This project will provide cost-share funds to landowners in vulnerable groundwater areas for the incorporation of cover crops in their crop rotation and to provide education related to nitrogen BMPs through field trials and Nutrient Management Plans. An anticipated 100 producers in highly vulnerable areas, will plant 3,000 acres of cover crops resulting in preventing potentially 19,800 pounds of nitrate from leaching into groundwater.
This project will quantify and qualify the effectiveness of herbicide treatments and native plant re-establishment at Duck Lake through systematic vegetative surveys pre and post herbicide application and following mid-summer die-off of curly-leaf pondweed. The data and analysis will ultimately be used in the development of TMDLs, implementation and protection strategies for other lakes in the Middle Minnesota Major Watershed.
The goal of this project is to develop a watershed-wide, multi-parameter Total Maximum Daily Load (TMDL) and Implementation Plan that will collectively address all water quality impairments throughout the Elm Creek watershed.
Fish Lake is 238 acres and does not meet state water quality standards due to excessive nutrients. Through the Total Maximum Daily Load study, a recommendation was made to treat the lake with alum to achieve the state's water quality standards. The goal of this project is to reduce the phosphorus load to Fish Lake by 310 pounds per year and meet the needed phosphorus reduction goal. The project will be completed as a partnership between the Elm Creek Water Management Commission, Three Rivers Park District, the City of Maple Grove, and The Fish Lake Area Resident's Association.
The Ramsey-Washington Metro Watershed District (RWMWD) is responsible for the protection and restoration of the water quality of 20 lakes and 5 creeks within its boundary. Permit and voluntary cost share programs serve to slowly redevelop the watershed to the benefit of these water bodies. However, additional projects are needed- not only to implement green infrastructure in areas that need extra restoration and protection, but also to foster new relationships between citizens and the RWMWD to rally together in a common goal to the benefit of their water resources.
This project will support Minnesota's condition monitoring strategy through the collection of water quality data on streams and rivers in the Nemadji River watershed. The Nemadji River watershed is located in southeastern Carlton County and northeastern Pine County. Water quality samples will be collected primarily during weather-related events that affect stream flow such as snowmelt and rainfalls.
The Fairview Avenue storm sewer system is under capacity and stormwater runoff reaches the pipe faster than the pipes can convey the water downstream. This causes the system to surcharge, causing arterial street flooding, local street flooding, inundation of open spaces, as well as private property damage. This storm sewer system is directly connected to several significant regional water bodies.
Currently, there are approximately 5,050 feedlots with fewer than 300 animal units that need to come into compliance with State feedlot rules. Clean Water Feedlot Water Quality Management Grant funds are being used to provide financial assistance to landowners with feedlot operations less than 300 animal units in size and located in a riparian area or impaired watershed.
Currently, there are approximately 5,050 feedlots with fewer than 300 animal units that need to come into compliance with State feedlot rules. Clean Water Feedlot Water Quality Management Grant funds are being used to provide financial assistance to landowners with feedlot operations less than 300 animal units in size and located in a riparian area or impaired watershed.
The Minnesota DNR and the Minnesota Forest Resources Council work with forest landowners, managers and loggers to implement a set of voluntary sustainable forest management guidelines that include water quality best management practices (BMPs) to ensure sustainable habitat, clean water, and productive forest soils, all contributing to healthy watersheds. This project will monitor the implementation of these forest management guidelines and BMPs on forested watersheds in MN.
Le Sueur County has completed water quality assessments of its lakes, which are on the impaired waters list for excess nutrients. The Francis Rays Sakatah Tetonka Lakes Septic Inventory project will complete up to 400 shoreland septic compliance inspections, create an ArcMap GIS layer, create community assessment reports on priority areas and provide education and outreach to the public through informational meetings and website development. The project will also jump-start upgrading non-compliant septic systems.
River Watch (RW) enhances watershed understanding and awareness for tomorrow’s decision-makers through direct hands-on, field-based experiential watershed science. High School based teams throughout the Minnesota River Basin participate in a variety of unique and innovative watershed engagement opportunities such as Water Quality Monitoring and Macroinvertebrate surveys that are suited to their school, community, and watershed needs.
BWSR will administer funding to eligible County projects that provide funds and other assistance to low income property owners to upgrade or replace Noncompliant Septic Systems. BWSR will also manage annual reporting completed by each County.
Varney Lake is owned and maintained by the City of white Bear Lake as part of its stormwater collection system. The City will excavate approximately 10,000 cubic yards of polycyclic aromatic hydrocarbons (PAH) contaminated sediment from Varney Lake (which is located in a residential portion of the City) and manage the sediments on site by encapsulating the sediment in a berm covered with clean top soil. The encapsulated sediment will be managed as a solid waste in what the MPCA refers to as a limited use solid waste landfill (Facility).
The goal of this project is to construct, calibrate, and validate three HSPF watershed models. The project will result in HSPF models that can readily be used to provide information to support conventional parameter TMDLs. The models are expected to generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen which are consistent with available sets of observed data.
The goal of this project is to supplement and refine the Deer Creek Watershed TMDL Report and Implementation Plan project with detailed determinations of critical source areas and prioritization of the associated management practices, facilitated by additional meetings with local resource managers and validated with a field survey. Completed work will more fully inform the TMDL report and TMDL implementation plan on critical source areas of sediment and quantify those sources.
