Rice Creek West Regional Trail, design and reconstruct entrance drive parking lot and sidewalks in Manomin Park trail head. (5 of 6 projects financed with grant.)'
Mississippi West Regional Park.?Design and construct new boat launch, improve existing roadway, fishing pier/ observation deck, utilities, landscape restoration, signs and site furnishings, plus associated permit fees and contingencies.MC Action on 06/27/2012 reduced the grant amount from $400,000 to $382,000.
Bruce Vento Regional Trail. Design development plans for trail development and connection, storm water management improvements and site amenities on trail from Buerkle Road to Hwy 96.
Bald Eagle Otter Lakes Regional Park. Design and construct an early learning center at Tamarack Nature Center, and pedestrian connections, landscape restoration, signage, and other site amenities.
Above the Falls Regional Park, design and construct trail loops, river access areas, landscapes, storm water management. Includes site furniture, landscaping, utilities, survey and site investigations, design, engineering, and project management.
Design and construction of trail loops, river access areas, landscape and storm water management improvements at ATF RP. Project includes site furniture, landscaping, site utilities, survey and site investigations, design and engineering
Mississippi River Regional Trail. MnDOT identified and supported Mississippi River Regional Trail connection from Harriet Island Regional Park in St. Paul to the Mississippi River Trail in Dakota County. Design, engineering and construction for a combine
Mississippi River Regional Trail. MnDOT identified and supported Mississippi River Regional Trail connection from Harriet Island Regional Park in St. Paul to the Mississippi River Trail in Dakota County. Design, engineering and construction for a combine
Initial project was Design and Construction of a trail bridge over County State-Aid Highway 19 for the Lake Minnetonka LRT Regional Trail. 2015 Legislature amended project to "save trail crossing". PAT Legacy (F14-15) matched with $1,040,000 in federal funds.
Grass Vadnais Lakes Regional Park, design and construct trail on east side of Vadnais Lakes, new bituminous trail and parallel turf trail; site and restoration improvements; improve storm water management; and site amenities.
Design and reconstruct approximately 12,300 lineal feet of bituminous trails in that portion of Hyland-Bush-Anderson Lakes Park Reserve managed by the City of Bloomington.
Rice Creek North Regional Trail. Design and construct approximately 4,200 lineal feet of the Rice Creek North Regional Trail from Hodgson Road to Baldwin City Park.
Construct 2.1 miles of paved trail between First Street in the City of Chaska and County Road 40 in the City of Carver on the Minnesota River Bluffs Regional Trail.
Design, engineer and reconstruct parking lots and driveways including demolition, grading, curb and gutter, paving, landscaping, parking lot lighting, trail lighting, utilities, retaining walls and associated storm water improvements at the Hyland-Bush-Anderson Lakes Regional Park Reserve, in particular, West Bush Lake Park. If project costs come in lower, City would utilize funds to install lighting on trail between Bandshell and Chalet parking lot.
Project will complete the design and engineering required for renovation of the bathroom buildings and the boat rental building within the main day-use recreation area of Baker Park Reserve
Design, engineer and reconstruct rest rooms building, maintenance garage, driveway, sidewalks, lighting, utilities, associated storm water improvements including demolition, grading, curb and gutter, paving, retaining wall construction and landscaping at the Hyland-Bush-Anderson Lakes Regional Park Reserve.
Design, engineer and construct segment of the trail including grade separated crossing at Hwy 110 and Dodd Road intersection and a connection to Valley Park.
Design, engineer and construct segment of the trail including grade separated crossing at Hwy 110 and Dodd Road intersection and a connection to Valley Park.
Design and construction of Tamarack Nature Center Campus Site and Infrastructure consisting of parking lot and roadway redevelopment, storm water management, pedestrian connections, landscape restoration, signage, and other site amenities at Bald Eagle-Otter Lakes Regional Park; supplement construction cost for Early Childhood Learning Center Project; supplement construction cost for the Tamarack Nature Center Interior Remodel project. *(There were 99,352 visits to the Tamarack Nature Center in Bald Eagle Otter Lake Regional Park in 2013).
Design and construction of Tamarack Nature Center Campus Site and Infrastructure consisting of parking lot and roadway redevelopment, storm water management, pedestrian connections, landscape restoration, signage, and other site amenities at Bald Eagle-Otter Lakes Regional Park; supplement construction cost for Early Childhood Learning Center Project; supplement construction cost for the Tamarack Nature Center Interior Remodel project. *(There were 99,352 visits to the Tamarack Nature Center in Bald Eagle Otter Lake Regional Park in 2013).