Stearns County Ditch 26 (CD 26) is a 20 mile channelized section of Getchell Creek, a primary tributary to the Sauk River that is impaired for turbidity, E.coli and aquatic macroinvertebrate bio-assessment. The Stearns County Ditch 26 Drainage Management Project will address the stormwater runoff concerns identified within this public drainage system. Alternative intake structures to manage nutrients and mitigative measures will be taken to retain water on the upland properties and minimize flow rate and velocity.
RESPEC is a contractor with knowledge of site-specific standard development and will respond to United States Environmental Protection Agency questions and concerns regarding attainability of standards. The response will be based on bathtub model data and also a review of technical memorandums developed by the Minnesota Pollution Control Agency on aquatic life and aquatic recreational standard attainability.
The Sauk River watershed was selected to participate in the federal Mississippi River Basin Initiative (MRBI) program in 2010 to decrease nutrient contributions to the Mississippi River and the Gulf of Mexico. The MRBI program provides federal cost share funds to landowners to install conservation practices.
Thiel Creek is a designated trout stream in southern Stearns County and outlets into Lake Marie and Lake Louisa. Both lakes are impaired for nutrients. Thiel Creek is experiencing severe bank erosion and local residents have expressed concern about the excessive sedimentation entering the lakes. Most of this erosion is occurring on an approximate mile reach of the creek just upstream of the outlet into the lake.
The Two Rivers Watershed is listed as a high priority in the Stearns County Comprehensive Water Management Plan. This project will inventory the existing public drainage systems and develop a targeting program to measure, prioritize and target the factors causing the water quality problems of Two Rivers Lake (impaired for nutrients) in Stearns County. With public access and a county park on the lake, it is a destination for fisherman in the area.
The goal of this project is to assess groundwater sustainability in the I-94 corridor between the Twin Cities and St. Cloud due to the corridor's significant expected growth, the inerent natural limits of groundwater, and the vulnerability of groundwater to contamination.
This project will target three identified drainage systems contributing to one tributary outfall to Long Lake, an impaired water body of the Sauk River Chain of Lakes. These systems produce large volumes of stormwater runoff that degrades the tributary and compromise water quality.
This project will provide the monitoring of reaches where there are data gaps, incorporate new data and analyze relevant data, identify pollutant sources, hold a stakeholder meeting, and gather information towards the future development of a Draft Restoration (TMDL) and Protection Plan.
The goal of this project is to conduct water chemistry monitoring at two subwatershed sites based on flow conditions, targeting runoff events using protocols defined in the Watershed Pollutant Load Monitoring Network (WPLMN) Standard Operating Procedures and Guidance. The data collected will be submitted to the Minnesota Pollution Control Agency (MPCA) and used in the FLUX32 model for calculating pollutant loads. This loading information, in turn, will be used at both the state and local level to guide policy and strategies for the restoration and protection of Minnesota’s waters.
This project will support the monitoring of reaches where there are data gaps, incorporate new data and relevant data, continue identification of pollutant sources, complete load duration curves, coordinate and encourage participation in stakeholder meetings. The information gathered during Phase IIB will be utilized towards the development of a Draft Restoration (TMDL) and Protection Plan (Plan).
This project will extend the simulation period for the Hydrological Simulation Program - FORTRAN (HSPF) models for the Grand Rapids, Brainerd, Crow Wing, Redeye, Long Prairie, Sartell, Sauk, St. Cloud, and Crow watersheds, and review and comment on the calibration.
Upper Mississippi, North Fork Crow River Major Watershed TMDL Project led by CROW with assistance from local partners North Fork Crow River Watershed District (WD); Middle Fork Crow River WD; Wright Soil and Water Conservation District (SWCD).
The primary goal of this project is to examine the calibration and validation of recently extended Hydrological Simulation Program – FORTRAN (HSPF) watershed models for the Mississippi River-Headwaters, Mississippi River-Grand Rapids, Mississippi River-Brainerd, Mississippi River-Sartell, Mississippi River-St. Cloud, Leech Lake, Pine River, Crow Wing River, Long Prairie River, and Redeye River watersheds and revise the calibration.
This project will conduct water chemistry monitoring at two subwatershed sites based on flow conditions and targeting runoff events. The data collected will be submitted to the Minnesota Pollution Control Agency (MPCA) and used in the FLUX32 model for calculating pollutant loads.
In 2009, residents from the Stradford Addition and the Avon Area Lakes Association (AALA) contacted the Stearns County SWCD with concerns of direct stormwater entering Middle Spunk Lake. The Stearns County SWCD met with representatives on site to assess the stormwater problems. Many areas of untreated stormwater that directly discharged into Middle Spunk Lake were identified. It was determined that the watershed areas within the Stradford addition should be retrofitted with best management practices capable of conveying and treating stormwater.
This proposal will fund technical assistance for nutrient management planning to accelerate water quality improvements with the 12-county West Central Technical Service Area (WCTSA). A needs assessment identified an estimated 156 certified nutrient management plans that will be needed over a 3 year period. Of the 71 SWCD employees in the WCTSA, only 1 SWCD staff member is dedicated to nutrient management planning. To meet technical assistance needs, this grant will fund a Regional Planning Specialist (RPS) to address local resource concerns.
The West Central Technical Service Area (WCTSA) serves 12 Soil and Water Conservation Districts (SWCDs) in west central Minnesota and has been experiencing increased workload due to greater requests from member SWCDs. This funding will sustain a limited-term technician and purchase related support equipment to assist landowners in implementing targeted, high priority practices that result in the greatest water quality outcomes.