A general Conservation Assessment of and Long Range Plan for the preservation of the library's local history collections was prepared by Wabasha Public Library. The Library contracted with the Midwest Art Conservation Center to complete the project. The Plan will be used to set preservation policies, to identify storage and environmental needs, to make recommendations for disaster preparedness and to develop policy and procedures for the collections
The Historical society hired a qualified professional conservator to conduct a general conservation assessment of its collections and provide a long range plan for preservation. The final report summarizes the condition of the collections environment at the Reads Landing School site. Recommendations include a collection review and inventory to be conducted. A comprehensive list of resources and suppliers was also included in the final report.
On behalf of the Metropolitan Council, Environmental Financial Group Inc. generated a matrix of water conservation programs with detailed information about the costs and benefits of the programs. Tools were also developed to allow users to calculate potential water savings, estimate program implementation costs, and test the effects of various water conservation programs and rate structures.
The Contractor will assist in planning and executing the regular meetings of the St. Croix River Basin Team, including providing minutes of the meetings. Assist in the functioning of the priority issue subcommittees. Respond to public notices for re-issuances of NPDES permits, EAWs and other pertinent public notices, and participate in prioritized public meetings with local governmental units and water planning organizations.
This project Phase will collect data, background information, and watershed characteristics within the Red Lake River watershed. This information will be documented within the framework of early draft TMDL Reports (with background information, but no load calculations) for impaired reaches within this watershed and early draft protection plans for the areas in the watershed that are not currently impaired.
This project will complete an implementation plan, as required by the Minnesota Pollution Control Agency, for the Zumbro River turbidity TMDL project. It will also revise the Zumbro River Watershed Management Plan (completed 2007) to ensure it continues to reflect local needs, incorporates new information, and develops more effective linkages with related local, state and federal government programs.
This project will Install buffer strips along 25 miles of ditches in the watershed, replace 50 open tile intakes, and hold workshops in the watershed to increase conservation tillage, nutrient and pesticide management, conservation drainage and restoring wetlands.
This project will promote positive land use changes, along with a sense of watershed stewardship and awareness throughout the Crow River Watershed. This project contains three main tasks: BMP installation, public outreach and administration. This project will also work with the Big Swan Lake Association in Meeker County to host a shoreline naturalization workshop.
The Danebod Lutheran Church and Folk School commissioned the repair and restoration of a drawing by Jes Smidt. The 1918 drawing is a copy of a much earlier work by Lorens Frolich (840-935AD). The subject of the work is Queen Thyra Danebod, an important figure in Danish culture, for which the church and school are named.
The Emerald Ash Borer (EAB) has been decimating ash throughout the Great Lake States and is currently advancing into Minnesota, threatening the future of the ash forests that occur across much of the state. Of particular concern is the impact EAB will have on the ecology and functioning of black ash swamps, which cover over one million acres in Minnesota and represent the state’s most common ash forest type. Black ash trees grow and thrive in swamps and occupy a unique wet niche where few other tree species grow.
On behalf of the Metropolitan Council, Barr Engineering Company developed maps and supporting information to characterize the relationship between surface waters and groundwater, identifying surface waters most likely to be impacted by groundwater withdrawals in the region. This project also provided guidance on effective resource monitoring strategies and costs for each type of surface water feature.
Currently, there are approximately 5,050 feedlots with fewer than 300 animal units that need to come into compliance with State feedlot rules. Clean Water Feedlot Water Quality Management Grant funds are being used to provide financial assistance to landowners with feedlot operations less than 300 animal units in size and located in a riparian area or impaired watershed.
The number of people from other cultures and languages is increasing in Minnesota. It is important that they learn the behaviors that will help Minnesota preserve and enhance its natural resources. Yet, communicating and effectively interacting with people across cultures to change behaviors on natural resources, conservation, pollution prevention and stewardship is challenging. Most environmental information is designed for reaching native English readers. Translating and printing information often does not reach the intended audiences, who are often part of an oral culture.
The Thief River is the source of drinking water for the City of Thief River Falls. The river's other designated uses also include recreation and aquatic life. Water quality monitoring conducted by local agencies discovered that the Thief River is not meeting state water quality standards for both turbidity (muddiness) and dissolved oxygen. Each year, approximately 12,376 tons of sediment is deposited into the Thief River Falls reservoir by the Thief River. That is the equivalent of over 1,200 dump trucks full of dirt.
