A direct appropriation of $400,000 in FY 2010 and $600,000 in FY2011 for the Anoka Conservation District (ACD) is for the metropolitan landscape restoration program for water quality and improvement projects in the seven-county metro area.
The Washington Conservation District (WCD), Washington County, and South Washington Watershed District (SWWD) are partnering to retrofit water quality improvement practices at the Oakdale Library. The goal is clean water and the project will work toward the 101 pound phosphorus load reduction target for Armstrong Lake identified in the SWWD Watershed Plan. The project will also benefit Wilmes Lake, which is downstream from Armstrong and is impaired by excess nutrients.
This Total Maximum Daily Load (TMDL) project will develop a TMDL Report and Implementation Plan defining the sources contributing to the impairments and outlining the steps necessary to bring Bluff Creek back to meeting water quality standards.
This project will develop a Final TMDL report and Implementation Plan for the Bluff Creek Watershed. The main outcomes of this project are the development of a Final TMDL Report approved by MPCA and EPA and a Final Implementation Plan approved by MPCA.
This project will develop a watershed approach plan, including impaired waters allocations, for the Mustinka Watershed, located at the headwaters of the Red River of the North, in western Minnesota, lying partly in Grant, Stevens, Ottertail, Big Stone, and Traverse counties. The watershed approach plan will set water quality goals for the watershed, recommend allocations for achieving total maximum daily loads where waters do not meet state standards and are listed as impaired.
Brown's Creek is the namesake of Brown's Creek Watershed District (BCWD) and a designated metro trout stream. But in recent years the stream hasn't been home to as many trout and cold-water insects as we would hope. The creek is too warm and too muddy.
This project will complete a comprehensive and sustainable Major Watershed Restoration and Protection Strategies report for the Chippewa River, its tributary streams, and the many lakes in the Chippewa River watershed that is understandable and adoptable by local units of government and residents.
The Contractor will assist in planning and executing the regular meetings of the St. Croix River Basin Team, including providing minutes of the meetings. Assist in the functioning of the priority issue subcommittees. Respond to public notices for re-issuances of NPDES permits, EAWs and other pertinent public notices, and participate in prioritized public meetings with local governmental units and water planning organizations.
This project Phase will collect data, background information, and watershed characteristics within the Red Lake River watershed. This information will be documented within the framework of early draft TMDL Reports (with background information, but no load calculations) for impaired reaches within this watershed and early draft protection plans for the areas in the watershed that are not currently impaired.
This project will complete an implementation plan, as required by the Minnesota Pollution Control Agency, for the Zumbro River turbidity TMDL project. It will also revise the Zumbro River Watershed Management Plan (completed 2007) to ensure it continues to reflect local needs, incorporates new information, and develops more effective linkages with related local, state and federal government programs.
This project will Install buffer strips along 25 miles of ditches in the watershed, replace 50 open tile intakes, and hold workshops in the watershed to increase conservation tillage, nutrient and pesticide management, conservation drainage and restoring wetlands.
This project will promote positive land use changes, along with a sense of watershed stewardship and awareness throughout the Crow River Watershed. This project contains three main tasks: BMP installation, public outreach and administration. This project will also work with the Big Swan Lake Association in Meeker County to host a shoreline naturalization workshop.
The goal of this project is to develop a watershed-wide, multi-parameter Total Maximum Daily Load (TMDL) and Implementation Plan that will collectively address all water quality impairments throughout the Elm Creek watershed.
Currently, there are approximately 5,050 feedlots with fewer than 300 animal units that need to come into compliance with State feedlot rules. Clean Water Feedlot Water Quality Management Grant funds are being used to provide financial assistance to landowners with feedlot operations less than 300 animal units in size and located in a riparian area or impaired watershed.
The GVCC Pond Excavation Project will remove approximately 2,500 cubic yards of accumulated polycyclic aromatic hydrocarbons (PAH) Level/Tier 3 contaminated sediment from the Golden Valley Country Club stormwater treatment pond.
The Thief River is the source of drinking water for the City of Thief River Falls. The river's other designated uses also include recreation and aquatic life. Water quality monitoring conducted by local agencies discovered that the Thief River is not meeting state water quality standards for both turbidity (muddiness) and dissolved oxygen. Each year, approximately 12,376 tons of sediment is deposited into the Thief River Falls reservoir by the Thief River. That is the equivalent of over 1,200 dump trucks full of dirt.
In the early 1900s, a joint State and County drainage project constructed a 1 mile outlet channel to Grand Marais Creek to provide a shorter outlet to the Red River and effectively abandoned the lower 6 miles of the natural channel. In recent times, the ditch has eroded from its original shape to a channel of steep gradients and unstable banks. This has resulted in head cutting of the channel and nearly continuous channel erosion and bank sloughing with the effect of depositing up to an estimated annual average of 700 tons of sediment into the Red River.
This project will support construction of three watershed framework models built using the Hydrologic Simulation Program FORTRAN (HSPF). These executable models will simulate hydrology at the subbasin scale. An HSPF model will be built for each of three major watersheds: the Crow River/North Fork Crow River, the South Fork Crow River, and the Sauk River.
