The Redwood River watershed is one of the last remaining watersheds to complete Cycle I of the Watershed Restoration & Protections Strategies (WRAPS) process. The scope of this project upon completion is have two reports developed; a Watershed Restoration and Protection Strategies report and a Total Maximum Daily Load (TMDL) for the entire watershed.
In 2017 and 2018, Redwood-Cottonwood Rivers Control Area (RCRCA) will collect water chemistry samples from the 10 lakes and 24 stream sites identified in the Redwood and Cottonwood River watersheds. Six samples will be collected at 10 lakes from May through September in 2017; five samples will be collected at 5 lakes in 2018 from May through September. Eleven samples will be collected at each of the 24 stream sites following the Basic Regime in 2017. Sixteen samples at each stream site will be collected in 2017 and 2018 following the E.coli monitoring regime.
The Redwood and Cottonwood River Watersheds have been assessed and many reaches have been impaired for turbidity, bacteria, and low dissolved oxygen. This project will accelerate conservation efforts to reduce overland runoff sediment, bacteria, and nutrient loadings contributing to water quality impairments in targeted subwatersheds.
The Redwood River and Cottonwood River watersheds encompass approximately 2,020 square miles of southwestern Minnesota in the Minnesota River Basin. Land use in these watersheds is mostly agricultural and area geology makes them prone to erosion. Surface water issues within the two watersheds are a concern of local leaders. The counties and Soil and Water Conservation District leaders formed the Redwood Cottonwood Rivers Control Area (RCRCA) Joint Powers Board in 1983 to address sedimentation, water quality and quantity, and erosion issues.
In 2024 and 2025, Redwood-Cottonwood Rivers Control Area (RCRCA) will collect water chemistry samples from 3 stream sites (Crow Creek, Spring Creek and Wabasha Creek) within the Minnesota - Mankato watershed. From May through September of 2024, 11 samples will be collected from Crow Creek and 12 samples will be collected from both Spring Creek and Wabasha Creek. For 2025, 8 samples will be collected from Crow Creek and 9 samples from both Spring Creek and Wabasha Creek from May through September.
The Reinvest in Minnesota (RIM) Wetlands Partnership Phase VI protected and restored 1,391 acres of previously drained wetlands and adjacent grasslands on 15 conservation easements.
The Clean Water Fund (CWF) and Outdoor Heritage Fund (OHF) were used together to secure easements on buffer areas. 25 easements have been recorded for a total of 672.1 acres and are reported in the output tables for the final report (acre total does not include Clean Water Fund acres). The total acreage from both CWF and OHF sources for recorded easements is 1,152.4 acres. Only the OHF acres are being reported in this final report to be consistent with the approved accomplishment plan.
Under the CREP partnership with USDA, 28 easements were recorded on a total of 2,390 acres to restore previously drained wetlands and adjacent uplands. Two easements are RIM wetland easements that were required to complete wetland restoration work on an adjacent easement secured with 2018 Wetlands funding. The landowners received the RIM-Only payment rate. The easements were accomplished with local implementation done by SWCD, NRCS and FSA staff within the 54 county CREP area and leveraged federal funds for landowner payments and conservation practices.
Under the CREP partnership with USDA, 38 easements were recorded on a total of 2,732 acres to restore previously drained wetlands and adjacent uplands. One easement is a flowage easement that was required to complete wetland restoration work on an adjacent
The Clean Water Fund (CWF) and Outdoor Heritage Fund (OHF) were used together to secure easements on buffer areas. 84 easements have been recorded for a total of 1,441 acres and are reported in the output tables for the final report (acre total does not include Clean Water Fund acres). The total acreage from both CWF and OHF sources for recorded easements is 2,793.2 acres. Only the OHF acres are being reported in this final report to be consistent with the approved accomplishment plan.
RIM Wetlands - Restoring the most productive habitat in Minnesota's Prairie Pothole Region will protect and restore approximately 520 acres of previously drained wetlands and adjacent native grasslands on approximately 12 easements across the State. The Board of Water and Soil Resources (BWSR) will utilize the Reinvest in Minnesota (RIM) easement program in partnership with local Soil and Water Conservation District (SWCDs) to target, protect and restore high priority habitat. The program will utilize a ranking and selection process and be implemented locally by SWCD staff.
This program is a part of a comprehensive clean water strategy to prevent sediment and nutrients from entering our lakes, rivers, and streams; enhance fish and wildlife habitat; protect groundwater and wetlands. Specifically the Riparian Buffer Easement Program targets creating buffers on riparian lands adjacent to public waters, except wetlands. Through the Reinvest in Minnesota Program (RIM) and in partnership with Soil and Water Conservation Districts and private landowners, permanent conservation easements are purchased and buffers established.
We propose identifying hot spots of groundwater chloride pollution of surface waters due to excessive road salt use, which is a long term source increasing chloride impairment of surface waters.
The purpose of the project is to collect data to represent the ambient condition of the lakes and streams of the Rum River Watershed within Mille Lacs, Isanti and Sherburne Counties that is needed to determine if thresholds set to protect designeated uses, such as aquatic recreation and aquatic life, are being met .
This project will gather watershed data necessary for the development of a Watershed Restoration and Protection Strategy with parameter-specific targets that will maintain or improve water quality in the Rum River Watershed. Local Partners will lead various portions of this project and a hired onsultant will be subcontracted to write selected TMDL protection plans.
This project will focus on Watershed Restoration and Protetion Strategy (WRAPS) and Total Maximum Daily Load (TMDL) report development for the Rum River Watershed, which includes Mille Lacs Lake (the second largest lake in Minnesota) and the Rum River of which Mille Lacs Lake is the headwaters. The project will produce a plan that partners and citizens will be able to implement, a framework for citizen engagement, and a set of watershed management activities that will achieve water quality standards for all impairments within the watershed.
Scientific and Natural Area (SNA) strategic acquisition (~85 acres) will conserve Minnesota's most unique places and rare species for everyone's benefit.
This education project will continue building the next generation of conservationists in Minnesota by engaging youths and adults in science and outdoor learning through radio, podcasts, newsletters and schoolyard exploration.
The goal of this project is the continued development of an overall strategy for reduction of turbidity/TSS, with sets of sediment reduction initiatives and actions for various sources, to address the Minnesota River Turbidity TMDL and the South Metro Mississippi River TSS TMDL. The overall strategy will be used to help establish a path towards achieving the required reductions of turbidity/TSS.
The Seven Mile Creek Condition Monitoring project will maintain and build on the continuous flow and water quality data base at three stream sites and one county tile in the Seven Mile Creek watershed through the collection of approximately eighty five water samples per monitoring season in preparation for the Middle Minnesota Intensive Watershed Monitoring scheduled to begin in 2013.
Funding through this appropriation enhanced 4,745 acres of wetland habitat. Four wetland/shallow lake infrastructure projects were competed that enhanced 1,020 acres and and another project restored 50 acres. Wetland management actions (wild rice seeding, a significant drawdown, and a major large prescribed burn) enhanced 1,997 acres. Work by the Region 3 Roving Habitat Crew enhanced 1,678 wetland acres through work on prescribed burns, drawdowns, herbicide applications, and removal of woody vegetation.
State leadership for the 4-H Shooting Sports & Wildlife Program, including staff and 4-H volunteer committee members, will provide a menu of equipment options for local programs to choose from as a means to build their Shooting Sports & Wildlife project. Local programs will submit a grant application justifying how the new equipment will help them build and grow their program, attract and engage new audiences, and provide sustainability in their local chapter.