All Projects

283 Results for
Recipient
Red River Watershed Management Board
2012 Fiscal Year Funding Amount
$194,490
Fund Source

This project will provide land and water managers in the Red River Basin with data and online tools to prioritize actions on the landscape that achieve water quality objectives identified in local and state plans. This will help identify strategically important locations for implementing erosion control and water management practices. Standardized watershed-based data products will be integrated into a web-based planning tool which will be added to the Red River Basin Decision Information Network (RRBDIN) being developed as part of the Red River Watershed Feasibility Study.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Itasca
Kittson
Koochiching
Lake of the Woods
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Otter Tail, East SWCD
2022 Fiscal Year Funding Amount
$706,488
Fund Source

Watershed based implementation funds will be used to target conservation practices utilizing the principles associated with Prioritize, Target and Measure as referenced in our Local Comprehensive Watershed Management Plan. The following are projects/practices, and their associated pollution reduction estimates, that are included in this budget request: (500 acres of Nonstructural BMPs) to protect/improve land management and reduce bacteria will reduce phosphorus by 65 lbs/yr, nitrogen by 520 lbs/yr, and sediment by 285 tons/yr.

Becker
Douglas
Otter Tail
Todd
Wadena
Recipient
Otter Tail, East SWCD
2021 Fiscal Year Funding Amount
$706,488
Fund Source
Becker
Douglas
Otter Tail
Todd
Wadena
Recipient
Carver Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$63,350
Fund Source

Hydes Lake is the headwaters to Carver Creek and is known for its excellent fishery. However, the lake has elevated nutrient levels which lead to poor water quality. A clean up plan for Hydes Lake has identified the need to reduce phosphorus loading by 81 percent from watershed sources.

Carver
Recipient
Carver Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$32,600
Fund Source

Hydes Lake is the headwaters to Carver Creek and is known for its excellent fishery. However, the lake has elevated nutrient levels which lead to poor water quality. A clean up plan for Hydes Lake identified the need to reduce phosphorus loading by 81 percent from watershed sources.

Carver
Recipient
Otter Tail, East SWCD
2021 Fiscal Year Funding Amount
$217,300
Fund Source
Otter Tail
Wadena
Recipient
BWSR
2012 Fiscal Year Funding Amount
$1,645,000

PROJECT OVERVIEW
The Reinvest in Minnesota (RIM) Wetlands Reserve Program restores wetlands and grasslands through the purchase of permanent conservation easements on privately owned land. The easements limit future land use and put conservation plans in place for future management. The Minnesota Board of Soil and Water Resources is using this appropriation to accelerate the RIM Wetlands Reserve Program resulting in additional permanently protected wetlands and grasslands throughout the state.

OVERALL PROJECT OUTCOME AND RESULTS

Statewide
Recipient
BWSR
2010 Fiscal Year Funding Amount
$9,059,500
Fund Source

The RIM-WRP program will expand past efforts and provide important benefits to the citizens of Minnesota by restoring and permanently protecting priority wetlands and associated upland native grassland wildlife habitat via perpetual conservation easements. This funding will leverage $12.6 million of federal WRP funds for the State of Minnesota and is expected to create and sustain 343 jobs and income to local landowners, businesses and others in the state based on USDA economic estimates.

Becker
Big Stone
Blue Earth
Clay
Cottonwood
Douglas
Jackson
Kandiyohi
Mahnomen
McLeod
Norman
Pennington
Pope
Rice
Steele
Swift
Swift
Recipient
BWSR
2011 Fiscal Year Funding Amount
$6,895,000
Fund Source

The Reinvest in Minnesota (RIM) Reserve Wetlands Reserve Program (WRP) Partnership will accelerate the restoration and protection of approximately 4,620 acres of previously drained wetlands and associated upland native grassland wildlife habitat complexes via perpetual conservation easements. The goal of the RIM-WRP Partnership is to achieve the greatest wetland functions and values, while optimizing wildlife habitat on every acre enrolled in the partnership.

Big Stone
Blue Earth
Clay
Freeborn
Grant
Kandiyohi
Le Sueur
Mahnomen
Marshall
McLeod
Meeker
Murray
Norman
Otter Tail
Pope
Rice
Rice
Recipient
Baord of Water & Soil Resources
2012 Fiscal Year Funding Amount
$13,000,000
Fund Source

The RIM-WRP Partnership permanently protected 5,559 acres of priority wetlands and associated upland native grassland wildlife habitat via perpetual conservation easements on 60 sites and leveraged over $11 million of federal Wetlands Reserve Program funds.

Statewide
Recipient
BWSR; with US Dept of Ag; Ducks Unlimited
2015 Fiscal Year Funding Amount
$9,020,500
Fund Source

The Reinvest in Minnesota (RIM) Wetlands Partnership Phase VI protected and restored 1,391 acres of previously drained wetlands and adjacent grasslands on 15 conservation easements.

