All Projects

6737 Results for
Recipient
Todd County
2012 Fiscal Year Funding Amount
$291,890
Fund Source

This project will inventory and conduct compliance inspections on Subsurface Treatment Systems (SSTS) around eight lakes in Todd County. Lakes to be inventoried include Big Sauk Lake, Big Swan Lake, Little Osakis Lake, Fairy Lake, Lily Lake, Long Lake, Little Birch Lake and Moose Lake. Approximately 1,200 parcels will receive compliance inspections. Systems that fail to meet standards will be brought into compliance using procedures available in rule and ordinance.

Todd
Recipient
Todd County
2014 Fiscal Year Funding Amount
$50,312
Fund Source

This project represents the third septic inventory effort by Todd County. The four lakes included - Guernsey, Juergans, Little Sauk, and Long Lakes - are all designated by the Sauk River Water District's Sauk Lake Management Unit as high priority for water quality improvement. Three of these lakes are listed as water quality-impaired for nutrients and the fourth - Long Lake - has had periodic e.Coli problems documented in several tributaries. This project will allow Todd County to expand on previous evaluations of 13 other lakes.

Todd
Recipient
Todd County
2015 Fiscal Year Funding Amount
$30,680
Fund Source

Todd County Septic Inspectors will research septic systems on 313 parcels that are located in the "highly vulnerable" portion of the City of Long Prairie's Drinking Water Supply Management Area. Each parcel's tanks and soil drain fields will be inspected for septic system compliance. Todd County will follow up with landowners found to have noncompliant systems in an effort to protect Long Prairie''s drinking water supply.

Todd
Recipient
Sauk River Watershed District
2010 Fiscal Year Funding Amount
$68,475
Fund Source

The SRWD, with assistance from local volunteers, will conduct water quality assessments on William Lake, Long Lake, Cedar Lake, Bass Lake. Felix Lake, Little Osakis Lake and Trout Creek to attain the necessary data to determine impairment status.

Chippewa
Todd
Recipient
Todd County
2016 Fiscal Year Funding Amount
$49,529
Fund Source

The proposed work will be the fifth septic inventory effort conducted by Todd County and will include eight lakes, 431 parcels, and 277 established addresses. Three of the lakes - Cedar, Long Higgens, and Pauley are located in the Sauk River Watershed District's Sauk Lake Management Unit which is a high priority for improvement. These are the last three lakes of any size to be completed in the Sauk River Watershed portion of Todd County. Nitrogen and phosphorus levels are an issue through the watershed and this management unit in particular.

Todd
Recipient
Carver County
2017 Fiscal Year Funding Amount
$74,233
Fund Source

Crack seal and seal coat 1.5 miles of trail at Lake Minnewashta Regional Park and 3.4 miles of trail on the Dakota Rail Regional Trail. This maintains user satisfaction of 164,000 visits, and 107,000 visits annually to Lake

Carver
Recipient
Regents of the University of Minnesota (Morris Campus)
2022 Fiscal Year Funding Amount
$9,993

To make transcriptions of the oral history collection publicly accessible for researchers of West Central Minnesota history.

Chippewa
Grant
Big Stone
Otter Tail
Pope
Stevens
Swift
Recipient
City of Henning
2017 Fiscal Year Funding Amount
$8,588

To hire a qualified historian to complete the nomination to the National Register of Historic Places for Trinity Lutheran Church.

Otter Tail
Recipient
City of Henning
2018 Fiscal Year Funding Amount
$10,000
Otter Tail
Recipient
City of Henning
2020 Fiscal Year Funding Amount
$10,000
Otter Tail
Recipient
City of Henning
2022 Fiscal Year Funding Amount
$118,769

To hire qualified professionals to repair roof elements on Trinity Lutheran Church, listed in the National Register of Historic Places.

Otter Tail
Recipient
City of Henning
2016 Fiscal Year Funding Amount
$4,000

The City of Henning hopes to rescue the 117-year-old Trinity Lutheran Church building, preserving its' architectural history, its' history for the many residents that attended the church, and restore this building as a point of Pride for the Community and the surrounding region. This twin spire church, built by a Danish Congregation, has rooted itself in the lives of many area descendants, all now participating in the rescue of this property.

