This project will fully fund three Nonpoint Engineering Assistance (NPEA) Joint Powers Board positions in cooperation with the NPEA Base Funding anticipated at $130,000 per year. This will allow a 2nd Professional Engineer to be retained in addition to a Lead Engineer and Technician. This 'accelerated' engineering previously was funded with BWSR Challenge Grants, and an EPA319 grant with corresponding BWSR CWF Matching Grant to handle the high workload associated with the large number of BWSR feedlot cost-share projects approved in South East Minnesota.
This project will extend two Feedlot Technical positions initially created and funded by a FY2011 CWF Feedlot Water Quality Grant that assess and help fix animal waste runoff from small feedlots. The technicians will work with and under the Technical Authority and priorities of the South East Soil and Water Conservation District Tech Support JPB lead Engineer. This project will enable more projects to be constructed resulting in a reduction of nitrogen, phosphorus and fecal coliform runoff into surface and ground water in South East Minnesota and the Mississippi River.
This project will accelerate production of County Geologic Atlases (part A). An atlas is a set of geologic maps and associated databases for a county that facilitate informed management of natural resources, especially water and minerals.
At 410 acres, Lake Owasso is the largest lake in the Grass Lake Water Management Organization (GLWMO) and one of the most pristine. Maintaining the lakes water quality is a priority for the GLWMO. A long urbanized area along Aladdin Street in Roseville currently lacks stormwater features to remove pollutants and reduce water volume. The rainwater from this area drains directly to a wetland which is hydrologically connected to Lake Owasso. Adjacent to the residential area is a 0.5 acre parking lot which drains into a ditch which eventually enters the same wetland.
This project will complete the installation of four nested wells to the Ambient Groundwater Monitoring Network and relocated one well in the City of Saint Paul. Braun Intertec will coordinate site access and oversee the well installation by a state drilling contractor.
Peer Engineering, Inc. (Peer) will evaluate and recommend to MPCA groundwater monitoring staff prospective sites/locations for the installation of groundwater monitoring wells to evaluate contaminant/pollutant concentrations from various sources. Peer will oversee the installation of monitoring wells by retaining a state drilling contractor or preparing bid documents to retain well driller through the Department of Administration. Superfund staff will assist in the project by providing oversight of contractual requirements and provide technical assistance as needed.
This project will be a complete TMDL report for the Biota and Bacteria (E. coli) impairments for the Ann River Watershed. The water bodies associated with these impairments will then be removed from the MPCA’s impaired waters list, and implementation activities to restore the water bodies will begin.
A direct appropriation of $400,000 in FY 2010 for the Anoka Conservation District (ACD) is for the metropolitan landscape restoration program for water quality and improvement projects in the seven-county metro area (the law also provides $600,000 for this purpose in FY2011).
A direct appropriation of $400,000 in FY 2010 and $600,000 in FY2011 for the Anoka Conservation District (ACD) is for the metropolitan landscape restoration program for water quality and improvement projects in the seven-county metro area.
This project will use the We Are Water MN traveling exhibit and the Minnesota Humanities Center's approach to community engagement, relationship building, and storytelling, to increase community capacity for sustainable watershed management in six Minnesota watersheds.
The goal of this project is to use the We Are Water MN exhibit and their technical knowledge in relationship-building and storytelling to increase community capacity for sustainable watershed management in the Cannon River, Cedar River, Mississippi-Headwaters, Mississippi-Grand Rapids, Mississippi-Twin Cities, Red Lake River, Rum River and St. Louis River watersheds.
This project will use the We Are Water MN traveling exhibit and the Minnesota Humanities Center's approach to community engagement, relationship building, and storytelling, to increase community capacity for sustainable watershed management in five Minnesota watersheds. The following communities were selected as host sites for this project:
Winona (City of Winona), active hosting period: March 3-April 25, 2022
Lake City (Lake Pepin Legacy Alliance), active hosting period: April 28-June 20, 2022
South Central Technical Service Area (SCTSA) will use this Clean Water Fund grant to provide Soil and Water Conservation Districts and other local organizations in its eleven-county area with a Geographic Information System (GIS) Technician to assist in using available GIS information to target specific locations where Best Management Practices (BMPs) can be installed to help improve water quality.
This project will provide condition monitoring and problem investigation monitoring at the following sites.
Mississippi River: Tributaries include Bassett Creek, Cannon River, Crow River, and Minnehaha Creek.
