All Projects

146 Results for
Recipient
Theatre Latté-Da AKA Theater Latté Da
2017 Fiscal Year Funding Amount
$32,704
Operating Support
Aitkin
Anoka
Becker
Beltrami
Blue Earth
Brown
Carlton
Carver
Chippewa
Chisago
Clay
Clearwater
Crow Wing
Dakota
Douglas
Faribault
Freeborn
Goodhue
Grant
Hennepin
Hubbard
Isanti
Kandiyohi
Koochiching
Lake
Le Sueur
Lincoln
Lyon
Martin
McLeod
Mille Lacs
Morrison
Murray
Nicollet
Norman
Polk
Pope
Ramsey
Rice
Roseau
Scott
Sherburne
Sibley
Stearns
Steele
St. Louis
Swift
Todd
Wabasha
Wadena
Waseca
Washington
Wilkin
Winona
Wright
Recipient
Theatre L'Homme Dieu
2017 Fiscal Year Funding Amount
$10,470
Operating Support
Anoka
Becker
Benton
Blue Earth
Carver
Chippewa
Clay
Crow Wing
Dakota
Douglas
Grant
Hennepin
Kandiyohi
Lyon
Morrison
Olmsted
Otter Tail
Pope
Ramsey
Renville
Sherburne
Stearns
Stevens
Todd
Wadena
Washington
Wright
Recipient
VSA Minnesota
2017 Fiscal Year Funding Amount
$24,980
Operating Support
Aitkin
Anoka
Becker
Beltrami
Benton
Blue Earth
Carver
Chippewa
Chisago
Clay
Clearwater
Crow Wing
Dakota
Douglas
Fillmore
Hennepin
Isanti
Kanabec
Lac qui Parle
Lyon
Marshall
Mille Lacs
Morrison
Mower
Nicollet
Nobles
Norman
Olmsted
Otter Tail
Pope
Ramsey
Rice
Scott
Stearns
Stevens
St. Louis
Todd
Wadena
Waseca
Washington
Winona
Wright
Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$75,000
Fund Source

The goal of this project is to complete the construction, calibration, and validation of a Hydrological Simulation Program FORTRAN (HSPF) watershed model for the Otter Tail River watershed. The contractor will produce an HSPF model that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDL) Studies. The model will generate predicted output for hydrology, sediment, nutrients, and dissolved oxygen that is consistent with observed data.

Becker
Clay
Clearwater
Mahnomen
Otter Tail
Wilkin
Recipient
Sand Hill River WD
2017 Fiscal Year Funding Amount
$68,800
Fund Source

Consistent with the implementation recommendation of the Total Maximum Daily Load Study , the goal of this project is to install 30 grade stabilization structures along Polk County Ditch 80 to reduce sediment loading by 270 tons per year. Polk County Ditch 80 contributes a large amount of sediment to the Sand Hill River which currently does not meet state water quality standards for sediment.

Polk
Recipient
MN DNR
2017 Fiscal Year Funding Amount
$329,000
Becker
Big Stone
Blue Earth
Brown
Chippewa
Clay
Cottonwood
Dodge
Douglas
Faribault
Freeborn
Grant
Jackson
Kandiyohi
Kittson
Lac qui Parle
Lincoln
Lyon
Mahnomen
Marshall
Martin
McLeod
Meeker
Mower
Murray
Nicollet
Nobles
Norman
Otter Tail
Pennington
Pipestone
Polk
Pope
Red Lake
Redwood
Renville
Rock
Roseau
Sibley
Stearns
Steele
Stevens
Swift
Traverse
Waseca
Watonwan
Wilkin
Yellow Medicine
Recipient
Minnesota Zoological Garden
2017 Fiscal Year Funding Amount
$421,000
Becker
Big Stone
Blue Earth
Brown
Chippewa
Clay
Cottonwood
Dodge
Douglas
Faribault
Freeborn
Grant
Jackson
Kandiyohi
Kittson
Lac qui Parle
Lincoln
Lyon
Mahnomen
Marshall
Martin
McLeod
Meeker
Mower
Murray
Nicollet
Nobles
Norman
Otter Tail
Pennington
Pipestone
Polk
Pope
Red Lake
Redwood
Renville
Rock
Roseau
Sibley
Stearns
Steele
Stevens
Swift
Traverse
Waseca
Watonwan
Wilkin
Yellow Medicine
Recipient
Pheasants Forever with MN Prairie Chicken Society
2017 Fiscal Year Funding Amount
$2,269,000
Fund Source

The Prairie Chicken Habitat Partnership will permanently protect, restore, and enhance 650 acres of prairie chicken habitat in the Southern Red River Valley of Northwest Minnesota. Land protected will become either WMA or WPA and open to public recreation.

