The purpose of this project is for Lake County Soil and Water Conservation District to continue to assist with the Minnesota Pollution Control Agency’s watershed approach and Watershed Restoration and Protection Strategy (WRAPS) process in the Rainy River Headwaters and Cloquet River watersheds. As part of this, Lake County Soil and Water Conservation District will lead efforts to increase levels of civic engagement and community participation in support of the current WRAPS process.
Contractor will address MPCA comments to the pre-public notice draft Total Maximum Daily Load (TMDL) study for the Lake of the Woods watershed and produce a revised study ready for public notice. RESPEC will also prepare for and participate in two webinar-style public meetings once the study is on public notice.
This project will collect water quality data for four stream sites and six lake sites within the Lake Superior South major
watershed as part of the 10-year cycle for monitoring Minnesota's waters. Due to the large number and geographic extent of
The purpose of this project is to continue supporting the Minnesota Pollution Control Agency in responding to public comments on the Lake Pepin Watershed Phosphorus Total Maximum Daily Load (TMDL) study, which was prepared by LimnoTech under previous work orders.
This project will compile and review previously conducted studies and will prioritize best management practices (BMPs) based on a cost-benefit analysis of their pollutant load reductions and life cycle costs. It will also support the design and construction of BMPs, such as rain gardens and infiltration practices, within the Villa Park subwatershed of the Lake McCarrons watershed.
The goal of this project is to assess and leverage the capacity for the local community to engage in the process of watershed management in the Lake Superior Basin within Lake County and to adopt protection and restoration practices.
The Minnesota Pollution Control Agency (MPCA) will partner with the Science Museum of Minnesota Saint Croix Watershed Research Station (SCWRS) - to collect sediment cores from six basins in the Lake of the Woods (LOW) to analyze the total sediment phosphorus inventory in each basin and compare those results to results from a similar study conducted in 2012.
Lake of the Woods Watershed Assessment will include the tributary waters of Zippel, Williams and Bostic Creeks in Lake of the Woods (LOW) County. This assessment focuses on collection of water chemistry and field parameters at three key sites identified by the Minnesota Pollution Control Agency (MPCA) and field parameters only at one site identified by LOW SWCD. Two of the sites will have extra phosphorus and chlorophyll analysis completed as identified by the MPCA for collecting river nutrients.
The consultant LimnoTech will support response to Total Maximum Daily Load (TMDL) comments the peer review process, United States Environmental Protection Agency and public notice. They will then revise the TMDL document as needed and attend internal and external project meetings.
The goal of this project is to finalize the Lake Pepin Watershed phosphorus total maximum daily load (TMDL) report by using the existing information and documentation prepared under previous contracts to prepare one TMDL report that addresses the impairments on the mainstem of the Mississippi River. Information developed to date for draft TMDLs on the Minnesota River mainstem will be documented for later use by the Minnesota Pollution Control Agency.
This project will complete data collection on 11 lakes over a 2 year period in the Pomme de Terre Watershed. The data collected will be be used in the Major Watershed Project proposed for this watershed.
The Lake Superior Beach Monitoring and Notification Program exists to test recreational beach water and notify the public if bacteria levels become unsafe. This project will expand the Beach Program to include additional outreach efforts, sanitary surveys and testing of new technologies to improve the Beach Program. Monitoring results will be used to inform the public, find the sources of bacterial contamination and address polluted runoff from improper waste disposal.
Improved levels of civic engagement and community participation in support for the Watershed Restoration and Protection Strategy (WRAPS) processes in the St. Louis River, Lake Superior South, and Cloquet River Watersheds. Monitoring plans and compiled field data will be provided and summarized that will aid in the future completion of Total Maximum Daily Load Reports (TMDLs) in these watersheds and in the Lake Superior North Watershed.
The goal of this project is to support the Minnesota Pollution Control Agency (MPCA) in responding to public comments on the Lake Pepin Watershed Phosphorus Total Maximum Daily Loads (TMDLs), which were prepared by LimnoTech under previous phases of the project.
