The projects planned for the grant funds focus on essential updates and enhancements to our historic building, ensuring that we can continue to provide a safe, welcoming, and inclusive space for all who visit. The proposed improvements include upgrading our HVAC system, kitchen, and security infrastructure; rebuilding the handicap ramp for improved accessibility; sourcing new patio furniture; and resealing the venue's dance floor. Each of these initiatives is designed to maintain the integrity of our facility while enhancing the experience of our diverse audience.
This project will conduct a 2017 revision of the South Fork Crow River, North Fork Crow River and Sauk River Watershed Hydrological Simulation Program FORTRAN (HSPF) models and review of the Pine River Watershed HSPF model.
The Children's Museum of Southern Minnesota planned for the cultural alignment of the permanent Children's Museum's art curation, signage, and interactive experiences. The primary focus of this cultural content related to southern Minnesota including Dakota art, culture, and heritage and complemented the Exhibit Development and Fabrication Legacy grant goals.
This project will support a civic engagement cohort that will be offered in southwest Minnesota to foster partnering and build capacity of local government, organizations, and residents for effective civic engagement in water protection and restoration. This project will also build networks and the skill set of local resource professionals to do effective civic engagement work for water restoration and protection. The cohort will be administered through the Minnesota River Board (MRB), established in 1995 with a goal of focusing water management efforts on the local level.
This project will finalize HSPF watershed model construction by incorporating internal phosphorus loading in modeled lakes, run a suite of implementation scenarios and generate a GenScn project containing model output. The consultant will produce HSPF watershed models that can readily be used to provide information to support conventional parameter TMDLs. The consultant will deliver all modeling files for baseline and implementation scenarios and provide a GenScn project containing model output.
This project includes project planning, coordination, stream reconnaissance, and begins the effort towards civic engagement/outreach components of the South Fork Crow River Watershed project. Phase I will focus towards the development of project teams, identifying stakeholders, developing an initial civic engagement strategic plan and conducting limited lake and stream monitoring.
This project will complete a pollutant source identification and subwatershed information report and support the development of a Draft Restoration and Protection Plan (RAPP). It will also support the devlopment of a Implementation Plan that will identify target areas for BMP implementation for bacteria reductions.
This project will complete spatial and temporal revisions , recalibration and validation of 7 watershed HSPF models. These fully functioning calibrated validated executable models will simulate hydrology, sediment (sand, silt, and clay), temperature, phosphorus, nitrogen, dissolved oxygen, biochemical oxygen demand, and algae at the 12-digit HUC subbasin scale (or finer).
This project will continue the offering of low-interest loans to citizens, some of whom may not be able to acquire funding otherwise, for upgrading 50 septic systems to ensure compliance with state rules. Grant funds will be used to administer the low-interest loan program.
Construction of a 6.6 mile bituminous trail along CSAH 35 connecting the cities of Dent and Vergas to the Heart of the Lakes Regional Trail and Maplewood State Park
This project determines ambient background per- and polyfluoroalkyl substance (PFAS) levels in urban and non-urban soils. This information will help Minnesota develop management strategies for PFAS contaminated soils.
We will determine the distribution, relative density, and spatial occupancy patterns of 3 small weasel species in Minnesota to fill key knowledge gaps in weasel distribution and status in Minnesota.
We restored and enhanced a total of 40,539 grassland acres with 446 activities on Wildlife Management Areas, Scientific and Natural Areas, Native Prairie Bank easements, Waterfowl Production Areas, and National Wildlife Refuges.
This project supports continuing development of County Groundwater Atlases for approximately three years. The goal is to provide this valuable water and resource management information infrastructure to every county.
The following table provides a short summary of the accomplishments under this appropriation. In total, the DNR enhanced and restored 283 sites for a total of 17,087 acres.
With this appropriation, the DNR enhanced and restored over 11,700 acres of public lands or permanently protected private lands under easement. Projects under this appropriation included prescribed fire, prescribed or conservation grazing, woody removal, and enhancing plant diversity. With this appropriation we were able to exceed our target acreage by 38 percent.
Minnesota's iconic northern forests, wetlands, and brushland habitats require management beyond basic forestry practices or at smaller scales than commercial operations work. Other enhancements, such as brushland shearing or mowing have low commercial value but high wildlife value. These additional habitat enhancements improve the quality of the forests for both wildlife and outdoor recreation.
Minnesota's iconic forests and brushland habitats require enhancement beyond DNR timber harvest practices. Enhancements, such as brushland shearing provide critical wildlife habitat but are not achieved through timber harvest practices. These additional habitat benefits improve the quality of the forests for wildlife, water quality and outdoor recreation. DNR's Conservation Agenda, Wildlife Action Plan, Forest Action Plan, SNA Strategic Land Protection, Fish Habitat Plan, will guide habitat enhancements in this proposal to meet the objectives put forth in these plans.