Hokah city history was put on display with the installation of six historical markers in various locations throughout the city. The markers consist of narrative information and photographs of historically relevant structures. All markers are ADA height, located in high traffic areas and are enhanced, produced and presented under a silicone hardcoat panel. An unveiling ceremony was held in June, 2011.
To collect data and conduct oral history interviews on congregations and houses of worship in nine neighborhoods in the Twin Cities near the Mississippi River between 1849-1924.
This project will support construction of three watershed framework models built using the Hydrologic Simulation Program FORTRAN (HSPF). These executable models will simulate hydrology at the subbasin scale. An HSPF model will be built for each of three major watersheds: the Crow River/North Fork Crow River, the South Fork Crow River, and the Sauk River.
This project will finalize HSPF watershed model construction and complete the calibration/validation process for the following three watersheds: North Fork Crow River, South Fork Crow River, and Sauk River.
To hire a qualified HVAC engineer to prepare planning documents for a future project to improve environmental conditions for the Elysian School, listed in the National Register of Historic Places
On behalf of the Metropolitan Council, the Minnesota Geological Survey collected information and conducted an assessment of the hydraulic properties and chemistry of selected aquifers in the metro area. This project greatly improves the accessibility of existing data, which were previously available only in scattered paper reports. A robust database of groundwater age, aquifer hydraulic conductivity and groundwater chemistry data was developed to make the information easily accessible to water resource managers.
This project will complete spatial and temporal revisions of 6 Hydrologic Simulation Program FORTRAN (HSPF) models, the recalibration and validation of 7 watershed HSPF models, and the revision of the drainage network and point source representation of the Pomme de Terre HSPF model.
This project is sixth in a series between the India Association of Minnesota and the Minnesota Historical Society. It was developed to convey the history of the Indian Music Society of Minnesota (IMSOM) in three ways:
1. The collection and transcription of seven interviews telling the oral history of IMSOM.
2. The digitization of thirty years of concert performance recordings by leading musiciains from India as well as local artists.
In 2005, Metropolitan Council was directed to carry out regional water supply planning activities under Minnesota Statutes, section 473.1565. Working closely with the region's many water supply stakeholders and under the guidance of a metropolitan area water supply advisory committee, Metropolitan Council developed and adopted a metropolitan area master water supply plan (master plan) in 2010. The plan provides a framework for water supply planning and identifies actions needed to achieve the goal of ensuring sustainable water supplies across the region.
Agricultural drainage is very prevalent practice in Dodge County and there is a need to implement practices to that will better manage flow and pollutant loads that are being contributed to nearby surface waters. This project involves the installation of a woodchip bioreactor on a tile-drained agricultural field, which will feature improvements in design, and monitoring scope, as compared to a previous bioreactor constructed in Dodge County in 2007.