After completing the One Watershed One Plan planning process for the Kettle & Upper St. Croix Watershed, and having the Kettle & Upper St. Croix Comprehensive Watershed Management Plan (KUSC CWMP) approved by BWSR, the local partners of the watershed will use the implementation funds to complete the actions in the plan. These actions will help complete the 10-year goals that are laid out in the plan. This in turn will help protect and restore water and soil resources in the Kettle & Upper St. Croix watersheds.
The goal of this project is to reduce peak stormwater flow discharge, sediment and phosphorus from directly entering Lake Pepin by installing two stormwater infiltration basins treating a total of 15.8 acres of developed residential and commercial area in Lake City in conjunction with the Highway 61 road reconstruction project scheduled for 2020 reducing total phosphorus by 13 pounds per year and sediment by 2 tons per year.
The purpose of this project is to continue supporting the Minnesota Pollution Control Agency in responding to public comments on the Lake Pepin Watershed Phosphorus Total Maximum Daily Load (TMDL) study, which was prepared by LimnoTech under previous work orders.
The consultant LimnoTech will support response to Total Maximum Daily Load (TMDL) comments the peer review process, United States Environmental Protection Agency and public notice. They will then revise the TMDL document as needed and attend internal and external project meetings.
The goal of this project is to finalize the Lake Pepin Watershed phosphorus total maximum daily load (TMDL) report by using the existing information and documentation prepared under previous contracts to prepare one TMDL report that addresses the impairments on the mainstem of the Mississippi River. Information developed to date for draft TMDLs on the Minnesota River mainstem will be documented for later use by the Minnesota Pollution Control Agency.
The goal of this project is to support the Minnesota Pollution Control Agency (MPCA) in responding to public comments on the Lake Pepin Watershed Phosphorus Total Maximum Daily Loads (TMDLs), which were prepared by LimnoTech under previous phases of the project.
The goal of this project is to prepare a draft Lake Pepin Total Maximum Daily Load (TMDL) Report. Lake Pepin is impaired by high levels of nutrients that cause excessive growth of algae.
The goal of this project is to finalize the draft Lake Pepin Total Maximum Daily Load (TMDL) Report, issue it for public comment, address comments, and finalize the report. Lake Pepin is impaired by high levels of nutrients that cause excessive growth of algae. High levels of sediment, carried in by major river systems, also affect the lake. The sediment is filling in the lake at a much faster rate than before Minnesota was settled and intensely farmed. Nutrients and sediment are distinct yet inter-related pollutants, and are being addressed in separate TMDL reports.
The Bay City Lake Pepin restoration project broke ground in May of 2023. Lake Pepin Legacy Alliance (LPLA), in partnership with the U.S. Army Corps of Engineers (USACE) and several other local partners, has raised over $1 million to support the 35% local cost share portion of the project. What is often missing from USACE projects is outreach and community engagement, this is another gap LPLA hopes to fill. Three boat tours are planned in August, with a naturalist on board to provide a view and information on Lake Pepin successes and concerns, and the restoration project.
The purpose of this project is to gain additional information about the amount of phosphorous flowing into Lake St Croix by implementing additional water quality monitoring and/or to reduce the amount of phosphorous entering Lake St Croix by the implementation of projects that will reduce phosphorus loadings. The St. Croix River Association (SCRA) will coordinate with a subgroup of the St. Croix Basin Water Resources Planning Team and other local resource experts on the identification and funding of comprehensive water monitoring and phosphorus reduction activities in the Lake St.
To hire qualified professionals to create drawings and specifications for Kanabec County Historical Society's heating, ventilating, and air conditioning (HVAC) system upgrade.
As a strategic document, the Legacy Strategic Agenda (LSA) has four goals that build on achievements realized during the first five years of Legacy funding. Over the next four years, the LSA strategic priorities in education, grants, partnerships and unfamiliar stories will be acted on, measured and sustained at the community level. A dedicated LSA Collaborative representing a cross-section of the history community meets quarterly around the state to guide the work of LSA Priority Action Teams and to share successes.