We will assess the environmental quality of prairies across Minnesota. On-the-ground surveys and contaminant risk assessments will help inform partner management actions, endangered species recovery plans, and pollinator reintroduction efforts.
To improve security of a National Register building by adding eleven cameras to the security system.
Citizens for Backus/AB added eleven cameras to a basic five camera security system, replaced locks and updated the electronic entry of the historic E.W. Backus Jr. High School, now known as the Backus Community Center in International Falls.
Bartlett Lake in Koochiching County is impaired for eutrophication and has already undergone a paleolimnological study. This project will utilize the data and results of paleolimnological study to develop in-lake management strategies that, if implemented, could significantly improve the water quality of Bartlett Lake.
The primary goal of this project is to analyze of dated sediment cores to reconstruct changes in the lake condition over the last 150 years. This will be done using multiple lines of evidence including biogeochemistry, sediment accumulation, and diatom and algal remains as biological indicators.
The Berger Fountain, known as the dandelion fountain to most, was installed in 1975 by Benjamin Berger and has been a beloved neighborhood landmark in Loring Park and a favorite location for wedding photographers and children ever since. Ben Berger was a park board commissioner and, after seeing a dandelion fountain in Australia, fundraised to build a sister fountain right here in Minnesota.
The purpose of this contract is to expand data collection efforts, public participation efforts, and provide technical assistance in targeted areas of the Big Fork River Watershed for the Watershed Restoration and Protection Strategy (WRAPS) Project. A key aspect of this effort is to develop implementation strategies for targeted areas of the watershed to help state agencies, local governments, and other watershed stakeholders determine how to best proceed with restoring and protecting the watershed.
The goals of this project are to develop and implement a stakeholder and public engagement program, update the Hydrological Simulation Program FORTRAN (HSPF) models for the Big Fork and Little Fork River Watersheds, develop Total Maximum Daily Load (TMDL) studies for impaired waterbodies, remove naturally impaired streams from the impairment list, develop a Watershed Restoration and Protection Strategy (WRAPS) report, and to conduct civic engagement activates necessary to ensure project success.
"This project will meet the following goals: develop, implement, and evaluate the impacts civic engagement outcomes for the Big Fork River Watershed; create a citizen understanding of the Watershed Restoration & Protection Strategy (WRAPS) and Total Maximum Daily Load (TMDL) process and the role citizens and stakeholders can play in attaining water quality restoration and protection; provide opportunities for citizens and stakeholders to assist local partners and state agencies in developing priorities for restoration as well projects to accomplish protection of high quality waters; and
The "Bigfork River Target Watershed Assessment – Lake of the Woods & Koochiching Soil and Water Conservation Districts" Project focuses on collecting water chemistry and field parameters at Bear River, Big Fork River (4 sites), Caldwell Brook and Sturgeon River. The project will support the biological assessments being completed by MPCA staff for this Target Watershed Assessment. This work will also train and develop Koochiching SWCD staff to enable them to continue water quality monitoring in the Rainy River Basin.
This study will leverage our current bioacoustics monitoring framework to assess avian diversity at the statewide scale through a citizen science acoustic monitoring program, with a focus on private lands.
This project consists of the design of a new marina/dock complex on Birch Lake in Babbitt Minnesota. The City will own and operate the marina/dock complex.
The goal of this project is to facilitate strategic networking, relationships, and learning in targeted groups to assess, build, and leverage community capacity (i.e. community resources and values) to increase knowledge of the Blue Earth River watershed’s water resources and increase best management practice (BMP) adoption to restore and protect water quality in the Blue Earth River watershed. Additional goals include providing information that is readily available to the general public for updates on Watershed Approach work in the Blue Earth River watershed.
The Blue Earth SWCD will be monitoring 7 stream sites located in the Le Sueur River Watershed. The stream sites will be monitored at the road crossing locations via bridge, culvert or shore. Onsite conditions will be recorded, water sample readings will be taken for Secchi tube, specific conductance, temperature, pH, DO, and photos taken.
The purpose of this project is to complete a feasibility study to determine the best sites for projects in the Boot Creek headwaters, in the Le Sueur River watershed, to reduce erosion and pollutant loading. The study will identify critical source areas and provide additional watershed information to assist in prioritizing locations to address local resource management and water quality goals.