The projects planned for the grant funds focus on essential updates and enhancements to our historic building, ensuring that we can continue to provide a safe, welcoming, and inclusive space for all who visit. The proposed improvements include upgrading our HVAC system, kitchen, and security infrastructure; rebuilding the handicap ramp for improved accessibility; sourcing new patio furniture; and resealing the venue's dance floor. Each of these initiatives is designed to maintain the integrity of our facility while enhancing the experience of our diverse audience.
This project will develop a TMDL for all impaired lakes within the Crow Wing Watershed by furthering data collection in the watershed, analysis of data, allocation calculations, and introducing outreach and stakeholder participation activities.
The project will include lake monitoring on three (3) lakes found in the Rum River watershed in southeastern Crow Wing County (CWC). The project will be conducted in an effort to gain sufficient data on these data-deficient lake sites. All of the proposed monitoring sites are target sites for 2013-2014. One of the goals of the CWC Local Comprehensive Water Plan (CWP) is to establish a countywide Comprehensive Monitoring Plan (CMP).
This project will provide Stressor ID work and assistance for the development of a work plan for the Major Watershed Project. The Major Watershed Project will include a plan for civic engagement and outreach, with assistance from ten Local Government Units from the Crow Wing River Watershed.
This project will collect a complete Trophic Site Index (TSI) data set for Crow Wing County lakes and a complete data set for streams and rivers for the Intensive Monitoring Program (IMP). Crow Wing County, Cass County, Wadena County, Morrison County and Hubbard County are partnering to ensure that all target lakes and rivers within the Crow Wing River watershed are monitored efficiently.
This project will conduct a 2017 revision of the South Fork Crow River, North Fork Crow River and Sauk River Watershed Hydrological Simulation Program FORTRAN (HSPF) models and review of the Pine River Watershed HSPF model.
This first year of the project will collect available data relevant to the TMDL development, determine the data sets best suited for the TMDL development. Gain a better understanding of the watershed and impaired lakes, and assessment of all potential sources (internal and external) of the causes of lake impairment. EOR will also review the data produced by the MPCA for the impairment assessment for each of the lakes during year 1 of the project.
This project willl complete a final TMDL document that will be submitted to EPA for approval. Document will include Lake Osakis, Clifford Lake, Faille Lake, and Smith Lake impairments. A final technical memorandum describing the elements of the model framework and any deviations from the recommended construction methodology will be also be provided with the submission of the watershed models.
This project will complete a comprehensive study, following a rational, step-wise process of data analysis, response modeling and comparison to the water quality standards, followed by impairment diagnosis, modeling of improvement and protection options, and development of a WRAP Report and Implementation Plan for Sunfish lake, Thompson lake, Pickerel lake, and Rogers lake.
This project covers activities necessary to complete the major watershed restoration and projection project. The major objectives this project covers include contract administration, watershed coordination, stressor ID activities, identifying priority management zones, engage watershed citizens, and the creation of watershed restoration and protection plans.
This project will finalize HSPF watershed model construction by incorporating internal phosphorus loading in modeled lakes, run a suite of implementation scenarios and generate a GenScn project containing model output. The consultant will produce HSPF watershed models that can readily be used to provide information to support conventional parameter TMDLs. The consultant will deliver all modeling files for baseline and implementation scenarios and provide a GenScn project containing model output.
This project will complete a pollutant source identification and subwatershed information report and support the development of a Draft Restoration and Protection Plan (RAPP). It will also support the devlopment of a Implementation Plan that will identify target areas for BMP implementation for bacteria reductions.
This project will support the completion of a final draft Total Maximum Daily Load (TMDL) document for the Osakis, Smith and Faille Lakes TMDL and the submittal to EPA for final approval.
The goal of this project is to develop a phosphorus TMDL for the six impaired lakes in the southwest portion of the Rice Creek Watershed District; Island Lake, Little Lake Johanna, Long Lake, East Moore Lake, Pike Lake and Lake Valentine.