Minnesota River: Tributaries include Eagle Creek,Riley Creek, and Valley Creek tributary to the St. Croix River
The Rice Creek Watershed District (RCWD) is proposing to improve the water quality of stormwater runoff to Bald Eagle Lake through installation of a new wet pond and iron-enhanced sand filter (IESF) on Ramsey County Ditch #11. In partnership with White Bear Township, this project will remove approximately 43 pounds of phosphorus from runoff annually and builds upon the extensive work undertaken by the RCWD to improve water quality in Bald Eagle Lake.
This project will support updates to the Draft Bald Eagle Lake TMDL. The updates will address comments received during the public comment period. The comments resulted in the development of individual Wasteload Allocations for stormwater sources in the Bald Eagle Lake watershed.
The Board of Water and Soil Resources is required to contract with the Conservation Corps of Minnesota and Iowa (formerly Minnesota Conservation Corps), or CCMI, for installation of conservation practices benefitting water quality for at least $500,000 in each year of the 2010-11 biennium.
The Plymouth Creek Restoration Project will improve water quality in Plymouth Creek and Medicine Lake, the creek's primary receiving water. The project will reduce total phosphorus and suspended sediment in Plymouth Creek and Medicine Lake stemming from streambank erosion. Streambank erosion is a common source of pollution, particularly in developed landscapes where flows in streams are considered flashy and can easily scour unprotected and disturbed streambanks.
This project engages private property owners including non-profits, businesses, and institutions, in the Harrison Neighborhood of Near North Minneapolis to install storm water best management practices. The BMPs will reduce pollution in Bassett Creek including chlorides and bacteria, for which the creek is impaired. The primary focus is on Glenwood Avenue, a focal point in the community and a highly impervious area.
Installation of a 43,000 sf infiltration gallery in Becker Park in the City of Crystal to infiltrate 0.5 inches of runoff from a 147 acre currently untreated mixed use subwatershed with 51% impervious surface. The project will reduce total phosphorus to Impaired Water Upper Twin Lake by 118 pounds annually, and reduce street flooding on Bass Lake Road (Hennepin County Road 10).
The goal of this project is to facilitate strategic networking, relationships, and learning in targeted groups to assess, build, and leverage community capacity (i.e. community resources and values) to increase knowledge of the Blue Earth River watershed’s water resources and increase best management practice (BMP) adoption to restore and protect water quality in the Blue Earth River watershed. Additional goals include providing information that is readily available to the general public for updates on Watershed Approach work in the Blue Earth River watershed.
The goal of this project is to develop and write the Watershed Restoration and Protection Strategy (WRAPS) report for the Blue Earth River Watershed to provide restoration strategies to improve water quality for impaired waters and protection strategies to maintain the quality of water for water bodies meeting standards.
In South Minneapolis, the water quality of Diamond Lake has suffered in recent decades. In fact, the Minnehaha Creek Watershed District's (MCWD) analysis of water testing results designated the water quality grade as F. This is largely a result of water that rolls off roofs, yards, and streets in the 690-acreDiamond Lake watershed and ends up in the lake - bringing pollutants, debris and dirt with it.
This project will utilize a systematic approach to identify principal sources, or “hot-spots”, of sediment contributions and work with individual landowners, county drainage officials, and municipalities to coordinate and implement critical Best Management Practices (BMP’s), establish demonstration sites, and provide education and outreach efforts. This project will also establish baseline watershed data with the addition of site specific information, and determine high priority watersheds. Appropriate practices will be identified and mapped utilizing GPS and GIS equipment and software.
The goal is to facilitate strategic networking, learning, and implementation in targeted groups to assess, build, and leverage community capacity (i.e. community resources and values) to increase best management practice (BMP) adoption to restore and protect water quality in the Blue Earth River watershed
Seminary Fen, a 600-acre complex in Carver County, supports one of only 500 calcareous fens in the world and is one of the highest quality calcareous fens in southern Minnesota. The Fen feeds Assumption Creek; one of the metro area's last known trout streams that supports naturally reproducing native brook trout. Assumption Creek then discharges to the nearby Minnesota River. The Fen's unique hydrology, soils, plants, and habitats are highly sensitive to water quality and sedimentation stress.
This Total Maximum Daily Load (TMDL) project will develop a TMDL Report and Implementation Plan defining the sources contributing to the impairments and outlining the steps necessary to bring Bluff Creek back to meeting water quality standards.
This project will develop a Final TMDL report and Implementation Plan for the Bluff Creek Watershed. The main outcomes of this project are the development of a Final TMDL Report approved by MPCA and EPA and a Final Implementation Plan approved by MPCA.