State law (M.L. 2011, First Special Session, Ch. 6) directs restoration evaluations to be conducted on habitat restoration projects completed with funds from the Parks and Trails Fund (M.S. 85.53). The Minnesota Department of Natural Resources (DNR) is responsible for convening a Restoration Evaluation Panel containing at least five technical experts who will evaluate a sample of up to 10 habitat restoration projects annually. The Panel will evaluate the restorations relative to the law, current science, stated goals and standards in the restoration plans, and applicable guidelines.
State law (M.L. 2011, First Special Session, Ch. 6) directs restoration evaluations to be conducted on habitat restoration projects completed with funds from the Clean Water Fund (M.S. 114.D.50 Subd. 6). The Board of Water and Soil Resources (BWSR) is responsible for convening a Restoration Evaluation Panel containing at least five technical experts who will evaluate a sample of up to 10 habitat restoration projects annually. The Panel will evaluate the restorations relative to the law, current science, stated goals and standards in the restoration plans, and applicable guidelines.
Restore native freshwater mussel assemblages in the Mississippi, Cedar, and Canon rivers to provide necessary ecosystem services, expand imperiled species populations, and inform the public on mussels and their conservation.
Citizens will be enlisted to field-test a new method of managing carp to restore an impaired lake. Water quality & cost-effectiveness will be quantified to inform statewide implementation.
We propose identifying hot spots of groundwater chloride pollution of surface waters due to excessive road salt use, which is a long term source increasing chloride impairment of surface waters.
The project replaced asphalt shingles from the late 1960s with wooden shingles to complete a restoration project started in 2007, the repair the roof of the District No. 44 School, listed in the National Register of Historic Places. It involved removing two layers of shingles and inspecting the underlying sheathing, making historically accurate repairs where necessary, and re-shingling the school with wooden shingles.
Sandhill cranes have expanded their range in Minnesota and elsewhere and as populations have expanded several states, including Minnesota, have initiated sandhill crane hunting seasons and other states are considering doing the same. Partially this is in response to increasing complaints of crop degradation by sandhill cranes.
This project will extend and update the lake water clarity database of Landsat-estimated lake clarity. Outcomes include enhance capability, ease of use and effectiveness of the Lake Browser and database and add to the Lake Browser.
This project consists of habitat restoration, water quality and fish passage improvements through the removal of the existing fixed elevation dam, construction of rock arch rapids and in-stream habitat restoration.
Minnesota Zoo, Parks, and TNC will use prairie restorations and Endangered Dakota skipper reintroductions to study factors supporting butterflies and develop foundational habitat management recommendations for Minnesotas imperiled prairie butterflies.
MNHS cares for more than 100,000 cubic feet of hard-copy government records and manuscript collections dating from the territorial period to the present. To access the vast majority of these holdings, researchers must currently visit the History Center or make other special arrangements. In FY16, MNHS began piloting small projects to develop and test workflow and to identify and plan equipment and space needs. In FY17, MNHS will add staff to begin responding to patron requests for manuscript and state archives digitization in advance of a full rollout of the scan-on-demand process next year.
MNHS has in its care over 100,000 cubic feet of hard-copy government records and manuscript collections dating from the territorial period to the present. To access the vast majority of these holdings, researchers must currently visit the History Center or make other special arrangements. In FY16, MNHS is piloting a unique "scan on demand" service for researchers that will allow them to request, either online or in person, the digitization of specific materials with the resulting images being put online for wide public access.
The goal of this work order is to make additions and enhancements to the Scenario Analysis Manager (SAM) tool best management practice (BMP) database and the methodologies used for the application of the BMPs.
This work will involve enhancing the capability of the Scenario Analysis Manager (SAM) tool to run more complex point source alternative scenarios, produce results and output in line with the recently developed Watershed Restoration and Protection Strategies (WRAPS) report standards, and general enhancements requested by users.
This work order will address the need for technical support and updates to the Scenario Analysis Manager (SAM) tool and PATH software based on training feedback. The trainings will include exercises focusing on improved and added functionality as well as the enhanced best management practice (BMP) database.
RESPEC will use the Processing Application Tool for HSPF (PATH) to construct the remaining 22 Scenario Application Manager (SAM) projects. SAM assists in understanding watershed conditions, and identifying priority areas and BMPs that will provide the greatest water-quality benefits for each dollar invested. The value of the tool is in its simplification of complex hydrologic and water quality model applications into transparent estimates of the significant pollutant sources in watershed.
The goal of this project is to provide three training sessions for the Scenario Analysis Manager (SAM) software and one training session for the Processing Application Tool for the Hydrologic Simulation Program FORTRAN (HSPF) model.
The contractor will provide 4 day-long training sessions for the Scenario Analysis Manager (SAM) and 2 Processing Application Tool for HSPF (PATH) sessions. The SAM tool’s framework currently consists of a pre-processor (PATH) for interactively translating HSPF model application files, a Geographic Information System (GIS) for best management practice (BMP) site selection, a BMP database with pollutant removal efficiencies and associated costs, and scenario analysis, optimization, and reporting capabilities.
The contractor will collect and process the necessary files needed to develop a Processing Application Tool for HSPF (PATH) and Scenario Application Manager (SAM) project for 30 HUC 8 watersheds in Minnesota. SAM provides a graphical interface to the Hydrological Simulation Program FORTRAN (HSPF) model applications and expands the state’s investment in HSPF to a broader audience in support of the development of Total Maximum Daily Load (TMDL) studies and Watershed Restoration and Protection Strategy (WRAPS) reports.
The goal of this project is to develop forestry related best management practice (BMP) pollutant reduction/management efficiencies, costs, and management information applicable to Minnesota forests and incorporate these BMPs into the Hydrological Simulation Program FORTRAN (HSPF) model Scenario Application Manager (SAM) tool. By incorporating forestry BMPs into the existing SAM tool, forestry related management scenarios can be evaluated for potential impacts on surface waters and can inform the development of watershed restoration and protection strategies.
The goal of this work order is to collect and process the watershed specific files needed to create the Scenario Application Manager (SAM) project files to apply the SAM software in selected major watersheds in Minnesota where an Hydrological Simulation Program – FORTRAN (HSPF) model has been developed. This work order will also involve technical support for the SAM users who are applying the SAM projects.
The goal of this work order is to enhance the Scenario Analysis Manager (SAM) support tool in order to represent best management practices in a more physically based manner, improve point scenario representation and analysis, and support MPCA with training in the application of the enhanced functionality.
The contractor will provide 3 Scenario Analysis Manager (SAM) training sessions in the fall of 2016 for use with Hydrological Simulation Program FORTRAN (HSPF) model applications.