In 2010, the Minnesota Pollution Control Agency listed Keller Lake as impaired for excess nutrients. An in-lake alum application was identified as the primary phosphorus load reduction option for controlling internal phosphorus load in Keller Lake. A recently completed in-lake management feasibility study report indicates that the in-lake alum application is the most cost-effective implementation project that remains for Keller Lake.
The City of Apple Valley will conduct a subwatershed assessment on the sections of Apple Valley draining to Keller Lake to target potential projects. The goal is to identify potential cost effective retrofit projects and operations improvements capable of fulfilling needed phosphorus reductions ahead of a number of planned infrastructure projects tentatively scheduled for 2018-2022.
The Keller Lake Water Quality Improvement Project achieves the goals of the City of Burnsville, Black Dog Watershed Management Organization, and the Keller Lake TMDL by:-Achieving the City of Burnsville phosphorus removal requirement outlined in the Keller Lake TMDL by removing 78 lbs/yr-Utilizing remaining available land to construct a high performance, regional stormwater BMP-Providing a high profile water resource/stormwater educational opportunity in the frequently visited Crystal Beach Park-Retaining valuable open space in popular Crystal Beach Park by constructing the BMP undergroundK
King Park, a city-owned park in Lakeville, consists of baseball fields, a park building, and a parking lot. A portion of Dodd Blvd, a driveway, and the parking lot drain to a stormwater pond at the north end of the park where water is retained, treated, and reused to irrigate two ball fields. This stormwater reuse project was constructed by the Vermillion River Watershed Joint Powers Organization (VRWJPO) and the City of Lakeville in 2010 to meet VRWJPO and city goals.
The project will increase lake and river access e.g. dock and carry-in portage; provide trails and small gathering space on Echo Point; restore and re-naturalize the park with trees, shrubs and native perennials; improve the layout and/or capacity picnic ground and campground; and other master plan approved improvements. The project includes design, engineering, construction and construction administration.
The purpose of this project is to continue supporting the Minnesota Pollution Control Agency in responding to public comments on the Lake Pepin Watershed Phosphorus Total Maximum Daily Load (TMDL) study, which was prepared by LimnoTech under previous work orders.
The consultant LimnoTech will support response to Total Maximum Daily Load (TMDL) comments the peer review process, United States Environmental Protection Agency and public notice. They will then revise the TMDL document as needed and attend internal and external project meetings.
The goal of this project is to finalize the Lake Pepin Watershed phosphorus total maximum daily load (TMDL) report by using the existing information and documentation prepared under previous contracts to prepare one TMDL report that addresses the impairments on the mainstem of the Mississippi River. Information developed to date for draft TMDLs on the Minnesota River mainstem will be documented for later use by the Minnesota Pollution Control Agency.
The goal of this project is to support the Minnesota Pollution Control Agency (MPCA) in responding to public comments on the Lake Pepin Watershed Phosphorus Total Maximum Daily Loads (TMDLs), which were prepared by LimnoTech under previous phases of the project.
The goal of this project is to prepare a draft Lake Pepin Total Maximum Daily Load (TMDL) Report. Lake Pepin is impaired by high levels of nutrients that cause excessive growth of algae.
The goal of this project is to finalize the draft Lake Pepin Total Maximum Daily Load (TMDL) Report, issue it for public comment, address comments, and finalize the report. Lake Pepin is impaired by high levels of nutrients that cause excessive growth of algae. High levels of sediment, carried in by major river systems, also affect the lake. The sediment is filling in the lake at a much faster rate than before Minnesota was settled and intensely farmed. Nutrients and sediment are distinct yet inter-related pollutants, and are being addressed in separate TMDL reports.
Lanesboro Arts will launch the Equitable Systems Change project for the Lanesboro Arts Gallery as a commitment to a thorough review and change of current systems and processes, based on detailed recommendations to align practices with equity values and more deeply serve BIPOC and LGBTQIA+ artists.
Lao Culture Dance & Traditional Fashion Show will be implementing training youth for new leadership program. We are focusing on teaching students by passing on the skills & knowledge of traditional Performing art to a young generations to continue the tradition. We will make sure that the students that completed the program will be able to teach & passing on & continue the work to keep our tradition & rich Lao heritage and Culture. The youth leader will be great asset for our Communities.
This project is a fall 2024 exhibition of art created by self-identifying Latina women and non-binary, Latinx Minnesota-based artists with ancestral roots in Latin America. The exhibition is being co-curated by local visual artist, community muralist and educator, Zamara Cyan, and William Gustavo Franklin, an independent art curator, educator and author of the recent volume, Latin Art in Minnesota Conversations and What's Next (Afton Press, 2023).
Dodge Nature Center will teach 10,000 Minnesota K-6 youth through standards-aligned, outdoor experiences and hands-on learning at our new Shepard Farm property.
Dakota County is partnering with the Dakota Soil and Water Conservation District to preserve and enhance the chain of shallow lakes in Lebanon Hills Regional Park which is owned and operated by Dakota County and located within the City of Eagan. Dakota County proposes to construct two regional iron-enhanced sand filtration practices to achieve the load reduction goals set forth in the LHRP Subwatershed Assessment Report to protect Jensen and Schulze lakes and prevent them from being listed on the 303(d) Impaired Waters List. The project will reduce 26 pound of phosphorus annually.
to design and install a solar hot water system at Lebanon Hills Campground Restroom and Shower Building along with an interpretive display to inform visitors how the hot water is generated