This project will fully fund three Nonpoint Engineering Assistance (NPEA) Joint Powers Board positions in cooperation with the NPEA Base Funding anticipated at $130,000 per year. This will allow a 2nd Professional Engineer to be retained in addition to a Lead Engineer and Technician. This 'accelerated' engineering previously was funded with BWSR Challenge Grants, and an EPA319 grant with corresponding BWSR CWF Matching Grant to handle the high workload associated with the large number of BWSR feedlot cost-share projects approved in South East Minnesota.
This project will extend two Feedlot Technical positions initially created and funded by a FY2011 CWF Feedlot Water Quality Grant that assess and help fix animal waste runoff from small feedlots. The technicians will work with and under the Technical Authority and priorities of the South East Soil and Water Conservation District Tech Support JPB lead Engineer. This project will enable more projects to be constructed resulting in a reduction of nitrogen, phosphorus and fecal coliform runoff into surface and ground water in South East Minnesota and the Mississippi River.
This project will accelerate production of County Geologic Atlases (part A). An atlas is a set of geologic maps and associated databases for a county that facilitate informed management of natural resources, especially water and minerals.
This project will improve surface and groundwater quality in the rural sections of the Vermillion and North Cannon River Watersheds located in Dakota County through the installation of targeted structural and vegetative conservation practices. This project will leverage local and federal funds to provide technical and financial assistance to landowners that install agricultural water quality practices.
At 410 acres, Lake Owasso is the largest lake in the Grass Lake Water Management Organization (GLWMO) and one of the most pristine. Maintaining the lakes water quality is a priority for the GLWMO. A long urbanized area along Aladdin Street in Roseville currently lacks stormwater features to remove pollutants and reduce water volume. The rainwater from this area drains directly to a wetland which is hydrologically connected to Lake Owasso. Adjacent to the residential area is a 0.5 acre parking lot which drains into a ditch which eventually enters the same wetland.
This project will complete the installation of four nested wells to the Ambient Groundwater Monitoring Network and relocated one well in the City of Saint Paul. Braun Intertec will coordinate site access and oversee the well installation by a state drilling contractor.
Peer Engineering, Inc. (Peer) will evaluate and recommend to MPCA groundwater monitoring staff prospective sites/locations for the installation of groundwater monitoring wells to evaluate contaminant/pollutant concentrations from various sources. Peer will oversee the installation of monitoring wells by retaining a state drilling contractor or preparing bid documents to retain well driller through the Department of Administration. Superfund staff will assist in the project by providing oversight of contractual requirements and provide technical assistance as needed.
This project will be a complete TMDL report for the Biota and Bacteria (E. coli) impairments for the Ann River Watershed. The water bodies associated with these impairments will then be removed from the MPCA’s impaired waters list, and implementation activities to restore the water bodies will begin.
A direct appropriation of $400,000 in FY 2010 for the Anoka Conservation District (ACD) is for the metropolitan landscape restoration program for water quality and improvement projects in the seven-county metro area (the law also provides $600,000 for this purpose in FY2011).
A direct appropriation of $400,000 in FY 2010 and $600,000 in FY2011 for the Anoka Conservation District (ACD) is for the metropolitan landscape restoration program for water quality and improvement projects in the seven-county metro area.
This project is studying the response of certain aquifers to groundwater pumping. Research involves an aquifer test, which is an experiment where a well is pumped at a known, constant, pumping rate; changes in groundwater levels and stream flows in the areas around the aquifer test site are observed while the well is being pumped. These tests help us understand how groundwater flows between aquifers, which are underground rock and sand layers that hold water.
This project will use the We Are Water MN traveling exhibit and the Minnesota Humanities Center's approach to community engagement, relationship building, and storytelling, to increase community capacity for sustainable watershed management in six Minnesota watersheds.
The goal of this project is to use the We Are Water MN exhibit and their technical knowledge in relationship-building and storytelling to increase community capacity for sustainable watershed management in the Cannon River, Cedar River, Mississippi-Headwaters, Mississippi-Grand Rapids, Mississippi-Twin Cities, Red Lake River, Rum River and St. Louis River watersheds.
This project will use the We Are Water MN traveling exhibit and the Minnesota Humanities Center's approach to community engagement, relationship building, and storytelling, to increase community capacity for sustainable watershed management in five Minnesota watersheds. The following communities were selected as host sites for this project:
Winona (City of Winona), active hosting period: March 3-April 25, 2022
Lake City (Lake Pepin Legacy Alliance), active hosting period: April 28-June 20, 2022
South Central Technical Service Area (SCTSA) will use this Clean Water Fund grant to provide Soil and Water Conservation Districts and other local organizations in its eleven-county area with a Geographic Information System (GIS) Technician to assist in using available GIS information to target specific locations where Best Management Practices (BMPs) can be installed to help improve water quality.
This project will provide condition monitoring and problem investigation monitoring at the following sites.
Mississippi River: Tributaries include Bassett Creek, Cannon River, Crow River, and Minnehaha Creek.
Minnesota River: Tributaries include Eagle Creek,Riley Creek, and Valley Creek tributary to the St. Croix River
The Rice Creek Watershed District (RCWD) is proposing to improve the water quality of stormwater runoff to Bald Eagle Lake through installation of a new wet pond and iron-enhanced sand filter (IESF) on Ramsey County Ditch #11. In partnership with White Bear Township, this project will remove approximately 43 pounds of phosphorus from runoff annually and builds upon the extensive work undertaken by the RCWD to improve water quality in Bald Eagle Lake.
This project will support updates to the Draft Bald Eagle Lake TMDL. The updates will address comments received during the public comment period. The comments resulted in the development of individual Wasteload Allocations for stormwater sources in the Bald Eagle Lake watershed.