The projects planned for the grant funds focus on essential updates and enhancements to our historic building, ensuring that we can continue to provide a safe, welcoming, and inclusive space for all who visit. The proposed improvements include upgrading our HVAC system, kitchen, and security infrastructure; rebuilding the handicap ramp for improved accessibility; sourcing new patio furniture; and resealing the venue's dance floor. Each of these initiatives is designed to maintain the integrity of our facility while enhancing the experience of our diverse audience.
This project will conduct a 2017 revision of the South Fork Crow River, North Fork Crow River and Sauk River Watershed Hydrological Simulation Program FORTRAN (HSPF) models and review of the Pine River Watershed HSPF model.
During the 2016 Legislative Session, the Minnesota State Legislature asked the Minnesota Humanities, $75,000 the first year is for a grant to the city of St. Paul or Ramsey County to develop and install activity facilities in parks for Takraw courts that are reflective of the current demographics in Ramsey County. This grant is available if the recipient provides at least a 25 percent match for funding.
This project will support a civic engagement cohort that will be offered in southwest Minnesota to foster partnering and build capacity of local government, organizations, and residents for effective civic engagement in water protection and restoration. This project will also build networks and the skill set of local resource professionals to do effective civic engagement work for water restoration and protection. The cohort will be administered through the Minnesota River Board (MRB), established in 1995 with a goal of focusing water management efforts on the local level.
This project will complete a comprehensive study, following a rational, step-wise process of data analysis, response modeling and comparison to the water quality standards, followed by impairment diagnosis, modeling of improvement and protection options, and development of a WRAP Report and Implementation Plan for Sunfish lake, Thompson lake, Pickerel lake, and Rogers lake.
This project will finalize HSPF watershed model construction by incorporating internal phosphorus loading in modeled lakes, run a suite of implementation scenarios and generate a GenScn project containing model output. The consultant will produce HSPF watershed models that can readily be used to provide information to support conventional parameter TMDLs. The consultant will deliver all modeling files for baseline and implementation scenarios and provide a GenScn project containing model output.
This project will develop an understanding for how sediment sources change over timescales of individual storm events as well as over the past two centuries. The results will be used by the larger Collaborative for Sediment Source Reduction (CISSR)-Blue Earth research group to establish a sediment budget for the Greater Blue Earth River Basin and understand the effectiveness of various potential mitigation strategies. In addition, these results can be used by MPCA and others to calibrate watershed sediment models.
This project includes project planning, coordination, stream reconnaissance, and begins the effort towards civic engagement/outreach components of the South Fork Crow River Watershed project. Phase I will focus towards the development of project teams, identifying stakeholders, developing an initial civic engagement strategic plan and conducting limited lake and stream monitoring.
This project will complete a pollutant source identification and subwatershed information report and support the development of a Draft Restoration and Protection Plan (RAPP). It will also support the devlopment of a Implementation Plan that will identify target areas for BMP implementation for bacteria reductions.
This project will complete spatial and temporal revisions , recalibration and validation of 7 watershed HSPF models. These fully functioning calibrated validated executable models will simulate hydrology, sediment (sand, silt, and clay), temperature, phosphorus, nitrogen, dissolved oxygen, biochemical oxygen demand, and algae at the 12-digit HUC subbasin scale (or finer).
The goal of this project is to develop a phosphorus TMDL for the six impaired lakes in the southwest portion of the Rice Creek Watershed District; Island Lake, Little Lake Johanna, Long Lake, East Moore Lake, Pike Lake and Lake Valentine.
The primary focus of this project is the collection of lake core samples to aid in the completion of lake TMDLs for Dean, Malardi & Fountain lakes. This work will enable completing tasks included in the North Fork Crow River Watershed Restoration & Protection Project (WRPP). Additional data collection is needed to update lake response models. This new data will provide a cohesive and comprehensive data collection for Dean, Malardi and Fountain lakes.
This project will provide the MPCA, CCWD, and all other stakeholders the information and tools necessary to improve the water quality within Coon Creek Watershed District. The improvements will take place using targeted activities throughout the watershed to reduce the primary biological and chemical stressors. In turn, the reduction of these stressors will help to reduce overall loadings of sediment, turbidity, total phosphorus, and E. coli bacteria.
This project will continue the offering of low-interest loans to citizens, some of whom may not be able to acquire funding otherwise, for upgrading 50 septic systems to ensure compliance with state rules. Grant funds will be used to administer the low-interest loan program.