Otter Tail
Recipient
MN DNR
2012 Fiscal Year Funding Amount
$110,000
2013 Fiscal Year Funding Amount
$110,000

PROJECT OVERVIEW

Dakota
Fillmore
Goodhue
Houston
Olmsted
Wabasha
Winona
Recipient
University of Minnesota
2012 Fiscal Year Funding Amount
$140,000
2013 Fiscal Year Funding Amount
$140,000

PROJECT OVERVIEW

Dakota
Fillmore
Goodhue
Houston
Olmsted
Wabasha
Winona
Recipient
U of MN
2011 Fiscal Year Funding Amount
$300,000

PROJECT OVERVIEW

Fillmore
Goodhue
Houston
Wabasha
Winona
Recipient
Ramsey County Parks and Recreation
2016 Fiscal Year Funding Amount
$147,000

With roughly 70,000 residents, Minnesota is home to the largest Hmong population in the United States. The top spinning game of Tuj Lub (pronounced - too loo) has its roots in Southeast Asia and holds cultural significance to the Hmong community. Formal Tuj Lub courts, constructed near a multi-shelter picnic area at Keller Regional Park, seek

Anoka
Carver
Dakota
Hennepin
Ramsey
Scott
Washington
Recipient
Rice County
2014 Fiscal Year Funding Amount
$174,927
Fund Source
Rice
Recipient
LimnoTech
2012 Fiscal Year Funding Amount
$3,810
2011 Fiscal Year Funding Amount
$46,430
Fund Source

This project will complete a chloride management plan which will lay out a strategy for addressing chloride impacts to our surface waters for the 7-county metropolitan area. This chloride management plan will satisfy EPA requirements for impaired waters, address waters not yet listed, and develop a strategy to protect waters that are currently meeting the water quality standards.

Anoka
Carver
Dakota
Hennepin
Ramsey
Scott
Washington
Recipient
Fortin Consulting
2011 Fiscal Year Funding Amount
$63,946
2013 Fiscal Year Funding Amount
$42,000
2014 Fiscal Year Funding Amount
$30,000
Fund Source

This project will provide the MPCA and all local partners in the Twin Cities Metropolitan Area (TCMA) the information and tools necessary to improve and/or maintain water quality with respect to chloride for the 7-county metropolitan area during the winter maintenace period.

Anoka
Carver
Dakota
Hennepin
Ramsey
Scott
Washington
Recipient
U of MN - MN Geological Survey
2017 Fiscal Year Funding Amount
$183,000
Anoka
Dakota
Fillmore
Goodhue
Hennepin
Houston
Olmsted
Wabasha
Washington
Winona
Recipient
Minnesota Department of Natural Resources
2013 Fiscal Year Funding Amount
$450,000
Fund Source

The goal of this project is to assess groundwater sustainability in the I-94 corridor between the Twin Cities and St. Cloud due to the corridor's significant expected growth, the inerent natural limits of groundwater, and the vulnerability of groundwater to contamination.

Benton
Carver
Hennepin
Kandiyohi
McLeod
Meeker
Mille Lacs
Morrison
Pope
Sherburne
Stearns
Wright
Recipient
Chaska Historical Society
2017 Fiscal Year Funding Amount
$6,750

To hire qualified professionals to update and edit a manuscript on the history of Chaska.

Carver
Recipient
MN DNR
2014 Fiscal Year Funding Amount
$1,000,000

Over the past 100 years, about half of Minnesota’s original 22 million acres of wetlands have been drained or filled. Some regions of the State have lost more than 90 percent of their original wetlands. The National Wetland Inventory, a program initiated in the 1970s, is an important tool used at all levels of government and by private industry, non-profit organizations, and private landowners for wetland regulation and management, land management and conservation planning, environmental impact assessment, and natural resource inventories.

Beltrami
Cook
Itasca
Kittson
Koochiching
Lake
Lake of the Woods
Mahnomen
Marshall
Norman
Pennington
Polk
Red Lake
Roseau
St. Louis
Recipient
Probstfield Farm Living History Foundation, Inc.
2012 Fiscal Year Funding Amount
$3,600

To update the 2003 Historic Structures Report to provide more specific guidance on the restoration of the Randolph M. Probstfield House, listed in the National Register of Historic Places.