This project is to conduct water chemistry monitoring at two subwatershed sites and two major watershed sites based on flow conditions, targeting runoff events using protocols defined in the Watershed Pollutant Load Monitoring Network (WPLMN) Standard Operating Procedures and Guidance. The data collected will be submitted to Minnesota Pollution Control Agency (MPCA) and used for calculating pollutant loads. This loading information, in turn, will be used at both the state and local level to guide policy and strategies for the restoration and protection of Minnesota’s waters.
This project will determine pre- and post-settlement nutrient trends from sediment chronology, fossil diatom assemblages, and from sediment profiles representing human history in the region (i.e., at least 150 years). Project activities include sample collection; sample preparation; diatom analysis; database creation and management; and data interpretation. Sample cores will be taken on the Lake of the Woods in five major bays (i.e., Four-mile, Muskeg, Sabaskong, Little Traverse, and Big Traverse) in the southern basin.
This project, beginning in Spring of 2014 and lasting until December 2015, will collect water quality data for 16 sites (7 lakes and 4 stream sites) within the Rainy River - Headwaters Major Watershed as part of the 10-year cycle for monitoring Minnesota's waters. Due to the large number and geographic extent of monitoring sites Lake County Soil and Water Conservaion District (SWCD) has coordinated site selection with North St. Louis County Soil and Water Conservaion District (SWCD) and will monitor sites within the southwestern (Kawishiwi River) portion of the watershed.
The purpose of this project is to gain an understanding of modern and historical nutrient and thermal dynamics in Lake of the Woods using modeling, monitoring, sediment core analysis, and whole basin techniques.
The goal of this project is to prepare a draft Lake Pepin Total Maximum Daily Load (TMDL) Report. Lake Pepin is impaired by high levels of nutrients that cause excessive growth of algae.
This project will provide monitoring of four of the major watersheds (8-digit Hydrologic Unit Codes) in the western part of the Rainy River Basin. Staff from the Lake of the Woods SWCD will conduct water quality sampling, review, manage and provide collected data to the Minnesota Pollution Control Agency (MPCA).
This project will repair and upgrade the water control structure and provide water quality enhancement measures on Oasis Pond in Roseville, Minnesota. This project will also protect the quality of downstream receiving waters; specifically Lake Johanna, by reducing phosphorus pollutant loads.
This project will provide information about the amount and sources of phosphorous flowing into Lake St Croix by implementing additional water quality monitoring and reduce the amount of phosphorous flowing into Lake St Croix by implementing phosphorous reduction activities. The St Croix River Association (SCRA) will coordinate with the St. Croix Basin Water Resources Planning Team (Basin Team) on the identification and funding of comprehensive water monitoring and phosphorus reduction activities in the Lake St. Croix portion of the St.
Phase 4 of the Lake Winona Total Maximum Daily Load (TMDL) project will finalize the draft Lake Winona TMDL, dated November 2009, by completing additional data analysis, lake quality modeling, updating the TMDL report, and supporting the public involvement process.
The Rainy River - Rainy Lake, Rainy River - Baudette and Rapid River Watershed Assessments will include the waters of the Baudette River, Black River, Peppermint Creek, Rapid River, Rat Root River and Winter Road River in Koochiching and Lake of the Woods Counties. This assessment focuses on collection of water chemistry and field parameters at the 12 key sites identified and modified by the Minnesota Pollution Control Agency (MPCA). Five of the sites will have extra total phosphorus and chlorophyll analysis completed as identified by the MPCA for collecting river nutrients.
This project will complete the Total Maximum Daily Load (TMDL) study and Watershed Restoration and Protection Strategies (WRAPS) for the Lake Superior North watershed. Two segments of the Flute Reed River are impaired for aquatic life due to elevated turbidity and total suspended solids. The lower Poplar River is also listed as impaired but significant progress has occurred in the last 10 years. A TMDL and implementation plan have been completed for the lower Poplar River impairment. All other waters meet water quality standards and will be considered for protection measures.