In the early 1900s, a joint State and County drainage project constructed a 1 mile outlet channel to Grand Marais Creek to provide a shorter outlet to the Red River and effectively abandoned the lower 6 miles of the natural channel. In recent times, the ditch has eroded from its original shape to a channel of steep gradients and unstable banks. This has resulted in head cutting of the channel and nearly continuous channel erosion and bank sloughing with the effect of depositing up to an estimated annual average of 700 tons of sediment into the Red River.
Three consultants with historic preservation, architectural and structural engineering expertise were contracted to conduct a structural assessment of the Grant County Courthouse concrete slab floors. They collected and analyzed data through a detailed visual survey of the floor slabs, materials testing using non-destructive methods and performing engineering analysis. Recommendations were made for the retrofit of the floor slabs.
Per Minnesota Laws, 2009, Chapter 172, Article 4, Section 2, Subd. 5, "Funds in this subdivision are appropriated to the commissioner of the Department of Administration for grants to the named organizations for the purposes specified in this subdivision. Up to one percent of funds may be used by the Department of Administration for grants administration. Grants made to public television or radio organizations are subject to Minnesota Statutes, sections 129D.18 and 129D.19."
Minnesota’s Legacy Amendment raises revenue for Clean Water, Outdoor Heritage, Parks and Trails, and Arts and Cultural Heritage. Libraries are beneficiaries of a portion of the Arts and Cultural Heritage Funding.
The city hired a preservation consultant to complete a Historic Context Study for the City of Buffalo. The general history of the community, organized by theme, provides useful information about the city's historic resources. Copies of the completed report have been given to the City Council and Planning Commission, the City Library, the Wright County Historical Society, the state Senator and Representative for the area and is available on the City's website.
This project will support construction of three watershed framework models built using the Hydrologic Simulation Program FORTRAN (HSPF). These executable models will simulate hydrology at the subbasin scale. An HSPF model will be built for each of three major watersheds: the Crow River/North Fork Crow River, the South Fork Crow River, and the Sauk River.
This project will finalize HSPF watershed model construction and complete the calibration/validation process for the following three watersheds: North Fork Crow River, South Fork Crow River, and Sauk River.
This project will complete the development of two watershed HSPF models for the Mustinka River and Bois de Sioux River watersheds. These calibrated and validated executable models will simulate hydrology at the 12-digit HUC subbasin scale.
On behalf of the Metropolitan Council, the Minnesota Geological Survey collected information and conducted an assessment of the hydraulic properties and chemistry of selected aquifers in the metro area. This project greatly improves the accessibility of existing data, which were previously available only in scattered paper reports. A robust database of groundwater age, aquifer hydraulic conductivity and groundwater chemistry data was developed to make the information easily accessible to water resource managers.
This project will construct, calibrate, and validate two Hydrologic Simulation Program FORTRAN (HSPF) watershed models. The consultant will produce HSPF models that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDLs) at the Big Fork River and Little Fork River watersheds.
This project will complete spatial and temporal revisions of 6 Hydrologic Simulation Program FORTRAN (HSPF) models, the recalibration and validation of 7 watershed HSPF models, and the revision of the drainage network and point source representation of the Pomme de Terre HSPF model.
In 2005, Metropolitan Council was directed to carry out regional water supply planning activities under Minnesota Statutes, section 473.1565. Working closely with the region's many water supply stakeholders and under the guidance of a metropolitan area water supply advisory committee, Metropolitan Council developed and adopted a metropolitan area master water supply plan (master plan) in 2010. The plan provides a framework for water supply planning and identifies actions needed to achieve the goal of ensuring sustainable water supplies across the region.
The Lac qui Parle County Historical Society/Museum purchased a laptop computer and a PastPerfect software program to facilitate the inventory of their entire historical collection. The program is stored on the Lac qui Parle county server.
Minnesota’s Legacy Amendment raises revenue for Clean Water, Outdoor Heritage, Parks and Trails, and Arts and Cultural Heritage. Libraries are beneficiaries of a portion of the Arts and Cultural Heritage Funding.
This project will complete data collection on 11 lakes over a 2 year period in the Pomme de Terre Watershed. The data collected will be be used in the Major Watershed Project proposed for this watershed.
This project will develop an Implementation Plan for restoring Lake St. Croix and impaired waters within the contributing watershed, and protect waters currently attaining water quality standards.