The Pomme de Terre River watershed is located in west central Minnesota and occupies a portion of six counties. For many years surface water quality within the watershed has been a concern to local government. In 1982 the Pomme de Terre River Association Joint Powers Board (JPB) was formed to begin addressing this issue. In 2002 the Pomme de Terre River was placed on the Impaired Waters list for turbidity. The goal of the JPB is to improve the local water resources within the watershed through voluntary efforts and building relationships with local landowners.
The Pomme de Terre River watershed is located in west central Minnesota and occupies a portion of six counties. For many years surface water quality within the watershed has been a concern to local government. In 1982 the Pomme de Terre River Association Joint Powers Board was formed to begin addressing this issue. In 2002 the Pomme de Terre River was placed on the Impaired Waters list for turbidity. This project is a continuation of a 2011 Clean Water Fund project.
To partner with the Scott County Historical Society to co-design a mobile recording booth big enough to house high-quality recording equipment, a table and seating for 2-4 people, and create a Best Practices manual on collecting oral histories. The booth would include a ramp and wide door and table for ADA accessibility. Scott County Fair will pilot the first round of interviews during the fair, and support the Historical Society to implement plans to manage the collection of stories, train volunteers to staff the booth, and conduct transcription.
To prepare a nomination to the National Register of Historic Places for Bridge No. 3145 Long Meadow Lake Bridge (Old Cedar Ave. Bridge), Bloomington, MN.
A family dairy farm in the shoreland area of Lake Miltona has a liquid manure storage area that is not up to standards due to sandy soil and a high water table, increasing the likelihood of groundwater contamination. Lake Miltona is connected to the Alexandria Area Chain of Lakes and ultimately the water ends up in the Long Praire River. Groundwater impacts to the Long Prairie River have the potential to be significant.
Lake Miltona is considered one of the finest lakes in Central Minnesota and its 15 miles of lake shore make it the largest lake in Douglas County. Smokey Timbers Youth Camp, owned by the Smokey Timbers Foundation, is located on the north side of Lake Miltona. There is currently an erosion problem at the camp where a large gully has developed that drains into the lake.
Funding was used to design, install and evaluate deterrent barrier options in Minnesota and to cost share a barrier in northwest Iowa to limit or slow the movement of Invasive carp.
The Bluff Creek Watershed TMDL Implementation Plan evaluated the stream power index for each of the gullies identified in the 1996 Management Plan. Based upon this terrain analysis, sediment loading rates from the 1999 to 2008 P8 modeling results, and modeled surface runoff, known erosion sites were prioritized. This site, which is tributary to Bluff Creek and the Minnesota River, was given the highest priority ranking.
A large portion of Wadena County has been identified as having a high or moderate probability of elevated nitrate concentrations. With almost all of the residents in Wadnea County getting there drinking water from groundwater sources, this issue is a top priority to the county. Through this project, nitrates and other water soluble contaminants leacing into sensitive sand plain aquifers will be reduced by providing cost-share incentives to encourage irrigation producers to convert high or medium pressure irrigation systems to low pressure systems.
The goal of this project is to implement 10-15 medium sized projects that will infiltrate and reduce pollutant loads to the waters in the Riley-Purgatory-Creek Watershed District. The District intends to achieve this by using their Citizen Advisors who are well involved with local associations, City staff who are familiar with associations in their jurisdiction and also seek less-known association through various advertising methods. We intend to use staff knowledge to insure that the projects are suitable for the site and implemented correctly to maximize efficiency.