Revitalizing the old deer yards into Caribou Yards is a transformative initiative aimed at creating habitats for a herd of caribou. The need for this project arises from the closure of the old deer yards, which were previously inhabited by white-tailed deer until the last one passed away of old age. Subsequently, the fencing surrounding these three habitats has weathered and suffered damage during the years of inoccupancy.
This monitoring project includes lake and stream monitoring and encompasses all of Cass County, and surrounding counties. The project will obtain water quality data for streams; in 2009, lakeshed assessments indicated that many surface waters throughout the county were data deficient. This project will address the need for sufficient data on a county-wide basis and fulfill the State’s intensive watershed monitoring program goals by obtaining water quality data at targeted lake and stream sites.
This project will include lake and stream monitoring on 23 lakes and 4 streams found within the Leech Lake River and Pine River watersheds in Cass County. The project will be conducted in an effort to gain sufficient data on these data-deficient lake and stream sites within these watersheds. All of the proposed monitoring sites are target sites located in the targeted watersheds for 2012. Cass ESD is partnering with Hubbard SWCD, the Leech Lake Band of Objibwe, and RMB Environmental Laboratories to conduct the fieldwork for this project.
This project targets stabilizing 900+ feet of eroding shoreline in the Cedar Lake Farms Regional Park converting it into a healthy native buffer on Cedar Lake.The project addresses phosphorus loading by reducing erosion from unstable shoreline banks adjacent to Cedar Lake. This will increase infiltration, intercept upland runoff, and stabilize the soil at the water's edge to decrease erosion and the addition of phosphorus into the lake. It is estimated that a shoreline stabilization at Cedar Lake will reduce 12-25 lbs/ year phosphorus depending on the regression rate.
Cedar and Farm Island are large recreational lakes located in the Aitkin/Brainerd Lakes area. Both lakes are showing significant downward trends in water clarity. The trend coincides with watershed development that increases water runoff. This project seeks to reverse that trend before these lakes degrade further and become impaired. Changing land uses now through incentives is a very cost-effective way to manage these lakes.
The Children's Discovery Museum in Grand Rapids, Minnesota aims to strengthen its highly successful School Service Program by retaining a Program development coordinator, changing core interactive exhibits and creating new curriculum for pre-school and K - 5 students in ten northern Minnesota counties.
The Children's Discovery Museum in Grand Rapids, Minnesota will strengthen its acclaimed school service program by: (1) continued leadership of a new Program Director retained on January 1, 2016 (2) creating a new (Minnesota built) core interactive exhibit; (3) developing new curriculum for pre-school through 3rd grade students in ten northern Minnesota counties.
Pileated Woodpeckers are keystone habitat modifiers that support an array of game, non-game, and conservation concern species. Additional information is needed to understand cavity dynamics for these species.
The Children’s Museum of Southern Minnesota (CMSM) will build upon a strong foundation of Minnesota Arts, Culture and Heritage (ACH) learning experiences made possible with prior MN Legacy funding support to:
As an established Children's Museum, it is time to re-evaluate our policies, programs, displays, & activities. There will be financial support (scholarships) for classroom/community field trips and bussing which will allow children of all abilities and ethnicities to have a museum experience. Data and suggestions collected from the teachers or adult chaperones will be shared with the Grant Committee and Advisory Board for their work.
This project will support new exhibit components and enhancements, provide admissions and transportation to underserved and diverse communities, and teacher-led programs for children that are sensory sensitive, in relationship with Autism Society of Minnesota.
Completion of the activities in the previously-funded project. The project will result in the construction of an approximately 7200 s.f. maintenance shop and administrative office, replacing an existing inadequate facility. Project activities include demolition, design, engineering, construction, construction administration and other related construction costs
This project represents a one-time opportunity to improve the quality of stormwater runoff from the parking lot and access road at Cleary Lake Regional Park. Cleary Lake is listed as impaired for excessive nutrients and is a focal point for many park activities. Three Rivers Park District and Scott County are partnering to reconstruct the park access road and to mill and overlay or conduct full depth reclamation of the parking lot at the park in 2013. Other partners include the Scott Watershed Management Organization (Scott WMO) and the Scott County Public Works Department.
Rising temperatures and increased precipitation contribute to decreased oxygen and increased methane in Minnesota lakes and wetlands. We will identify impacts on water quality and methane emissions, providing management guidance.
Understanding interconnected social justice histories is foundational to build solidarity with Black, Indigenous, People of Color (BIPOC) communities to address systemic inequalities. LinkingLeaders Partnership will integrate solidarity practices by creating and integrating resources, tools, and modules for teaching BIPOC histories in our programs. Resources will be shared as models for practicing solidarity to be used and adapted by others doing solidarity and racial justice equity work.
The project helps put The Landing back on a professional collections management footing after a disastrous fire several years ago that destroyed all of their inventory information.
The grant allowed them to start making an inventory of the twenty-five buildings that make up The Landing including recording the condition and location of the collection.
Building on past efforts to catalog collections, the Three Rivers Park District continued the assessment and inventory of collections at The Landing in Shakopee. Inventories of 1, 015 artifacts from six (6) individual structures: the Wilkie House; the Graffenstadt House; the Kahl House; the Harms House; the Bank, and the Boesel "Red" Barn were conducted. All artifact information was recorded by PastPerfect software.