Clay
Red Lake
Recipient
Buffalo-Red River WD
2017 Fiscal Year Funding Amount
$168,000
Fund Source

This project will result in the development of three critical pieces of information. They include: 1. Development of restoration and protection strategies for all waterbodies in the district relative to the State's Non-point Source Funding plan 2. Use of PTMApp to tie the WRAPs implementation tables from the Buffalo and Red River Watersheds to targeted on-the-ground projects and practices that will provide measurable water quality improvements, and 3.

Becker
Clay
Otter Tail
Wilkin
Recipient
US Geological Survey
2017 Fiscal Year Funding Amount
$12,520
Fund Source

The goal of this project is to collect real-time, parameter data for specific conductance, water temperature, pH, dissolved oxygen, turbidity, and stream flow at the United States Geological Survey (USGS) gaging stations located at Fargo and Grand Forks, ND on the Red River of the North. The data will be published on the USGS National Water Information System (NWIS) website.

Clay
Polk
Recipient
RESPEC
2017 Fiscal Year Funding Amount
$49,999
Fund Source

The goal of this project is to extend, calibrate, and validate the existing Hydrological Simulation Program – FORTRAN (HSPF) watershed models in the Red Lake River, Thief River, Clearwater River and Red Lake watersheds.

Beltrami
Clearwater
Mahnomen
Marshall
Pennington
Polk
Red Lake
Recipient
Polk, West SWCD
2017 Fiscal Year Funding Amount
$103,000
Fund Source

The purpose of the project is to reduce the amount of sediment entering Burnham Creek, which is a tributary of the Red Lake River within the Red River Basin. The Red Lake River is classified as a source water protection area for the City of East Grand Forks and currently does not meet state water quality standards for sediment. The goal of this project is to install one grade stabilization structure within the channel which outlets into the Burnham Creek channel and two side water inlets with buffers.

Polk
Recipient
BWSR
2017 Fiscal Year Funding Amount
$13,808,000
Fund Source

Under the CREP partnership with USDA, 71 easements were recorded on a total of 4,365 acres to restore previously drained wetlands and adjacent uplands. The easements were accomplished with local implementation done by SWCD, NRCS and FSA staff within the 54 county CREP area and leveraged federal funds for both landowner payments and cost share for conservation practice installation.

Becker
Blue Earth
Carver
Clay
Cottonwood
Dodge
Faribault
Freeborn
Jackson
Kandiyohi
Le Sueur
Lyon
Martin
McLeod
Meeker
Mower
Nicollet
Otter Tail
Ramsey
Redwood
Renville
Rock
Sibley
Stearns
Wilkin
Recipient
Sand Hill River Watershed District
2017 Fiscal Year Funding Amount
$828,000
Fund Source

Phase 2 of this project will complete fish passage restoration from the Red River to 47 miles of quality upstream habitat in the Sand Hill River watershed and enhance stream habitat in a degraded segment of the Sand Hill River.

Polk
Recipient
RESPEC
2017 Fiscal Year Funding Amount
$9,998
Fund Source

The goal of this project is to update the time series and calibration for the Sandhill River Hydrological Simulation Program – FORTRAN (HSPF) model.

Mahnomen
Norman
Polk
Recipient
RESPEC
2017 Fiscal Year Funding Amount
$24,984
Fund Source

The goal of this project is to extend, calibrate, and validate the existing Hydrological Simulation Program FORTRAN (HSPF) model for the Snake River Watershed in the Red River Basin. The contractor will produce an HSPF model that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDL) Studies. The model will generate predicted output for hydrology, sediment, nutrients, and dissolved oxygen that is consistent with observed data.

