We will assess the environmental quality of prairies across Minnesota. On-the-ground surveys and contaminant risk assessments will help inform partner management actions, endangered species recovery plans, and pollinator reintroduction efforts.
To hire a qualified historian to complete an evaluation to determine eligibility for listing in the National Register of Historic Places for the Baker House.
The Berger Fountain, known as the dandelion fountain to most, was installed in 1975 by Benjamin Berger and has been a beloved neighborhood landmark in Loring Park and a favorite location for wedding photographers and children ever since. Ben Berger was a park board commissioner and, after seeing a dandelion fountain in Australia, fundraised to build a sister fountain right here in Minnesota.
This study will leverage our current bioacoustics monitoring framework to assess avian diversity at the statewide scale through a citizen science acoustic monitoring program, with a focus on private lands.
This Total Maximum Daily Load (TMDL) project will develop a TMDL Report and Implementation Plan defining the sources contributing to the impairments and outlining the steps necessary to bring Bluff Creek back to meeting water quality standards.
This project will result in the final the Bois de Sioux River Watershed Restoration and Protection Strategies (WRAPS) report and Total Maximum Daily Load (TMDL) study. This work order will authorize the consultant to address all comments received during the public notice period and produce the final WRAPS report for the Minnesota Pollution Control Agency's final approval and a final TMDL study for United States Environmental Protection Agency's (EPA) final approval.
The United States Environmental Protection Agency (USEPA) requires the Minnesota Pollution Control Agency (MPCA) to carry out the Total Maximum Daily Load Program (TMDL) in the state of Minnesota. Minnesota has an abundance of lakes and river reaches, many of which will require a TMDL study. In an effort to expedite the completion of TMDL projects, the MPCA has decided to construct watershed models. These models have the potential to support the simultaneous development of TMDL studies for multiple listings within a cataloging unit or 8-digit Hydrologic Unit Code watershed.
This project involves the extension and update of the Hydrological Simulation Program FORTRAN (HSPF) model for the Bois de Sioux and Mustinka watersheds.
This project will address United States Environmental Protection Agency (EPA) comments on the preliminary draft Total Maximum Daily Load (TMDL) study and Minnesota Pollution Control Agency (MPCA) comments on the pre-public notice draft TMDL study and Watershed Restoration and Protection Strategy (WRAPS) report, and produce the public notice draft TMDL study and the public notice draft WRAPS report ready for public review and comment. Conduct one public meeting for each watershed to present public notice drafts of the TMDL study and WRAPS report for each watershed.
This project will develop a watershed approach plan, including impaired waters allocations, for the Mustinka Watershed, located at the headwaters of the Red River of the North, in western Minnesota, lying partly in Grant, Stevens, Ottertail, Big Stone, and Traverse counties. The watershed approach plan will set water quality goals for the watershed, recommend allocations for achieving total maximum daily loads where waters do not meet state standards and are listed as impaired.
This full-scale pilot will evaluate supercritical water oxidation (SCWO) for managing PFAS in biosolids and water treatment residuals. SCWO can destroy PFAS in a variety of wastes and recover energy.
We will partner with urban municipalities and school districts to support planting of climate-resilient tree species. Activities include planting trees, gravel bed nursery creation, tree assessment and mapping, and community.
While aspen is one of the most dominant forest types, predicted future conditions will negatively impact aspen growth. Increasing tree diversity can provide increase ecological and economic resilience.
Objective 1: By 6/30/2025, increase Full Time Teachers with at least intermediate- mid fluency from 2 to 3 at Lower Sioux Cansayapi. Objective 2: By 6/30/2025, increase Dakota fluency of (2) Early Childhood Language Nest Teachers Dakota Language to at least Intermediate Low. Objective 3: By 6/30/2025, increase language speaking at home from weekly to daily among 50 families and fluency of 20 families .5-1 level on the ACTFL fluency scale.
Objective 1: By 6/30/2025, increase Full Time Teachers with at least intermediate- mid fluency from 2 to 3 at Lower Sioux Cansayapi. Objective 2: By 6/30/2025, increase Dakota fluency of (2) Early Childhood Language Nest Teachers Dakota Language to at lea
Revitalizing the old deer yards into Caribou Yards is a transformative initiative aimed at creating habitats for a herd of caribou. The need for this project arises from the closure of the old deer yards, which were previously inhabited by white-tailed deer until the last one passed away of old age. Subsequently, the fencing surrounding these three habitats has weathered and suffered damage during the years of inoccupancy.
Pileated Woodpeckers are keystone habitat modifiers that support an array of game, non-game, and conservation concern species. Additional information is needed to understand cavity dynamics for these species.
The Children’s Museum of Southern Minnesota (CMSM) will build upon a strong foundation of Minnesota Arts, Culture and Heritage (ACH) learning experiences made possible with prior MN Legacy funding support to:
Rising temperatures and increased precipitation contribute to decreased oxygen and increased methane in Minnesota lakes and wetlands. We will identify impacts on water quality and methane emissions, providing management guidance.
The Hawk Creek - Middle Minnesota Comprehensive Watershed Management Plan identifies priority concerns, short-term and long-term goals for surface waters, groundwater, habitat and recreation, local knowledge, and land stewardship. Through the plan, specific details for structural and management practices are described in the Implementation Schedule for each of the planning regions and priority areas.