon
Yellow Medicine
Recipient
Pioneer-Sarah Creek WMC
2023 Fiscal Year Funding Amount
$405,000
Fund Source

Whaletail Lake (MDNR 27-018400) is located within the jurisdictional boundaries of Pioneer-Sarah Creek Watershed Management Commission (PSCWMC). The lake is considered having two distinct basins relative to the Minnesota water quality nutrient standards with the South basin (MDNR 27-018402) classified as a deep lake (156 acres; max depth 23 feet; & 66% littoral) and the North basin (MDNR 27-0180401) classified as a shallow lake (370 acres; max depth 10 feet; & 100% littoral).

Hennepin
2017 Fiscal Year Funding Amount
$150,000
Fund Source

The DNR is directed by Minnesota Law 2016, Chapter 172, Article 2, Section 12 to request proposals for a potential design-build project to augment White Bear Lake with water from East Vadnais Lake.

Ramsey
Washington
Recipient
Whitewater River Watershed Project
2023 Fiscal Year Funding Amount
$30,000
Fund Source

Within Whitewater River Watershed, groundwater is the primary drinking water source for both private and community wells. These drinking water aquifers often lack adequate protective layers making them vulnerable to contamination. Unused wells can deteriorate and pose a serious risk to groundwater quality by providing a pathway for contaminants from the surface to easily travel into groundwater. This project will use cost-share funds to incentivize sealing twelve abandoned wells that are contamination risks to vulnerable aquifers.

Olmsted
Wabasha
Winona
Recipient
Whitewater River Watershed Project
2020 Fiscal Year Funding Amount
$191,550
Fund Source
Olmsted
Wabasha
Winona
Recipient
Wabasha SWCD
2022 Fiscal Year Funding Amount
$26,000
Fund Source

The WinLaC Prioritization and Public Participation Project will identify priority water quality issues and concerns for the watershed approach in the Mississippi River - Winona and La Crescent watersheds. Information obtained from this project will help develop the Watershed Restoration and Protection Strategy (WRAPS) Update report as well the WinLaC Comprehensive Watershed Management Plan.

Houston
Wabasha
Winona
Recipient
Root River SWCD
2023 Fiscal Year Funding Amount
$577,696
Fund Source
Houston
Olmsted
Wabasha
Winona
Recipient
EOR
2020 Fiscal Year Funding Amount
$4,860
Fund Source

This project will produce a final Total Maximum Daily Load (TMDL) report and Watershed Restoration and Projection Strategy (WRAPS) reports for the Winnebago and Mississippi River – La Crescent watersheds including the drafting of public notice versions of the reports, responding to comments during the public notice period and producing the final TMDL and WRAPS reports.

Faribault
Freeborn
Houston
Winona
Recipient
Winona County
2011 Fiscal Year Funding Amount
$30,000
Fund Source

The Winona County Well Sealing Costshare Program will utilize Clean Water Funds to speed water well sealing in a continuing effort to protect the groundwater aquifers used for drinking water in Southeast Minnesota. Since 1990, 1303 unused water supply wells have been sealed in Winona County with costs ranging from $500-$10,000+ per well.

Winona
Recipient
Bassett Creek Watershed Management Commission
2011 Fiscal Year Funding Amount
$75,000
Fund Source

Wirth Lake is located in Theodore Wirth Regional Park in the City of Golden Valley. The lake was listed as Impaired due to excessive phosphorus levels. In recent years water quality goals were met except during instances where seasonal overflows from Bassett Creek into Wirth Lake occurred.With one relatively simple project, the Bassett Creek Watershed Management Commission anticipates that the excess phosphorus problem will be resolved once and for all.

Hennepin
Recipient
RESPEC
2023 Fiscal Year Funding Amount
$24,996
Fund Source

The United States Environmental Protection Agency (USEPA) requires the Minnesota Pollution Control Agency (MPCA) to carry out the Total Maximum Daily Load Program (TMDL) in the state of Minnesota. Minnesota has an abundance of lakes and river reaches, many of which will require a TMDL study. In an effort to expedite the completion of TMDL projects, the MPCA has decided to construct watershed models. These models have the potential to support the simultaneous development of TMDL studies for multiple listings within a cataloging unit or 8-digit Hydrologic Unit Code watershed.

