Otter Tail County will partner with the Buffalo-Red River Watershed District and the West Otter Tail and Wilkin SWCDs to stabilize the outlet of Judicial Ditch No. 2 which has become the most critically eroding gully contributing sediment to the Otter Tail River. When stabilized, sediment to the river will be reduced by 988 tons per year, and total phosphorus will be reduced by 840 pounds per year. The sediment reduction associated with this project is 7 percent of the 6,868 tons per year goal set by the Lower Otter Tail River Total Maximum Daily Load.
Lake Seven is located in Otter Tail County and is a waterbody of statewide significance, often leading the north central hardwoods forest ecoregion in water clarity. Lake Seven has also been identified by DNR Fisheries staff as one of 77 refuge lakes with the potential to maintain tulibee populations into the future given sufficent watershed protection and the only one in Otter Tail County.
The goal of this project is to finalize the Lake Pepin Watershed phosphorus total maximum daily load (TMDL) report by using the existing information and documentation prepared under previous contracts to prepare one TMDL report that addresses the impairments on the mainstem of the Mississippi River. Information developed to date for draft TMDLs on the Minnesota River mainstem will be documented for later use by the Minnesota Pollution Control Agency.
This project will complete data collection on 11 lakes over a 2 year period in the Pomme de Terre Watershed. The data collected will be be used in the Major Watershed Project proposed for this watershed.
The goal of this project is to support the Minnesota Pollution Control Agency (MPCA) in responding to public comments on the Lake Pepin Watershed Phosphorus Total Maximum Daily Loads (TMDLs), which were prepared by LimnoTech under previous phases of the project.
Phase 4 of the Lake Winona Total Maximum Daily Load (TMDL) project will finalize the draft Lake Winona TMDL, dated November 2009, by completing additional data analysis, lake quality modeling, updating the TMDL report, and supporting the public involvement process.
Prior to urban development, Lake Alice in Fergus Falls supported a diverse array of vegetation and wildlife. Presently, stormwater enters the lake at the heart of the city through two major storm sewers, resulting in excessive phosphorus, sediment loading, cyanobacteria, and fecal coliform in receiving waters. This project, to be performed by the City of Fergus Falls in FY25, will remove the primary source of phosphorus and total suspended solids through the addition of sediment traps and updated catch basins in the stormwater system flow.
This project is a fall 2024 exhibition of art created by self-identifying Latina women and non-binary, Latinx Minnesota-based artists with ancestral roots in Latin America. The exhibition is being co-curated by local visual artist, community muralist and educator, Zamara Cyan, and William Gustavo Franklin, an independent art curator, educator and author of the recent volume, Latin Art in Minnesota Conversations and What's Next (Afton Press, 2023).
Watershed based implementation funds will be used to target conservation practices utilizing the principles associated with Prioritize, Target and Measure as referenced in our Local Comprehensive Watershed Management Plan. The following are projects/practices, and their associated pollution reduction estimates, that are included in this budget request: (500 acres of Nonstructural BMPs) to protect/improve land management and reduce bacteria will reduce phosphorus by 65 lbs/yr, nitrogen by 520 lbs/yr, and sediment by 285 tons/yr.