This project will develop a watershed wide Total Maximum Daily Load (TMDL) study and River Eutrophication Standard (RES) TMDL report for water quality impairments in the Des Moines River basin, which includes the Des Moines River Headwaters, Lower Des Moines River, and East Fork Des Moines River watersheds.
The goal of this project is to construct, calibrate, and validate a Hydrological Simulation Program FORTRAN (HSPF) model for Minnesota portions of the Des Moines River watershed.
Construct 2.1 miles of paved trail between First Street in the City of Chaska and County Road 40 in the City of Carver on the Minnesota River Bluffs Regional Trail.
This project determines ambient background per- and polyfluoroalkyl substance (PFAS) levels in urban and non-urban soils. This information will help Minnesota develop management strategies for PFAS contaminated soils.
Carver County has identified water quality improvement of Carver, Bevens and Silver Creek as a water management priority. This project will identify storage or wetland restoration sites that are highly effective at reducing pollutant loading to downstream impaired waters using high-resolution Light Detection and Ranging (LiDAR) data and Geographic Information System (GIS) processes. The watershed landscape has been highly modified for agricultural production land development; less than 50 percent of pre-settlement wetland acres remain in Carver County.
We will determine the distribution, relative density, and spatial occupancy patterns of 3 small weasel species in Minnesota to fill key knowledge gaps in weasel distribution and status in Minnesota.
Diverse habitat is critical to sustaining quality fish populations in lakes and rivers. The Minnesota Department of Natural Resources (MNDNR) will complete six fish passage projects to restore habitat connectivity for fish and other aquatic life, and restore reaches of four different rivers, creating 24.4 miles of diverse aquatic habitat. Though the actual footprint of fish passage projects is relatively small, these projects will reconnect over 27,000 acres of lake and river habitat.
Grasslands continue to be the most threatened habitat in the state. This programmatic request will build on the DNR's history of enhancing and restoring grasslands, embedded wetlands, and oak savannas to increase wildlife populations. The Prairie Plan, Pheasant Plan, and Wildlife Action Plan will guide our efforts to ensure we are operating in a strategic and targeted manner.
We restored and enhanced a total of 40,539 grassland acres with 446 activities on Wildlife Management Areas, Scientific and Natural Areas, Native Prairie Bank easements, Waterfowl Production Areas, and National Wildlife Refuges.
Grasslands continue to be the most threatened habitat in the state. This programmatic request will build on the DNR's history of enhancing and restoring grasslands, embedded wetlands, and savannas to increase wildlife populations. The Prairie Plan, Pheasant Plan, and Wildlife Action Plan will guide our efforts and ensure we are operating in a strategic and targeted manner. This proposal will enhance and restore grasslands on parcels that are permanently protected and most open to public hunting.
Acquire approximately 325 acres of high priority habitat for designation as Wildlife Management Area or Scientific and Natural Area in the LSOHC Prairie Planning Section emphasizing Minnesota Prairie Conservation Plan and soon to be finalized Conservation That Works, 3.0 WMA and AMA Acquisition & Management Strategic Plan guidance, and coordination with partners. All lands will be open for public hunting and fishing (a limited number of SNA's are proposed for limited hunting for instance archery only or hunting but no trapping).
This project supports continuing development of County Groundwater Atlases for approximately three years. The goal is to provide this valuable water and resource management information infrastructure to every county.
DNR completed nine stream habitat projects with this appropriation. Four fish passage projects opened up access to 180 miles of river and 13,521 acres of lake and wetland habitat. We enhanced habitat on 39 Aquatic Management Areas, totalling 1440 acres, through the efforts of four positions funded by this appropriation. It also funded two stream habitat positions that oversaw the completion of 23 DNR projects and over 50 partner-lead projects funded by various OHF sources.
The following table provides a short summary of the accomplishments under this appropriation. In total, the DNR enhanced and restored 283 sites for a total of 17,087 acres.
DNR modified six dams to allow fish passage and enhanced in stream habitat on two rivers with this appropriation. Also, habitat enhancement project were completed on 28 Aquatic Management Areas and three metro parks, totaling 1,002 acres. Stream habitat work for this appropriation and LSOHC-funded projects from other appropriations was aided by funding for a stream restoration coordinator and interns. These positions aided in public outreach, survey work, design, permitting, contracting, and coordination with project partners on these complex projects.
We will use a programmatic approach to achieve prioritized aquatic habitat protection, restoration, and enhancement of lakes and streams across all the LSOHC planning regions of Minnesota.