The Lower St. Croix Watershed (LSCW) consists of an abundance of natural resources making it conducive for both agricultural production and urban areas. The watershed also contains various geologic features rendering substantial areas of the watershed to have vulnerable groundwater including DWSMA vulnerability, pollution sensitivity to wells, pollution sensitivity to near surface materials, karst features, and well testing show ? 5 mg/L nitrate.
The Greater Blue Earth River Basin Alliance (GBERBA) is a joint powers organization consisting of ten member Counties and SWCDs encompassing the Blue Earth, Le Sueur and Watonwan Watersheds. Our mission is to lead in the implementation and promotion of economically viable watershed activities through the combined efforts of local partners. We have identified two target areas in the GBERB (Greater Blue Earth River Basin) where high levels of nitrates directly affect public water supply.
This project will study the geologic controls on nitrate transport in southeast Minnesota's karst landscape and will also provide datasets for other projects over time.
The German-Jefferson Subordinate Service District Board (board) completed a voluntary septic inventory through the Clean Water Fund in 2013. 344 out of 754 parcels participated in the inventory. Approximately 50% of the septic systems were found to be non-compliant with MN Rules Chapter 7080. That project included an assessment of septic systems on non-participating properties that identified eleven priority areas in populated communities with small lots. Three community feasibility studies out of the eleven priority areas were conducted.
The GVCC Pond Excavation Project will remove approximately 2,500 cubic yards of accumulated polycyclic aromatic hydrocarbons (PAH) Level/Tier 3 contaminated sediment from the Golden Valley Country Club stormwater treatment pond.
Gorman Lake has elevated nutrient levels and drains into the Cannon River. This project will provide a subgrant to the Gorman Lake Association to install a two-tiered retention pond to reduce both phosphorus and peak flow from a drainage ditch from reaching Gorman Lake. Project partners include three agricultural producers, the Le Sueur Soil and Water Conservation District and the Natural Resources Conservation Service.
The purpose of this project is to develop a framework to implement best management practices (BMPs) on ditches in headwater areas utilizing a partnership between drainage staff and the Greater Blue Earth River Basin Alliance (GBERBA). By replacing failing side-inlets with an alternative design, we can make strides towards our water quality and water quantity goals. The alternative inlets serve to prevent sediment and phosphorus from washing downstream and the design can also alleviate peak flows by temporarily storing stormwater.
From 2011 to 2013, the full reconstruction of University Avenue in Saint Paul for the Central Corridor Light Rail Transit (CCLRT) presents a unique opportunity to improve the quality of stormwater runoff from the Corridor that will not be seen again. Assistance from the Clean Water funds will augment large investments being made by Capitol Region Watershed District, Saint Paul, Ramsey County, and Metropolitan Council implementing highly visible, green infrastructure practices in this transportation corridor to achieve significant stormwater volume reduction and water quality improvements.
Green Streets for Blue Waters is a collaborative effort to install curb cut raingardens and other stormwater management practices within public right of way and on private lands. The project development was funded by the City of Bloomington and the Lower Minnesota River Watershed District, who worked with Metro Blooms to identify the project area and goals.
Minnesota’s use of groundwater has increased over the last two decades. An increasing reliance on groundwater may not be a sustainable path for continued economic growth and development. The DNR is establishing three pilot groundwater management areas (GWMA) to help improve groundwater appropriation decisions and help groundwater users better understand and plan for future groundwater needs associated with economic development.
This project will assess 4 lakes and 17 stream sites. The four lakes will be assessed for total phosphorus, chlorophyll-a, and secchi data by the HCWP staff. Staff will monitor East Twin, West Twin, West Solomon, and St. John’s Lakes for total phosphorus, chlorophyll-a, and Secchi disk readings. In order to obtain a sufficient dataset. Ten samples will be collected over 2 years. Water samples at 17 stream locations for chemical analyses, including intensive watershed monitoring sites and “non-target” sites.
The law also included a direct appropriation of $500,000 in FY2010 to Hennepin County for riparian restoration and stream bank stabilization in the county's 10 primary stream systems. The money is funding projects to protect, enhance and help restore the water quality of five streams and downstream receiving waters. Bassett Creek Plymouth Creek Nine Mile Creek Riley Creek Elm Creek
This project will support construction of three watershed framework models built using the Hydrologic Simulation Program FORTRAN (HSPF). These executable models will simulate hydrology at the subbasin scale. An HSPF model will be built for each of three major watersheds: the Crow River/North Fork Crow River, the South Fork Crow River, and the Sauk River.
This project will finalize HSPF watershed model construction and complete the calibration/validation process for the following three watersheds: North Fork Crow River, South Fork Crow River, and Sauk River.
The goal of this project is to construct, calibrate, and validate a watershed model using HSPF. RESPEC will produce a HSPF model that can readily be used to provide information to support conventional parameter TMDLs.
The goal of this project is to continue and finalize Hydrological Simulation Program FORTRAN (HSPF) watershed model construction and complete the calibration/validation process for the Minnesota River–Headwaters and Lac qui Parle watersheds that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDL) reports.
This project will complete spatial and temporal revisions of 6 Hydrologic Simulation Program FORTRAN (HSPF) models, the recalibration and validation of 7 watershed HSPF models, and the revision of the drainage network and point source representation of the Pomme de Terre HSPF model.
The goal of this project is to extend the existing HSPF models through 2012 in the Chippewa Watershed (07020005) and Hawk-Yellow Medicine Watershed (07020004) to incorporate recent monitoring data to support current MPCA business needs and sediment source investigations.