Central Mississippi Riverfront Regional Park, revise master plan to guide future trail development and improvements throughout park including Father Hennepin Bluffs, Nicollet Island, BF Nelson, Boom Island, and Mill Ruins.
The Rice Creek Watershed District (RCWD) will create a web-based, mobile-compatible public drainage system inspection and maintenance database. This database system will enable District staff to create and track maintenance requests and inspections from the field, including Geo-referencing locations requiring repair via a mobile device. The system will greatly reduce the time required to identify and log each maintenance request, enabling staff to inventory more miles of public drainage system yearly thereby identifying erosion problems more efficiently and thoroughly.
This project will complete the final Implementation Plan, semi-annual and final reports and hold project meetings. The Implementation Plan will identify target areas and priorities for implementation strategies to improve water quality for Bluff Creek. This project will build the groundwork so Bluff Creek will meet water quality standards for aquatic life in the future.
This continuation of the Reinvest in Minnesota (RIM) Reserve buffers program will protect and restore riparian areas, permanently protecting approximately 600 acres on 17 easements. This program will continue utilizing a science-based ranking and selection process and be implemented locally, working with Soil and Water Conservation District (SWCD) staff in targeted areas in the state. Historically, buffer funding was used to expand basic water quality buffers into larger buffers.
This program is a part of a comprehensive clean water strategy to prevent sediment and nutrients from entering our lakes, rivers, and streams; enhance fish and wildlife habitat; protect groundwater and wetlands. Specifically the Riparian Buffer Easement Program targets creating buffers on riparian lands adjacent to public waters, except wetlands. Through the Reinvest in Minnesota Program (RIM) and in partnership with Soil and Water Conservation Districts and private landowners, permanent conservation easements are purchased and buffers established.
On May 20,1863 in St Louis, Missouri the Union Army Special Agent of Contrabands sent 218 African Descendant persons to Ft Snelling on the Steamboat Davenport. The Steamboat Northerner towed a raft to Ft Snelling arriving on May 5, 1863. This project seeks to document the resettlement at Ft Snelling and how this group and Black Civil War Veterans changed the course of history in Minnesota by succeeding in amending the state Constitution to grant citizenship to African American men in 1869.
We propose identifying hot spots of groundwater chloride pollution of surface waters due to excessive road salt use, which is a long term source increasing chloride impairment of surface waters.
To hire professionals to assess and write a collections plan for a historically significant collection, which will allow greater public access to this resource.
1.) Train approximately 42 teachers in directions, numbers, greetings, thank yous, object and place names in either Ojibwe or Dakota 2.) Host three Language Celebrations for all teacher participants, their families and students, with Indigenous foods and cultural activities 3.) Provide teachers with a stipend and gift upon completion of the year-long curriculum
To hire qualified professionals to repair the flooring in the Hennepin County Library, Robbinsdale Branch, listed in the National Register of Historic Places.
Shanaya Dungey aka The Foolish Know It All will facilitate an artistic & cultural heritage preservation pilot project with five to ten Minnesota based descendants of enslaved African American ancestry to discover, collect, & document their family genealogy in a manner that is culturally relevant, preserves their family history, & honors their stories. The project will culminate with an exhibit capturing the process, participant thoughts throughout, & snippets of genealogy documents created.
Hennepin County will implement prioritized projects from the Rush Creek Subwatershed Assessment, including closing about 200 open tile intakes on the farms of 11 landowners, establishing 6 grassed waterways, two exclusion fence systems, and two contour farming conversions. These projects will significantly reduce bacteria loads upstream of Elm Creek Park Reserve where the creek serves as a learning laboratory for more the 2,500 students each year. In addion, these projects will reduce sediment by 616 tons per year and phosphorus by 478 pounds per year.
Seven lakes and four streams in the Elm Creek watershed are impaired by excess nutrients, bacteria, low oxygen, and unhealthy biotic communities. Modeling completed for the Watershed Restoration and Protection Strategy identified areas that contribute high loads of sediment and nutrients to the streams and lakes in the watershed, however, the scale of that modeling was not sufficient to pinpoint to the field level where BMPs would be most effective. The Rush Creek Headwaters Subwatershed Assessment will evaluate four high pollutant loading catchments.