Granite rock outcrops along the Upper Minnesota River are among the oldest exposed rock in North America, dating back approximately 3.6 billion years. These outcrops are also home to rare and specialized plant and animal communities rarely found elsewhere in Minnesota, including several types of cactus and one of Minnesota's only three lizard species, the five-lined skink. However, these rock outcrops are increasingly threatened by mining, overgrazing, and development.
Private wells provide drinking water for the rural residents of Lac qui Parle County. This project will retrofit 35 well pits allowing the homeowner to continue using a serviceable well while safeguarding the source of their drinking water. Well pits, which are similar to a below-ground cistern, were once a common practice to prevent freezing in the winter. Many of these pits remain in use today. However, well pits are subject to flooding, especially if they are located in a floodplain. Flooding can contaminate the well and groundwater with bacteria from unknown sources.
This grant application will focus on the construction of multiple targeted best management practices (BMPs) in priority areas which will provide measurable reductions in sediment and phosphorus loadings to cold water streams in the Mississippi River/Lake Pepin Watershed. The installation of these BMPs will also protect the existing stream habitat by reducing peak flows and reduced streambank erosion.
We will characterize environmental drivers contributing to the decline of wild rice using lake sediment cores to reconstruct historical wild rice abundance in relation to lake and watershed stressors.
This project leverages more than $10 million in federal funds to begin implementation of a system-wide effort to improve game fish and waterfowl production in the Upper Mississippi River by improving 100 acres of floodplain forest and up to 1,000 acres of aquatic and wetland habitat at the upper end of Lake Pepin. Local partners are working with the U.S. Army Corps of Engineers to mitigate habitat degradation caused by turbidity and excess sediment accumulating at the head of the lake. Project construction is anticipated to begin in 2020.
The Clean Water Fund (CWF) and Outdoor Heritage Fund (OHF) were used together to secure easements on buffer areas. 84 easements have been recorded for a total of 1,441 acres and are reported in the output tables for the final report (acre total does not include Clean Water Fund acres). The total acreage from both CWF and OHF sources for recorded easements is 2,793.2 acres. Only the OHF acres are being reported in this final report to be consistent with the approved accomplishment plan.
We propose identifying hot spots of groundwater chloride pollution of surface waters due to excessive road salt use, which is a long term source increasing chloride impairment of surface waters.
To hire qualified technicians to upgrade the heating, ventilating, and air conditioning (HVAC) system at St. Rose of Lima, listed in the National Register of Historic Places.
To contract with qualified professionals to prepare construction documents for ADA improvements at St. Rose of Lima, listed in the National Register of Historic Places.