We propose to integrate Minnesota Wildflowers Information, an online tool for plant identification, with the Minnesota Biodiversity Atlas, to preserve and extend this popular ENTRF-supported resource for future use.
This project helps Minnesota entities that directly or indirectly cause PFAS and microplastics contamination stop the flow of the contaminants by developing strategies to manage solid waste streams.
This project is a cooperative initiative between the Prior Lake Spring Lake Watershed District, the City of Prior Lake, and the Scott Soil and Water Conservation District to implement on-the-ground Best Management Practices (BMPs) that will protect and improve water quality in Spring, Upper Prior and Lower Prior Lakes, water resources of local, regional, and state significance. Spring and Upper Prior Lakes are both impaired and have a completed Total Maximum Daily Load and Implementation Plan.
Regional public projects that are the focus of the proposed project include: Infiltration areas and a sedimentation pond enhancement in subwatersheds N3/N4; Parking lot storm drain rain gardens and a sedimentation pond enlargement in subwatersheds N5/N6; An infiltration area and a sedimentation pond enhancement in subwatersheds S9/S11; Ditch checks along Highway 13 in subwatershed 10.
Prior Lake, the second most visited lake in the metro, and Spring Lake are both impaired for excess nutrients. The Prior Lake Spring Lake FY 2025 request would seek to fund two projects to reduce nutrients in the upper watershed:
Collaboration between African and Asian American artists to jointly create/present a new dance drama - Resonance.
Project Resonance orchestrates new creations of music and dances to serve as a communication bridge across cultural/racial lines, to mitigate racial tensions between African and Asian communities, to illustrate the cross-cultural experience, and eventually promote Intercultural Harmony.
Resonance inspires inner/outer connections to create sustainable impacts.
This project will reduce sediment to the Minnesota River, control erosion and reduce sedimentation in a local DNR Protected Water and protect private land and public infrastructure. The County Road (CR) 6 ravine (Quarry Creek) cuts through the Minnesota River valley bluff in Blakeley Township. Active channel incision and erosion within the ravine has caused large amounts of sediment to be deposited under the bridge at CR 6 such that the road is frequently flooded and sediment has to be removed several times a year.
The City of Wyoming has proudly commenced construction of Railroad Park, a new and exciting addition to our community that will kick off the redevelopment of our downtown development plan. This vibrant community space is being developed in three phases as we work towards celebrating our City's rich heritage, honoring our veterans, and providing an inclusive and welcoming environment for residents and visitors alike. The first phase of Railroad Park, which construction began on in Fall of 2023, is the Veterans Memorial portion of the project.
This project is a documentary film about the intercultural experiences of immigrants living in Minnesota. It features footage of live performances at the Southern Theater, followed by talkbacks with cultural leaders and scholars; and the voices of audience and community members, recorded in post-performance conversations and interviews.
Development of regional trail master plans for the Southern Scott Regional Trail Search Corridor (from Cedar Lake Farm to Cleary Lake Regional Park) and the Louisville Regional Trail Search Corridor including consulting services to prepare the master plans and facilitate a public engagement process.