This project will provide the MPCA, CCWD, and all other stakeholders the information and tools necessary to improve the water quality within Coon Creek Watershed District. The improvements will take place using targeted activities throughout the watershed to reduce the primary biological and chemical stressors. In turn, the reduction of these stressors will help to reduce overall loadings of sediment, turbidity, total phosphorus, and E. coli bacteria.
Construction of a 6.6 mile bituminous trail along CSAH 35 connecting the cities of Dent and Vergas to the Heart of the Lakes Regional Trail and Maplewood State Park
This project determines ambient background per- and polyfluoroalkyl substance (PFAS) levels in urban and non-urban soils. This information will help Minnesota develop management strategies for PFAS contaminated soils.
We will determine the distribution, relative density, and spatial occupancy patterns of 3 small weasel species in Minnesota to fill key knowledge gaps in weasel distribution and status in Minnesota.
Minnesota's iconic northern forests, wetlands, and brushland habitats require management beyond basic forestry practices or at smaller scales than commercial operations work. Other enhancements, such as brushland shearing or mowing have low commercial value but high wildlife value. These additional habitat enhancements improve the quality of the forests for both wildlife and outdoor recreation.
Grasslands continue to be the most threatened habitat in the state. This programmatic request will build on the DNR's history of enhancing and restoring grasslands, embedded wetlands, and oak savannas to increase wildlife populations. The Prairie Plan, Pheasant Plan, and Wildlife Action Plan will guide our efforts to ensure we are operating in a strategic and targeted manner.
We restored and enhanced a total of 40,539 grassland acres with 446 activities on Wildlife Management Areas, Scientific and Natural Areas, Native Prairie Bank easements, Waterfowl Production Areas, and National Wildlife Refuges.
Grasslands continue to be the most threatened habitat in the state. This programmatic request will build on the DNR's history of enhancing and restoring grasslands, embedded wetlands, and savannas to increase wildlife populations. The Prairie Plan, Pheasant Plan, and Wildlife Action Plan will guide our efforts and ensure we are operating in a strategic and targeted manner. This proposal will enhance and restore grasslands on parcels that are permanently protected and most open to public hunting.
This project supports continuing development of County Groundwater Atlases for approximately three years. The goal is to provide this valuable water and resource management information infrastructure to every county.
With this appropriation, the DNR enhanced and restored over 11,700 acres of public lands or permanently protected private lands under easement. Projects under this appropriation included prescribed fire, prescribed or conservation grazing, woody removal, and enhancing plant diversity. With this appropriation we were able to exceed our target acreage by 38 percent.
We restored 2,081 acres of grassland and enhanced 42,425 acres of grassland for a total of 44,506 acres of wildlife habitat across 329 sites with these funds.
Minnesota's iconic northern forests, wetlands, and brushland habitats require management beyond basic forestry practices or at smaller scales than commercial operations work. Other enhancements, such as brushland shearing or mowing have low commercial value but high wildlife value. These additional habitat enhancements improve the quality of the forests for both wildlife and outdoor recreation.
Grasslands continue to be the most threatened habitat in the state. This programmatic request will build on the DNR's history of enhancing and restoring grasslands, embedded wetlands, and oak savannas to increase wildlife populations. The Prairie Plan, Pheasant Plan, and Wildlife Action Plan will guide our efforts to ensure we are operating in a strategic and targeted manner.
The Minnesota Department of Natural Resources (MNDNR) will complete six fish passage projects to reconnect reaches of habitat for fish and other aquatic life, restore 71 acres on eight rivers to create over six miles of diverse habitat, and enhance 224 acres of riparian and terrestrial habitat on Aquatic Management Areas. The footprint of fish passage projects is small, but projects will reconnect over 290,000 acres of lake and river habitat.
Minnesota's iconic forests and brushland habitats require enhancement beyond DNR timber harvest practices. Enhancements, such as brushland shearing provide critical wildlife habitat but are not achieved through timber harvest practices. These additional habitat benefits improve the quality of the forests for wildlife, water quality and outdoor recreation. DNR's Conservation Agenda, Wildlife Action Plan, Forest Action Plan, SNA Strategic Land Protection, Fish Habitat Plan, will guide habitat enhancements in this proposal to meet the objectives put forth in these plans.