Brown
Lyon
Mahnomen
Murray
Nobles
Redwood
Renville
Roseau
Swift
Recipient
Carver County WMO
2023 Fiscal Year Funding Amount
$40,000
Fund Source

Since 2008, a ravine on the Northwest side of Reitz Lake has been eroding on a private parcel, causing sediment and nutrients to discharge into the waterbody. This project will stabilize a ravine that has formed from Airport Road down to Reitz Lake.

Carver
Recipient
Carver County Watershed Management Organization
2011 Fiscal Year Funding Amount
$127,551
Fund Source

The Reitz Lake restoration project began several years ago when water quality samples showed the lake was impaired. Carver County and residents around the lake took action and began to develop a plan (TMDL) to clean up Reitz Lake.Once the TMDL study and the associated implementation plan (which helps to target specific projects) were completed, funding was sought to target high priority projects around the Lake. First, direct untreated run-off from a farmed area of approximately 100 acres to the north of the lake will be slowed and filtered before it enters the lake.

Carver
Recipient
Riley-Purgatory-Bluff Creek
2013 Fiscal Year Funding Amount
$150,000
Fund Source

The goal of this project is to implement 10-15 medium sized projects that will infiltrate and reduce pollutant loads to the waters in the Riley-Purgatory-Creek Watershed District. The District intends to achieve this by using their Citizen Advisors who are well involved with local associations, City staff who are familiar with associations in their jurisdiction and also seek less-known association through various advertising methods. We intend to use staff knowledge to insure that the projects are suitable for the site and implemented correctly to maximize efficiency.

Carver
Hennepin
Recipient
Board of Water and Soil Resources
2013 Fiscal Year Funding Amount
$84,000
Fund Source

State law (M.L. 2011, First Special Session, Ch. 6) directs restoration evaluations to be conducted on habitat restoration projects completed with funds from the Clean Water Fund (M.S. 114.D.50 Subd. 6). The Board of Water and Soil Resources (BWSR) is responsible for convening a Restoration Evaluation Panel containing at least five technical experts who will evaluate a sample of up to 10 habitat restoration projects annually. The Panel will evaluate the restorations relative to the law, current science, stated goals and standards in the restoration plans, and applicable guidelines.

Statewide
Recipient
BWSR
2017 Fiscal Year Funding Amount
$13,808,000
Fund Source

Under the CREP partnership with USDA, 71 easements were recorded on a total of 4,365 acres to restore previously drained wetlands and adjacent uplands. The easements were accomplished with local implementation done by SWCD, NRCS and FSA staff within the 54 county CREP area and leveraged federal funds for both landowner payments and cost share for conservation practice installation.

Becker
Blue Earth
Carver
Clay
Cottonwood
Dodge
Faribault
Freeborn
Jackson
Kandiyohi
Le Sueur
Lyon
Martin
McLeod
Meeker
Mower
Nicollet
Otter Tail
Ramsey
Redwood
Renville
Rock
Sibley
Stearns
Wilkin
Recipient
BWSR
2014 Fiscal Year Funding Amount
$13,292,600
Fund Source

The Reinvest in Minnesota (RIM) Wetlands Partnership Phase V protected and restored 2,041 acres of previously drained wetlands and adjacent native grasslands on 23 conservation easements. All easements have been recorded. $35,000 of funds from other sources were also used.  

Becker
Blue Earth
Clay
Freeborn
Le Sueur
Lincoln
Lyon
Meeker
Murray
Nobles
Otter Tail
Redwood
Stevens
Todd
Wilkin
Recipient
Carver SWCD
2010 Fiscal Year Funding Amount
$40,000
Fund Source

The purpose of this project is to install a sediment pond along County Ditch #4A to trap sediment and associated pollutants before entering into Bevens Creek which drains into the Minnesota River. Carver County Ditch #4A recently went through a redetermination of benefits process and state law now requires a buffer strip one rod (16.5 feet) wide to be maintained along the top of the ditch bank. The sediment pond, in combination with the buffer strip, will reduce the amount of sediments and pollutants that reach Bevens Creek.

Carver
Recipient
Chaska, City of
2024 Fiscal Year Funding Amount
$615,000
Fund Source
Carver
Recipient
Wright SWCD
2015 Fiscal Year Funding Amount
$7,200
Fund Source

The purpose of this project is to create an inventory and priority list of where inlet control and buffer strips are needed along Judicial Ditch 15 to reduce the nutrients, sediment and volume of water being transported by field tile. This will help protect landowner drainage needs, while focusing on applicable best management practices that will reduce on-field and in-channel peak flow erosion. This ditch system is the headwaters to Cokato Lake, which connects to the North Fork Crow River.