Chippewa
Douglas
Grant
Kandiyohi
Lac qui Parle
Lincoln
Lyon
Otter Tail
Pope
Redwood
Renville
Stevens
Swift
Yellow Medicine
Recipient
Yellow Medicine River Watershed District
2020 Fiscal Year Funding Amount
$75,604
Fund Source

This project will monitor four lakes and 18 stream sites within the Yellow Medicine River Watershed to collect surface water ‏quality data to determine the health of the watershed's streams and lakes and if they are in need of restoration or protection ‏strategies. The sites will be monitored according to the Minnesota Pollution Control Agency's (MPCA) Water Monitoring Standard Operating Procedures.

Lincoln
Lyon
Redwood
Yellow Medicine
Recipient
Yellow Medicine River WD
2014 Fiscal Year Funding Amount
$88,611
Fund Source

The Yellow Medicine River Watershed District will contract with the Water Resource Center at the Minnesota State University - Mankato to complete a Geographic Information System (GIS) terrain analysis for the watershed using recently completed LIDAR data in southern Minnesota. Analysis will concentrate on the impaired reaches of the Yellow Medicine River Watershed and its tributaries. This inventory will utilize the State of Minnesota LiDAR elevation datasets to create many datasets through the analysis of this elevation data.

Lincoln
Lyon
Yellow Medicine
Recipient
Lincoln SWCD
2010 Fiscal Year Funding Amount
$90,125
Fund Source

Over the years, the landscape of the Yellow Medicine Watershed has changed through drainage and loss of wetland areas. The Soil and Water Conservation Districts of Lincoln, Lyon and Yellow Medicine counties work cooperatively with the Yellow Medicine River Watershed District to oversee implementation of conservation practices in this watershed. Based on previous Clean Water Partnership diagnostic studies, it is known the river is receiving an excessive loading of nutrients, phosphorus and suspended solids. These conditions have led to declining dissolved oxygen levels as a result.

Lincoln
Recipient
Washington Conservation District
2011 Fiscal Year Funding Amount
$5,618
Fund Source

This project will collect water quality data at Zavoral Creek over a two year period.

Anoka
Chisago
Isanti
Pine
Ramsey
Washington
Recipient
LimnoTech
2019 Fiscal Year Funding Amount
$59,532
Fund Source

In previous phases of work, a Hydrologic Simulation Program FORTRAN (HSPF) model of the Zumbro River Watershed was developed to simulate hydrology and water quality for the 1995-2009 simulation period (Phase I), applied to evaluate various management scenarios for reducing sediment and nutrient loading (Phase II), and used to develop Total Maximum Daily Loads (TMDLs) for impaired stream segments and inform development of a nutrient TMDL for Rice Lake (Phase III).

Dodge
Goodhue
Olmsted
Rice
Steele
Wabasha
Recipient
Olmsted Soil and Water Conservation District
2023 Fiscal Year Funding Amount
$89,448
Fund Source

Olmsted Soil and Water Conservation District (SWCD) will work in coordination with Goodhue SWCD, Wabasha SWCD, and Dodge County Environmental Services to collect water quality and chemistry parameters on 23 MPCA approved sites within the Zumbro River watershed during the 2023-24 sampling season.

Dodge
Goodhue
Olmsted
Wabasha
Recipient
Zumbro Watershed Partnership Inc
2018 Fiscal Year Funding Amount
$10,600
Fund Source

This project will build upon the outreach and education efforts of the Zumbro Watershed Restoration and Protection Strategy (WRAPS). The targeted area will be residents of the Zumbro River Watershed, specifically individuals and organizations that are not professionally involved in managing natural resources. This project will provide necessary outreach and education during the interim between the Zumbro WRAPS and beginning the One Watershed, One Plan process.

Dodge
Goodhue
Olmsted
Rice
Steele
Wabasha
Recipient
LimnoTech
2017 Fiscal Year Funding Amount
$62,622
Fund Source

The goal of this project is to test the sensitivity of the Zumbro River Watershed Hydrological Simulation Program FORTRAN (HSPF) model management scenario results. Additional goals are to develop Total Maximum Daily Loads (TMDLs) for impaired stream reaches and Rice Lake, which will be documented in a TMDL Report. The consultant will apply the existing calibrated and validated Zumbro River Watershed HSPF model to construct load duration curves to develop TMDLs.

Dodge
Goodhue
Olmsted
Rice
Steele
Wabasha
Recipient
LimnoTech
2014 Fiscal Year Funding Amount
$75,027
Fund Source

The Zumbro River watershed HSPF model will be refined to include recent data and information as well as evaluate various management scenarios to inform the most effective actions for reducing sediment and nutrient loading and improving water quality. Specifically, to provide the foundation for the Lake Zumbro Phosphorus Total Maximum Daily Load (TMDL).

Winona