We will compile all available data for Minnesota Trumpeter Swans and use these sources to model historical population abundance and predict future population dynamics.
Funding supports an Irrigation Specialist to develop guidance and provide education on irrigation and nitrogenbest management practices (BMPs). In this position, Dr. Vasu Sharma provides direct support to irrigators onissues of irrigation scheduling and soil water monitoring. She is collaborating on the development of new irrigationscheduling tools that help irrigators manage water and nitrogen resources more precisely. These tools help reducenitrogen leaching losses in irrigated cropping systems.
This project sustains momentum from the pilot project funded previously by the ENRTF for growing environmental education opportunities for learners from outside of Austin.
The Kairos Alive! Cultural Wisdom Immersion and Sharing Project collaborates with Centro Tyrone Guzman, Augustana Open Circle, Walker West Music Academy and outstate Developmental Achievement Centers to explore and exchange joyful cultural meaning through music, dance, song and story via 2-way Zoom webcast. Project explores cultural heritage and identity expression, and how it relates to the universality of human experience, in an environment of creative safety and intercultural exchange.
The purpose of this project is to continue supporting the Minnesota Pollution Control Agency in responding to public comments on the Lake Pepin Watershed Phosphorus Total Maximum Daily Load (TMDL) study, which was prepared by LimnoTech under previous work orders.
The consultant LimnoTech will support response to Total Maximum Daily Load (TMDL) comments the peer review process, United States Environmental Protection Agency and public notice. They will then revise the TMDL document as needed and attend internal and external project meetings.
The goal of this project is to finalize the Lake Pepin Watershed phosphorus total maximum daily load (TMDL) report by using the existing information and documentation prepared under previous contracts to prepare one TMDL report that addresses the impairments on the mainstem of the Mississippi River. Information developed to date for draft TMDLs on the Minnesota River mainstem will be documented for later use by the Minnesota Pollution Control Agency.
The goal of this project is to support the Minnesota Pollution Control Agency (MPCA) in responding to public comments on the Lake Pepin Watershed Phosphorus Total Maximum Daily Loads (TMDLs), which were prepared by LimnoTech under previous phases of the project.
The goal of this project is to prepare a draft Lake Pepin Total Maximum Daily Load (TMDL) Report. Lake Pepin is impaired by high levels of nutrients that cause excessive growth of algae.
The goal of this project is to finalize the draft Lake Pepin Total Maximum Daily Load (TMDL) Report, issue it for public comment, address comments, and finalize the report. Lake Pepin is impaired by high levels of nutrients that cause excessive growth of algae. High levels of sediment, carried in by major river systems, also affect the lake. The sediment is filling in the lake at a much faster rate than before Minnesota was settled and intensely farmed. Nutrients and sediment are distinct yet inter-related pollutants, and are being addressed in separate TMDL reports.
Lanesboro Arts will launch the Equitable Systems Change project for the Lanesboro Arts Gallery as a commitment to a thorough review and change of current systems and processes, based on detailed recommendations to align practices with equity values and more deeply serve BIPOC and LGBTQIA+ artists.
Provide approximately 15 matching grants for local parks, trail, acquisition of natural areas and trails to connect people safety to desirable community locations and regional or state facilities.
The Lower Mississippi River Feedlot Management in MN project will be leveraging State funding from BWSR to provide match for a United States Department of Agriculture Natural Resources Conservation Service (USDA-NRCS) Regional Conservations Partners Program (RCPP). BWSR will provide technical and financial assistance to plan and design projects to mitigate feedlot runoff from smaller (less than 300 animal units or AUs*), open lot feedlots in southeastern Minnesota.
This funding resulted in permanent protection of three strategically located parcels totaling 125 acres. Funding was used to protect high priority parcels within the Lower Root and Lower Zumbro River floodplains. This was part of a broad partnership working to improve habitat quality and connectivity in critical areas along the Mississippi River corridor. Two of the three parcels acquired are now being managed as State Forests (SFT), while the third parcel is being managed as a Wildlife Management Area (WMA).
Leveraging new statewide climate data, we will assess future change in the duration, frequency and magnitude of heavy precipitation and drought events and engage communities to prepare for these extremes.
The ENRTF grant will introduce 12 young people to conservation careers through full-time, paid internships and apprenticeships on the Minnesota Valley National Wildlife Refuge (16 FTEs over 2 years).
Expanding waste diversion practices across the state this project will: create 16 jobs, reduce greenhouse gas emissions, provide data to measure the social, economic, and environmental benefits of waste diversion.