Clay
Recipient
Grace Memorial Episcopal Church
2011 Fiscal Year Funding Amount
$3,466

This church, built in 1901 and listed in the National Register of Historic Places, had its electrical service updated. The main circuit breaker and subfeed panels were replaced. An outdoor electrical outlet was replaced and several more outlets were added to the interior. Larger supply wires were installed to improve capacity for future handicap accessible improvements to the building.

Wabasha
Recipient
DNR
2011 Fiscal Year Funding Amount
$1,100,000

PROJECT OVERVIEW

Anoka
Carver
Chisago
Cook
Dakota
Goodhue
Hennepin
Isanti
Lake
Ramsey
Rice
Scott
Sherburne
St. Louis
Washington
Wright
Recipient
Great River Greening
2015 Fiscal Year Funding Amount
$300,000

Though many parts of the Twin Cities metropolitan area are urbanized, there are also has large areas of natural lands that continue to serve as important habitat for fish, wildlife, and plant communities. However, pressure on these remaining lands continues to intensify as population and development pressures increase.

Anoka
Carver
Chisago
Dakota
Goodhue
Isanti
Ramsey
Sherburne
Washington
Recipient
Emmons and Olivier Resources, Inc.
2011 Fiscal Year Funding Amount
$53,000
Fund Source

This project will provide the monitoring of reaches where there are data gaps, incorporate new data and analyze relevant data, identify pollutant sources, hold a stakeholder meeting, and gather information towards the future development of a Draft Restoration (TMDL) and Protection Plan.

Aitkin
Anoka
Becker
Beltrami
Benton
Carlton
Carver
Cass
Chisago
Clearwater
Crow Wing
Douglas
Hennepin
Hubbard
Isanti
Itasca
Kanabec
Kandiyohi
McLeod
Meeker
Mille Lacs
Morrison
Otter Tail
Pope
Renville
Sherburne
Sibley
Stearns
Todd
Wadena
Wright
Recipient
Buffalo-Red River Watershed District
2013 Fiscal Year Funding Amount
$336,860
Fund Source

Phase II of the Upper South Branch Project will continue a FY2011 CWF project with the strategic implementation of conservation practices within the Upper South Branch of the Buffalo River watershed. This second phase will result in approximately 305 acres of new filter strips, 50 side inlet sediment control structures, and 8 sediment control basins which will reduce sediment loading to the stream by 4,700 tons/year and phosphorus by 9,700 pounds/year.

Becker
Clay
Otter Tail
Wilkin
Recipient
Emmons & Olivier Resources (EOR)
2014 Fiscal Year Funding Amount
$38,120
Fund Source

The goal of this project is the completion of an Upper Mississippi River Bacteria Total Maximum Daily Load (TMDL) and Protection Plan. In addition, an Implementation Plan will be developed and finalized under this contract.

Meeker
Todd
Recipient
Rice County
2014 Fiscal Year Funding Amount
$124,976
Fund Source

The Cannon River is a designated Wild and Scenic River that originates in Rice County and joins the Mississippi River 120 miles downstream near Red Wing. The Upper Cannon, which encompasses 29% of the entire watershed, has been identified as a priority subwatershed.

Le Sueur
Rice
Steele
Waseca
Recipient
Emmons and Olivier Resources, Inc.
2011 Fiscal Year Funding Amount
$95,999
Fund Source

This project will support the monitoring of reaches where there are data gaps, incorporate new data and relevant data, continue identification of pollutant sources, complete load duration curves, coordinate and encourage participation in stakeholder meetings. The information gathered during Phase IIB will be utilized towards the development of a Draft Restoration (TMDL) and Protection Plan (Plan).

Aitkin
Anoka
Benton
Carver
Chisago
Crow Wing
Dakota
Douglas
Hennepin
Isanti
Kanabec
Kandiyohi
Le Sueur
McLeod
Meeker
Mille Lacs
Morrison
Nicollet
Pope
Ramsey
Renville
Scott
Sherburne
Sibley
Stearns
Todd
Wright
Recipient
RESPEC
2016 Fiscal Year Funding Amount
$68,505
Fund Source

This project will extend the simulation period for the Hydrological Simulation Program - FORTRAN (HSPF) models for the Grand Rapids, Brainerd, Crow Wing, Redeye, Long Prairie, Sartell, Sauk, St. Cloud, and Crow watersheds, and review and comment on the calibration.