This project will finalize HSPF watershed model construction and complete the calibration/validation process for the following three watersheds: North Fork Crow River, South Fork Crow River, and Sauk River.
This project will complete the development of two watershed HSPF models for the Mustinka River and Bois de Sioux River watersheds. These calibrated and validated executable models will simulate hydrology at the 12-digit HUC subbasin scale.
This project will construct, calibrate, and validate two Hydrologic Simulation Program FORTRAN (HSPF) watershed models. The consultant will produce HSPF models that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDLs) at the Big Fork River and Little Fork River watersheds.
This project will complete spatial and temporal revisions of 6 Hydrologic Simulation Program FORTRAN (HSPF) models, the recalibration and validation of 7 watershed HSPF models, and the revision of the drainage network and point source representation of the Pomme de Terre HSPF model.
This project will complete data collection on 11 lakes over a 2 year period in the Pomme de Terre Watershed. The data collected will be be used in the Major Watershed Project proposed for this watershed.
This project will develop an Implementation Plan for restoring Lake St. Croix and impaired waters within the contributing watershed, and protect waters currently attaining water quality standards.
Lily Lake, in Stillwater, is a popular recreational spot for residents with its swimming beach, fishing pier, and canoe access. Lily Lake is impaired by excess nutrients, and restoring its water quality is a priority for the community.
This project will establish a groundwater monitoring network in the 11 county metropolitan area. The network will provide information about aquifer characteristics and natural water trends by monitoring healthy aquifers (non-stressed systems). The project will also develop an automated system that captures groundwater level and water use data. This system will enhance evaluation of changes in aquifers that are stressed by pumping from existing wells.
The City of St. Louis Park, in partnership with the Minnehaha Creek Watershed District, is proposing to re-meander a portion of the creek using funding provided through the Clean Water Fund. The affected section of Minnehaha Creek was straightened when development first came to St. Louis Park in the early 1900s. At that time, wetlands were filled and the stream channel was
altered to allow for industrial development around the creek.
This project will create a high accuracy elevation dataset - critical for effectively planning and implementing water quality projects - for the state of Minnesota using LiDAR (Light Detection and Ranging) and geospatial mapping technologies. Although some areas of the state have been mapped previously, many counties remain unmapped or have insufficient or inadequate data. This multi-year project, to be completed in 2012, is a collaborative effort of Minnesota's Digital Elevation Committee and partners with county surveyors to ensure accuracy with ground-truthing.
The DNR has been charged by the legislature to develop rules that protect and manage the Mississippi River Corridor Critical Area (MRCCA) for natural resource, economic development, transportation, historic preservation, and other values. This project engages stakeholder groups in a public process to balance regulatory protections with local flexibility and control.
This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, and fieldwork expenses associated with monitoring and assessment activities.
Lake Monitoring: Lakes are monitored for nutrients, clarity and other information to provide the data needed to assess the aquatic recreation use support.
The Mustinka River winds through five counties in west central Minnesota and empties into Lake Traverse, a border waters lake with excellent fishing and recreational opportunities. For several years, sections of the river have been impaired for turbidity due to too much soil/sediment eroding from the land and washing away into the water. Excess sediment degrades aquatic habitat
and feeds algae blooms.
This project will replace a conventional 32 foot wide neighborhood street with a narrowed 22 -24 foot wide street that will include rain gardens, sidewalk, and boulevard trees. North St. Paul is using the term Living Streets to describe a new type of street that will eventually replace most of the city's existing streets. Living streets are narrower and have less pavement than existing streets. Reducing the width of existing streets reduces construction costs and assessments to residents. It allows room for the installation of rainwater gardens to treat stormwater.
This project will assist farmers across Southeast Minnesota by providing guidance on management of nutrient sources including livestock manure, commercial fertilizers, and legumes. This project is important because excess nutrients and bacteria are causing negative impacts to the quality of waters. Two Nutrient Management Specialists will work one-on-one with farmers to develop 70 plans each year. Over time, it is anticipated that the number of new nutrient management plans will decrease as acres with plans increase.
The Pomme de Terre River watershed is located in west central Minnesota and occupies a portion of six counties. For many years surface water quality within the watershed has been a concern to local government, and in 1982 the Counties and SWCDs within the watershed area formed the Pomme de Terre River Association Joint Powers Board to begin addressing this issue. In 2002 the Pomme de Terre River was placed on the Impaired Waters list for turbidity.The project partners are collaborating to improve surface water quality within the watershed with a grant from the Clean Water Fund.
Certain stretches of the Pomme de Terre River have been identified as impaired. This project will quantify the reductions in pollutant loading that would be necessary to bring water quality in the impaired stretches to an acceptable level. It will also identify strategies that would improve water quality in these impaired stretches. Some funds will support public input activities into the Pomme de Terre River watershed management plan.
This project will develop feasibility analysis, a drawdown plan for Malmedal Lake and an analysis of available options for fish barriers in the watersheds of Malmedal Lake and Strandness Lake.