Wright
Recipient
Wright SWCD
2014 Fiscal Year Funding Amount
$10,000
Fund Source

The Wright Soil and Water Conservation District (SWCD) will expand its partnership with its USDA partners; this will be the first time that SWCD staff will conduct compliance spot checks for USDA Highly Erodible Land plans. This activity will add a level of certainty that these plans are in compliance.

Wright
Recipient
Minnehaha Creek WD
2017 Fiscal Year Funding Amount
$262,520
Fund Source

The project is part of the Six Mile-Halsted Bay Subwatershed Plan, a planning partnership currently underway which aims to protect and improve natural resources within this priority subwatershed by working closely with partnering agencies to integrate capital investments and maximize public return on investment. This project will enhance two existing stormwater ponds to enhance treatment of phosphorus as well as incorporate treatment of the Church Lake outlet, a lake which routinely fails to meet state water quality standards and contributes to the water quality impairment of East Auburn.

Carver
Recipient
Traverse SWCD
2022 Fiscal Year Funding Amount
$275,000
Fund Source

The primary goal of this project is to protect public water supplies from contamination from nonpoint-sourced pollution by providing farmers with resources to implement soil health Best Management Practices (BMPs) within a set radius of municipal Drinking Water Supply Management Areas (DWSMAs) for cities within Traverse County. The secondary goal of the project is protection of public surface waters and measurable progress towards reduction of nutrient and sediment pollution to impaired watercourses.

Big Stone
Traverse
Wilkin
Recipient
Buffalo-Red River WD
2022 Fiscal Year Funding Amount
$350,000
Fund Source
Otter Tail
Wilkin
Recipient
Buffalo-Red River WD
2024 Fiscal Year Funding Amount
$450,000
Fund Source
Otter Tail
Pennington
Wilkin
Wright
Yellow Medicine
Recipient
Multiple Local Government Units
2011 Fiscal Year Funding Amount
$1,357,221
Fund Source

Imminent Health Threat (IHT) systems are those that are discharging improperly treated human waste onto the ground surface or into surface waters. In addition to the potential water quality impacts, untreated sewage has the potential to introduce bacteria and viruses into the environment. When IHT systems are identified, county or city staff assist the homeowners through the process required to bring their systems into compliance with the septic ordinance.

Beltrami
Big Stone
Chippewa
Chisago
Cook
Dodge
Jackson
Lake
Lake of the Woods
Lincoln
Martin
McLeod
Meeker
Mille Lacs
Pennington
Pipestone
Rice
Scott
Stearns
Recipient
Multiple Local Government Units
2010 Fiscal Year Funding Amount
$860,000
Fund Source

Successful long-term treatment of sewage depends on a system capable of providing adequate treatment and effective on-going operation and maintenance. Clean Water Fund Subsurface Sewage Treatment System (SSTS) Program Enhancement funds are used by counties to strengthen programs dedicated to SSTS ordinance management and enforcement. These funds are used for a variety of tasks required to successfully implement a local SSTS program including inventories, enforcement, and databases to insure SSTS maintenance reporting programs.

Benton
Blue Earth
Carver
Cass
Chisago
Dodge
Douglas
Faribault
Fillmore
Freeborn
Goodhue
Houston
Morrison
Mower
Olmsted
Rice
Steele
Wabasha
Wadena
Winona
Wright
Recipient
Stevens Soil and Water Conservation District
2010 Fiscal Year Funding Amount
$84,000
Fund Source

This project will establish up to 12 miles of riparian buffers along the Pomme de Terre River and its tributaries and install up to 5 raingarden within the cities of Morris and Chokio as identified in the Pomme de Terre TMDL Implementation Plan.

Stevens
Recipient
Board of Water and Soil Resources
2010 Fiscal Year Funding Amount
$1,600,000
Fund Source

Grants to counties to implement SSTS programs including inventories, enforcement, development of databases, and systems to insure SSTS maintenance and of reporting program results to BWSR and MPCA and base grants.

Benton
Blue Earth
Carver
Cass
Chisago
Douglas
Faribault
Goodhue
Houston
Morrison
Rice
Wadena
Wright
Recipient
Pomme de Terre River Association JPB
2019 Fiscal Year Funding Amount
$541,776
Fund Source

With the proposed project, the Pomme de Terre River Association will target catchments delivering the highest 25% of sediment from agricultural land and identified priority management zones for storm water runoff (identified in the Watershed Restoration and Protection Strategy). Implementation is estimate to reduce sediment runoff to prioritized water bodies by 14,690 tons per year and phosphorous by 12,270 pounds per year.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
BWSR
2013 Fiscal Year Funding Amount
$13,810,000
Fund Source

Eight RIM Wetlands applications were selected for funding on 1146.2 acres from this appropriation. In addition 19 RIM-WRP easements, totaling 2,239 acres were funded. Thus a total of 3,385 acres were protected and restored to wetland and grassland habitat. All easements have been recorded. Leverage from other sources of funds was a little over $4.5M.

