The Blue Earth SWCD will be monitoring 7 stream sites located in the Le Sueur River Watershed. The stream sites will be monitored at the road crossing locations via bridge, culvert or shore. Onsite conditions will be recorded, water sample readings will be taken for Secchi tube, specific conductance, temperature, pH, DO, and photos taken.
This Total Maximum Daily Load (TMDL) project will develop a TMDL Report and Implementation Plan defining the sources contributing to the impairments and outlining the steps necessary to bring Bluff Creek back to meeting water quality standards.
This project will develop a Final TMDL report and Implementation Plan for the Bluff Creek Watershed. The main outcomes of this project are the development of a Final TMDL Report approved by MPCA and EPA and a Final Implementation Plan approved by MPCA.
The Cottonwood River watershed is one of the last remaining watersheds to complete Cycle I of the Watershed Restoration & Protections Strategies (WRAPS) process. The scope of this project upon completion is have two reports developed; a Watershed Restoration and Protection Strategies report and a Total Maximum Daily Load (TMDL) for the entire watershed.
This project will complete an implementation plan, as required by the Minnesota Pollution Control Agency, for the Zumbro River turbidity TMDL project. It will also revise the Zumbro River Watershed Management Plan (completed 2007) to ensure it continues to reflect local needs, incorporates new information, and develops more effective linkages with related local, state and federal government programs.
This monitoring effort will focus on collecting chemistry and field data information from six sample locations on Hay Creek, Wells Creek, Bullard Creek and Gilbert Creek in Goodhue County and Miller Creek in Wabasha County within the Mississippi River-Lake Pepin Watershed (MRLP). These streams are typically cold water streams which outlet directly to the Mississippi River or Lake Pepin. This monitoring effort is to assist with the 10-year watershed-monitoring schedule that the Minnesota Pollution Control Agency has placed on major watersheds across the State.
This project will support construction of three watershed framework models built using the Hydrologic Simulation Program FORTRAN (HSPF). These executable models will simulate hydrology at the subbasin scale. An HSPF model will be built for each of three major watersheds: the Crow River/North Fork Crow River, the South Fork Crow River, and the Sauk River.
This project will finalize HSPF watershed model construction and complete the calibration/validation process for the following three watersheds: North Fork Crow River, South Fork Crow River, and Sauk River.
This project will complete spatial and temporal revisions of 6 Hydrologic Simulation Program FORTRAN (HSPF) models, the recalibration and validation of 7 watershed HSPF models, and the revision of the drainage network and point source representation of the Pomme de Terre HSPF model.
The consultant LimnoTech will support response to Total Maximum Daily Load (TMDL) comments the peer review process, United States Environmental Protection Agency and public notice. They will then revise the TMDL document as needed and attend internal and external project meetings.
This project will initiate the process of community engagement in the LeSueur River watershed by assessing the needs and interests of the community and bringing a diverse set of stakeholders together to determine how best to foster action in improving and protecting water quality.
This project addresses twelve lakes that have aquatic recreation impairments as identified by eutrophication indicators and 53 impairments on 45 stream reaches in the Minnesota River Mankato and Watonwan River watersheds. The project will develop Total Maximum Daily Loads (TMDLs) addressing impaired lakes and streams in the Minnesota River–Mankato and Watonwan River watersheds. A TMDL establishes the maximum amount of a pollutant allowed in a waterbody and serves as the starting point or planning tool for restoring water quality.
This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, and fieldwork expenses associated with monitoring and assessment activities.
Lake Monitoring: Lakes are monitored for nutrients, clarity and other information to provide the data needed to assess the aquatic recreation use support.
The overall goal of this project is to perform water quality monitoring and load calculation duties to accomplish Minnesota Pollution Control Agency (MPCA) Watershed Pollutant Load Monitoring Network (WPLMN) monitoring efforts at the seven sites within the Redwood and Cottonwood River watersheds as well as the Minnesota River site near Morton. To accomplish this goal the requested funds will provide for technician’s time, mileage, lab costs, supplies, as well as equipment calibration and upkeep.
The Redwood River watershed is one of the last remaining watersheds to complete Cycle I of the Watershed Restoration & Protections Strategies (WRAPS) process. The scope of this project upon completion is have two reports developed; a Watershed Restoration and Protection Strategies report and a Total Maximum Daily Load (TMDL) for the entire watershed.
The Seven Mile Creek Condition Monitoring project will maintain and build on the continuous flow and water quality data base at three stream sites and one county tile in the Seven Mile Creek watershed through the collection of approximately eighty five water samples per monitoring season in preparation for the Middle Minnesota Intensive Watershed Monitoring scheduled to begin in 2013.
This project will complete a Acetochlor Impairment Response Report. This report will combine and coordinate information relating to actions being done in direct response to the acetochlor water quality impairments with those being done and support MDA’s on-going responsibility to assure pesticides are used in a manner that does not cause unreasonable adverse effects on the environment.
This project will provide additional monitoring data to be utilized in the watershed assessment process for the Le Sueur River Watershed Project. Monitoring will take place for an additional year at two sites along the Maple River.
This project will identify priority management zones (PMZ), for the purposes of water quality restoration and protection, within the LeSueur River major watershed. This project is only one component of a larger effort in the LeSueur watershed to complete Total Maximum Daily Load (TMDL) studies while engaging citizens and landowners in land management planning.
This project will provide the monitoring of reaches where there are data gaps, incorporate new data and analyze relevant data, identify pollutant sources, hold a stakeholder meeting, and gather information towards the future development of a Draft Restoration (TMDL) and Protection Plan.
This project will support the monitoring of reaches where there are data gaps, incorporate new data and relevant data, continue identification of pollutant sources, complete load duration curves, coordinate and encourage participation in stakeholder meetings. The information gathered during Phase IIB will be utilized towards the development of a Draft Restoration (TMDL) and Protection Plan (Plan).
This project will build upon the outreach and education efforts of the Zumbro Watershed Restoration and Protection Strategy (WRAPS). The targeted area will be residents of the Zumbro River Watershed, specifically individuals and organizations that are not professionally involved in managing natural resources. This project will provide necessary outreach and education during the interim between the Zumbro WRAPS and beginning the One Watershed, One Plan process.