This project will support the collection of water-quality samples and gauge streamflow near the mouths of the Rainy and Warroad Rivers; collect water-quality samples at 10 sites in LOW; and measure streamflow velocities and cross-sectional areas of 5 channel constrictions in LOW.
This project will gather watershed data necessary for the development of a Watershed Restoration and Protection Strategy to maintain or improve water quality within the LoW Watershed; and establish project and sub-basin work groups and/or focus groups to guide the MWRPP process.
The Lake of the Woods (LOW) Total Maximum Daily Load (TMDL) study will: (1) identify water quality goals for the Minnesota portions of the LOW/Rainy River Watershed; (2) recommend nutrient allocations to achieve TMDLs where waters do not meet standards; and (3) provide opportunities for stakeholders to engage in the process of watershed-management planning to adopt protection and restoration strategies. The project will include existing in-lake and watershed model updates, TMDL component development, restoration plan development, and public participation.
This project provides fiscal resources for Lake County Soil and Water Conservation District for civic engagement activities in the Lake Superior South, North, and Cloquet watersheds for Watershed Restoration and Protection Strategies (WRAPS). This project also includes provide funding for water chemistry monitoring assistance and diagnostic field work that will fill identified monitoring gaps and stressors within the Lake Superior South watershed.
The goal of this project is to finalize the draft Lake Pepin Total Maximum Daily Load (TMDL) Report, issue it for public comment, address comments, and finalize the report. Lake Pepin is impaired by high levels of nutrients that cause excessive growth of algae. High levels of sediment, carried in by major river systems, also affect the lake. The sediment is filling in the lake at a much faster rate than before Minnesota was settled and intensely farmed. Nutrients and sediment are distinct yet inter-related pollutants, and are being addressed in separate TMDL reports.
Concern for Deer Yard and Poplar lakes centers on their current trends of decreasing water transparencies often associated with phosphorus or sediment increases. Although both lakes still meet nutrient goals, trends in Secchi depth may presage emerging issues with the state of the lakes. This has further led to questions whether the productivity of the lakes have changed over time, what the natural or historical condition of the lakes were, what the current trajectory of each lake is, and how to best set management goals.
The goal of this project is to determine: 1) temperature and seasonal variations in sediment chemical-textural characteristics (upper 10-cm sediment layer) and rates of P release from sediments; and 2) vertical variations in mobile P concentrations in the sediment column of Big Traverse Bay in order to better understand the role of internal P loading to the P economy of LOW and for the development of the LOW TMDL.
This project will develop an Implementation Plan for restoring Lake St. Croix and impaired waters within the contributing watershed, and protect waters currently attaining water quality standards.
The main purpose of this project is to provide fiscal resources for Lake County Soil and Water Conservation District (Lake County SWCD) to be engaged and participate in efforts for civic engagement in the Lake Superior South (LS South) Lake Superior North (LS North) watersheds and lead and carry-out civic engagement in the early stages of the Watershed Restoration and Protection Strategies (WRAPS) process in the Cloquet River watershed.
Update previous draft Total Maximum Daily Load (TMDL) documents and modeling files with Environmental Protection Agency (EPA) comments and site specific standards.
The goal of this project is to gain information about the amount and sources of phosphorous flowing into Lake St Croix by implementing additional water quality monitoring and/or to reduce the amount of phosphorous flowing into Lake St Croix by implementing phosphorous reduction activities.
The Minnesota Pollution Control Agency (MPCA) is a co-sponsor and assists with a portion of the financial support for the International Rainy River-Lake of the Woods Watershed Forum.
This project will dentify critical pathways and areas on the landscape that contribute a disproportionate amount of sediment stressors to selected streams located in LS South and/or LS North HUC 8 watersheds. Unlike other HUC 8 watersheds with one mainstem stream and nested tributaries to the mainstem, LS South and North consist of numerous individual streams flowing to Lake Superior. Each of these streams has a mainstem, tributaries flowing to the mainstem and a surrounding watershed.