Marshall
Pennington
Polk
Recipient
Middle-Snake-Tamarac Rivers Watershed District
2017 Fiscal Year Funding Amount
$134,935
Fund Source

The goal of this project is to utilize the information and data collected in the Phase I project to develop a Watershed Restoration and Protection Strategy (WRAPS) Report and Total Maximum Daily Load (TMDL) Study that will address water quality impairments and maintain or improve water quality throughout the Snake-Middle River Watershed. The Phase II project will allocate pollutant reductions goals, and prioritize and identify implementation strategies to maintain or improve water quality in key streams in the watershed.

Beltrami
Marshall
Pennington
Polk
Recipient
Middle-Snake-Tamarac Rivers Watershed District
2017 Fiscal Year Funding Amount
$134,935

The goal of this project is to utilize the information and data collected in the Phase 1 project to develop a Watershed Restoration and Protection Strategy (WRAPS) report and Total Maximum Daily Load (TMDL) study that will address water quality impairments and maintain or improve water quality throughout the Snake-Middle River Watershed. The Phase 2 project will allocate pollutant reductions goals and prioritize and identify implementation strategies to maintain or improve water quality in key streams in the watershed.

Marshall
Pennington
Polk
Recipient
U of MN - WCROC
2017 Fiscal Year Funding Amount
$475,000
Becker
Beltrami
Benton
Big Stone
Blue Earth
Brown
Cass
Chippewa
Clay
Clearwater
Cottonwood
Crow Wing
Dodge
Douglas
Faribault
Fillmore
Freeborn
Goodhue
Grant
Houston
Hubbard
Jackson
Kandiyohi
Kittson
Lac qui Parle
Lake of the Woods
Le Sueur
Lincoln
Lyon
Mahnomen
Marshall
Martin
McLeod
Meeker
Mille Lacs
Morrison
Mower
Murray
Nicollet
Nobles
Norman
Olmsted
Otter Tail
Pennington
Pipestone
Polk
Pope
Red Lake
Redwood
Renville
Rice
Rock
Roseau
Sibley
Stearns
Steele
Stevens
Swift
Todd
Traverse
Wabasha
Wadena
Waseca
Watonwan
Wilkin
Winona
Wright
Yellow Medicine
Recipient
Moorhead Public Service
2017 Fiscal Year Funding Amount
$9,670
Fund Source

Televise well 6 unique well No 241492

Clay
Recipient
City of Nielsville
2017 Fiscal Year Funding Amount
$2,972
Fund Source

Sealing of well 564142

Polk
Recipient
City of Georgetown
2017 Fiscal Year Funding Amount
$10,000
2016 Fiscal Year Funding Amount
$10,000
Fund Source

Purchase a generator; Provide letters to residents in the DWSMA.

Clay
Recipient
City of Georgetown
2017 Fiscal Year Funding Amount
$9,963
Fund Source

Purchase and install electrical equipment to hook up generator to city's water system. Research well report.

Clay
Recipient
Jeffrey S. Brown
2017 Fiscal Year Funding Amount
$1,059
Technology/Equipment Grant
St. Louis
Hennepin
Wright
Itasca
Clay
Dakota
Recipient
Tetra Tech
2017 Fiscal Year Funding Amount
$99,980
Fund Source

This goal of this project is the completion of a Hydrological Simulation Program FORTRAN (HSPF) watershed model for the Upper Red River watershed in the Red River Basin. This includes the construction, calibration, and validation of the model for hydrology and water quality parameters.

Clay
Wilkin
Recipient
USGS North Dakota Water Science Center
2017 Fiscal Year Funding Amount
$20,000
Fund Source

This is a joint project between the United States Geological Survey (USGS), Minnesota Pollution Control Agency (MPCA), North Dakota, and Manitoba. The project is a basin-wide, up-to-date water quality trend analysis using the "QWTrend" program for approximately 40 bi-national river sites to review nutrients, total suspended solids, total dissolved solids, sulfate and chloride from 1980 - 2015.

Clay
Kittson
Marshall
Norman
Polk
Wilkin