2024 Le Sueur River Watershed WBIF
The Le Sueur River Comprehensive Watershed Management Plan (LSRCWMP) is a unifying strategy for water management in the Le Sueur River Watershed (LSRW). The LSRCWMP focuses on restoring impaired waters and habitats, protecting high quality lakes, reducing peak flows through water storage, and protecting groundwater quality through resource management. The LSWCWMP was developed according to the State's One Watershed, One Plan program, approved by the Minnesota Board of Water and Soil Resources (BWSR) on August 24, 2023, and adopted by the Le Sueur River Policy Advisory Committee (LSRPAC) on October 27, 2023.
The LSRCWMP will direct activities within the LSRW over the next ten years (2024-2034). This policy should be reviewed every two years, and may be altered at any time, pending review and approval by the LSRPAC. The policy establishes an administrative process and funding limits when LSRW funds are provided to landowners, or land occupiers, for the installation of projects and practices.
Annie Felix-Gerth
(a) $39,500,000 the first year and $39,500,000 the second year are for grants to implement state-approved watershed-based plans. The grants may be used to implement projects or programs that protect, enhance, and restore surface PreviouswaterNext quality in lakes, rivers, and streams; protect groundwater from degradation; and protect drinking PreviouswaterNext sources. Projects must be identified in a comprehensive watershed plan developed under the One Watershed, One Plan program and seven-county metropolitan groundwater or surface PreviouswaterNext management frameworks as provided for in Minnesota Statutes, chapters 103B, 103C, 103D, and 114D. Grant recipients must identify a nonstate match and may use other legacy funds to supplement projects funded under this paragraph. This appropriation may be used for: (1) implementing state-approved plans, including within the following watershed planning areas (see Chapter 40 Article 2 Section 6(a) (2) for the list of watershed planning areas: seven-county metropolitan groundwater or surface PreviouswaterNext management frameworks; and(3) other comprehensive watershed management plan planning areas that have a board-approved and local-government-adopted plan as authorized in Minnesota Statutes, section 103B.801. The board must establish eligibility criteria and determine whether a planning area is ready to proceed and has the nonstate match committed.
Implement programs and practices per the plan for estimated reductions of 200.94 tons/yr of TSS, 1,123.71 lbs/yr TP, and 20,415.97 lbs/yr of TN will be achieved. Reductions calculated using Watershed Pollutant Load Reduction Calculator.
LOCAL LEVERAGED FUNDS