This contract is a component of larger project (Snake River E.coli Microbial Source Tracking Study – Cycle II) in the Snake River Watershed located in the St. Croix river basin. The study will address microbial water quality impairments in the watershed. This study will conduct fecal bacteria source tracking using genetic markers across impaired streams in the watershed during the spring and summer months of 2021.
This project will complete a Total Maximum Daily Load (TMDL) study for the impaired reaches of the Snake River Basin. The project includes development of a Generalized Watershed Loading Function (GWLF) model for nutrient sources and Total Suspended Sediment (TSS), a spreadsheet version of a BATHTUB model of lake response for four lakes, and a bacteria source assessment. Wenck will also provide all stream channel data as a spreadsheet and locational database.
The purpose of the project is to reduce sediment and nutrient deposition in surface waters within priority areas of the watershed. A five percent reduction goal has been established in the County Local Water Management Plan and Impaired Waters project in progress. Eleven Best Management Practice (BMP) installations are planned for this project in cooperation with local landowners, Cities, Townships and Lake Associations.
The Project and Outreach Coordinator will facilitate efforts within the watershed to provide landowner support and assistance in identifying areas in need of conservation plans and best management practices. The coordinator would use the Watershed Protection and Restoration Strategy Report and county water plans to target and prioritize outreach and education to maximize water quality benefits. This will greatly multiply the number of educated landowners in the watershed and increase the number of projects implemented.
This phase of the project will complete a TMDL for the impaired reaches of the Snake River Basin. The project includes development of a Unit Area Load model for nutrient sources, a spreadsheet version of a BATHTUB lake response for four lakes, and a bacteria source assessment. Contractor will also provide all stream channel data as a spreadsheet database and in GIS.
The purpose of this project is to provide a new shared position in southeast Minnesota which will accelerate the adoption of soil health practices by leveraging the existing efforts of the National Resources Conservation Service and other organizations.
This project will connect Somali youth to their rich cultural heritage through arts and language. The Somali Youth Cultural Empowerment project will ensure youth learn their native Somali language and culture through classes taught by Somali teachers and will participate in the cultural tradition of Danta Dance. A dance group will perform at cultural events, with music performed live from previous members of the Somali supergroup, Waaberi, and thus, share Somali art culture with Minnesotans.
The Somali Language and Culture Classes Project will honor and preserve Somali culture by first, connecting Somali youth to their rich cultural heritage through arts and language classes and second, by providing a class for others in the mainstream Minnesota community to learn about Somali language and culture. This project will pilot teaching Somali language and culture through utilizing taped sessions with an in-person bi-lingual facilitator in order to allow for future sustainability.
The goal is to develop a “Basic Somali Language and Culture Class” curriculum. This course will be a tailored 20 – 30-hour training for people in the business community as well as Somali youth. Each class session with have an element of language and an element of culture.
Created and installed a permanent exhibit on the history of Princeton through historic art in the Great Northern Room of the Depot Museum in Princeton.
Develop and design a WHP webpage; Purchase and install WHP signs near major transportation corridors; Distribute educational materials to landowners and businesses in the DWSMA