Statewide
Recipient
Buffalo-Red River Watershed District
2013 Fiscal Year Funding Amount
$336,860
Fund Source

Phase II of the Upper South Branch Project will continue a FY2011 CWF project with the strategic implementation of conservation practices within the Upper South Branch of the Buffalo River watershed. This second phase will result in approximately 305 acres of new filter strips, 50 side inlet sediment control structures, and 8 sediment control basins which will reduce sediment loading to the stream by 4,700 tons/year and phosphorus by 9,700 pounds/year.

Becker
Clay
Otter Tail
Wilkin
Recipient
Buffalo-Red River Watershed
2011 Fiscal Year Funding Amount
$135,363
Fund Source

Portions of the South Branch of the Buffalo River are currently overloaded with sediment. Two primary waterways in the watershed, Deerhorn Creek and the South Branch, are listed as impaired for turbidity. Due to sediment deposition in the channel, the waterways have lost much of their capacity. Historical attempts by landowners and others to restore the capacity of the channel by removing sediment have had limited success due to additional excess sediment being washed into the channel.

Otter Tail
Wilkin
Recipient
Swift SWCD
2023 Fiscal Year Funding Amount
$285,000
Fund Source

Nitrate levels in the water supply for the city of Benson have slowly but steadily been increasing since 2012. This project aims to work with the landowners surrounding the Drinking Water Supply Management Areas (DWSMA's) for Benson and Appleton in Swift County to reduce or eliminate the amount of nitrate entering these water supplies. Proven and effective strategies will be implemented to achieve the goals set forth in this grant.

Swift
Recipient
Waconia, City of
2023 Fiscal Year Funding Amount
$200,000
Fund Source

Planned improvements to the Downtown area will include installation of underground storage, use of a water tower retired from potable service, and a new irrigation system to utilize stormwater runoff in lieu of potable water for irrigation of several green areas.

Carver
2013 Fiscal Year Funding Amount
$333,590
Fund Source

The Red River is impaired for turbidity. The level of turbidity is a significant factor in the cost of treatment of drinking water by the City of Moorhead. This water quality improvement project involves the retrofit of Clay County Ditches 9, 32, and 33 just south of the city. The project involves the installation of an estimated 87 side inlet sediment controls and 35 acres of buffer strips. All three of these ditch systems with over 16 miles of County Ditch will be treated for sediment and erosion control with the installation of conservation practices.

Becker
Clay
Otter Tail
Wilkin
Recipient
Area 2 - West Central Technical Service Area
2019 Fiscal Year Funding Amount
$285,000
Fund Source

This proposal will fund technical assistance for nutrient management planning to accelerate water quality improvements with the 12-county West Central Technical Service Area (WCTSA). A needs assessment identified an estimated 156 certified nutrient management plans that will be needed over a 3 year period. Of the 71 SWCD employees in the WCTSA, only 1 SWCD staff member is dedicated to nutrient management planning. To meet technical assistance needs, this grant will fund a Regional Planning Specialist (RPS) to address local resource concerns.

Benton
Big Stone
Chippewa
Douglas
Kandiyohi
Meeker
Morrison
Pope
Stearns
Stevens
Swift
Todd
Recipient
Area 2 - West Central Technical Service Area
2014 Fiscal Year Funding Amount
$250,000
Fund Source

The West Central Technical Service Area (WCTSA) serves 12 Soil and Water Conservation Districts (SWCDs) in west central Minnesota and has been experiencing increased workload due to greater requests from member SWCDs. This funding will sustain a limited-term technician and purchase related support equipment to assist landowners in implementing targeted, high priority practices that result in the greatest water quality outcomes.

Benton
Big Stone
Chippewa
Douglas
Kandiyohi
Meeker
Morrison
Pope
Stearns
Stevens
Swift
Todd
Recipient
Minnesota Board of Water and Soil Resources
2011 Fiscal Year Funding Amount
$2,300,000
Fund Source

This program is a part of a comprehensive clean water strategy to prevent sediment and nutrients from entering our lakes, rivers, and streams; enhance fish and wildlife habitat; protect groundwater and wetlands. Specifically the Wellhead Protection Conservation Easement program is targeted to protect drinking water through the Reinvest in Minnesota Program (RIM).

Cottonwood
Grant
Otter Tail
Rock
Recipient
Upper Minnesota River WD
2024 Fiscal Year Funding Amount
$600,000
Fund Source
Big Stone