This project is a cooperative effort including Cass Soil and Water Conservation District, the Association of Cass County Lakes (ACCL), and registered Homeowner Associations throughout Cass County. All of Cass Counties 514 lakes and streams eventually drain into the Upper Mississippi Watershed. Sediment and nutrient pollution continue to be a primary concern when addressing water quality protection issues.
The Duluth Children’s Museum has initiated three major programs with the support of the Arts and Cultural Heritage Legacy Funds. This program continues and expands these successful programs to ensure continuity in cultural experiences for the youngest audiences in rural Minnesota. The programs are organized under two major headings: Museum on the Move and Passport to Culture. Passport to Culture is an access program designed to give constituents admission to the museum.
The Perpich Arts Integration Network of Teachers (PAINT) fosters collaborative arts integration in Minnesota through K-12 teacher professional development and funding to schools. With Perpich Center facilitation, teacher teams develop and implement arts-integrated lessons and units. PAINT program components include:
The 400-mile stretch of the Mississippi River from its headwaters at Lake Itasca to Morrison County near Little Falls is the focus of this project. Working in cooperation with the eight member counties, this project will develop implementation plans and strategies geared specifically for the Mississippi River and incorporate them into the individual County Comprehensive Local Water Plans. These recommendations will be for specific strategies, often crossing county boundaries for implementation.
To bring a variety of new arts and cultural heritage programming to the Northern Minnesota District Fair. Fair will collaborate with Ice Box Radio Theater, Native American speakers, host a bag pipe band and a local country band.
Project has protected forest wildlife habitat in central Minnesota through fee title acquisition of key forest tracts. Title of lands acquired will be held by Cass County in fee.
Landowner-donated conservation easements in Aitkin, Cass, and Crow Wing counties permanently conserved 260 acres and 3.6 miles of critical shorelands for the protection and enhancement of fish and wildlife habitat and continued public recreational enjoyment of these aquatic resources.
This project will provide land and water managers in the Red River Basin with data and online tools to prioritize actions on the landscape that achieve water quality objectives identified in local and state plans. This will help identify strategically important locations for implementing erosion control and water management practices. Standardized watershed-based data products will be integrated into a web-based planning tool which will be added to the Red River Basin Decision Information Network (RRBDIN) being developed as part of the Red River Watershed Feasibility Study.
To restore and repair windows on the Soo Line Depot, listed in the National Register of Historic Places and current home of the Cuyuna Iron Range Heritage Museum.
Protecting 980-acre LaSalle Lake property adjacent to the Upper Mississippi River, with biologically-significant forest habitat and miles of deep-lake and coldwater stream shoreline, to be managed by multiple DNR divisions.
Approximately 70 percent of all Minnesotans rely on groundwater as their primary source of drinking water. Wells used for drinking water must be properly sealed when removed from service to protect both public health and Minnesota’s invaluable groundwater resources. The Minnesota Department of Health with the assistance of the Board of Water and Soil Resources protects both public health and groundwater by assuring the proper sealing of unused wells.” Clean Water funds are being provided to home owners as a 50% cost-share assistance for sealing unused private drinking water wells.
This pilot program protected 1,210 acres of wild rice lake shoreland habitat in the Northern Forest Section by securing 14 permanent RIM conservation easements and four fee-title acquisitions, surpassing our goal of 700 acres, and doing so $250,202 under budget.
to construct phase 4 of the Shingobee Connection, which is a bike/pedestrian bridge across Pumphouse Bay of Leech Lake adjacent to the existing road bridge
This phase of the project will complete a TMDL for the impaired reaches of the Snake River Basin. The project includes development of a Unit Area Load model for nutrient sources, a spreadsheet version of a BATHTUB lake response for four lakes, and a bacteria source assessment. Contractor will also provide all stream channel data as a spreadsheet database and in GIS.
to construct 3.8 miles of 10 foot wide asphalt multi-use trail connecting Buffalo Hills Park and Kiwanis Park to the Spur Line Trail, the Cuyuna Lakes State Trail and the Paul Bunyan State Trail
This project contains several activities that will implement effective, shovel ready conservation practices on multiple water bodies. The goal is to reduce the erosion impacting stream bank stability. Three initiatives will be implemented, including the installation of four shoreland restoration/stabilization projects, completion of two stream bank stabilization projects on the Middle Fork Crow River and a rain barrel program. An education program will provide outreach to lake and city residents throughout the Middle Fork Crow River Watershed.