Aitkin
Becker
Benton
Carlton
Carver
Cass
Crow Wing
Douglas
Hennepin
Hubbard
Itasca
Kandiyohi
McLeod
Meeker
Mille Lacs
Morrison
Otter Tail
Pope
Sherburne
St. Louis
Stearns
Todd
Wadena
Wright
Recipient
RESPEC
2016 Fiscal Year Funding Amount
$71,525
Fund Source

This project will extend, calibrate, and validate watershed models using the Hydrological Simulation Program - FORTRAN (HSPF) watershed model for the Mississippi Headwaters, Leech Lake, Pine, and South Fork Crow Watersheds.

Aitkin
Becker
Beltrami
Carver
Cass
Clearwater
Crow Wing
Hennepin
Hubbard
Itasca
Kandiyohi
McLeod
Meeker
Renville
Sibley
Wright
Recipient
Crow River Organization of Water
2010 Fiscal Year Funding Amount
$300,000
Fund Source

Upper Mississippi, North Fork Crow River Major Watershed TMDL Project led by CROW with assistance from local partners North Fork Crow River Watershed District (WD); Middle Fork Crow River WD; Wright Soil and Water Conservation District (SWCD).

Carver
Hennepin
Kandiyohi
McLeod
Meeker
Pope
Stearns
Wright
Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$134,960
Fund Source

The primary goal of this project is to examine the calibration and validation of recently extended Hydrological Simulation Program – FORTRAN (HSPF) watershed models for the Mississippi River-Headwaters, Mississippi River-Grand Rapids, Mississippi River-Brainerd, Mississippi River-Sartell, Mississippi River-St. Cloud, Leech Lake, Pine River, Crow Wing River, Long Prairie River, and Redeye River watersheds and revise the calibration.

Aitkin
Becker
Beltrami
Benton
Carlton
Cass
Clearwater
Crow Wing
Douglas
Hubbard
Itasca
Mille Lacs
Morrison
Otter Tail
Pine
Sherburne
St. Louis
Stearns
Todd
Wadena
Recipient
Buffalo-Red River Watershed District
2012 Fiscal Year Funding Amount
$50,013
2013 Fiscal Year Funding Amount
$90,160
Fund Source

This project will provide MPCA staff, local partners and citizen volunteers with a framework for building local capacity to design civic engagement and communication/outreach efforts that will contribute to meaningful and sustained public participation in surface water protection and restoration activities throughout the watershed.

Clay
Otter Tail
Wilkin
Recipient
Tetra Tech
2017 Fiscal Year Funding Amount
$99,980
Fund Source

This goal of this project is the completion of a Hydrological Simulation Program FORTRAN (HSPF) watershed model for the Upper Red River watershed in the Red River Basin. This includes the construction, calibration, and validation of the model for hydrology and water quality parameters.

Clay
Wilkin
Recipient
Buffalo-Red River Watershed
2011 Fiscal Year Funding Amount
$135,363
Fund Source

Portions of the South Branch of the Buffalo River are currently overloaded with sediment. Two primary waterways in the watershed, Deerhorn Creek and the South Branch, are listed as impaired for turbidity. Due to sediment deposition in the channel, the waterways have lost much of their capacity. Historical attempts by landowners and others to restore the capacity of the channel by removing sediment have had limited success due to additional excess sediment being washed into the channel.

Otter Tail
Wilkin
Recipient
Wenck Associates, Inc.
2011 Fiscal Year Funding Amount
$146,988
Fund Source

This project will develop a watershed restoration plan that provides quantitative pollutant load reduction estimates and a set of pollutant reduction and watershed management strategies to achieve water quality standards for all impairments within the watershed. It will also an important framework for civic and citizen engagement and communication, which will contribute to long-term public participation in surface water protection and restoration activities throughout the watershed.

Anoka
Carver
Dakota
Hennepin
Ramsey
Sherburne
Washington
Wright