Water control structures and dikes were designed and constructed on six Wildlife Management Areas (WMA) in the counties of Becker, Clearwater, Itasca, Lincoln, Roseau, and Yellow Medicine. Dike work at Roseau River WMA protects and enhances 3200 acres of wetlands wetlands in Pool 2 of the WMA. Roseau River WMA has 10 large water control structures, seven moist soil cells, and four large pools covering 11,800 acres. Cells for a moist soil unit were constructed at Lac Qui Parle WMA in Lac Qui Parle County.
We protected 22.3 miles of trout streams and 1.3 miles of lakeshore via easements (585 acres in total), and 7.4 miles (504 acres) of lakeshore through fee-title purchase. We enhanced shoreline habitat on 524 acres of riparian land, and instream habitat on 3.1 miles of trout streams and 0.5 miles of warmwater rivers.
This appropriation funded 283 projects totaling 21,953 acres. The two largest types of enhancement were 112 woody removal projects totaling 10,160 acres and 134 prescribed burns totaling 10,082 acres. Additionally, we seeded 30 sites totaling 1386 acres, put in infrastructure for conservation grazing of 236 acres on 3 sites, conducted 3 oak savanna enhancements totaling 42 acres, and treated 47 acres of invasive species on 2 sites.
This program accelerated the permanent protection of 2,267 acres of wetlands (465 acres) and grasslands (1,802 acres) as Waterfowl Production Areas open to public hunting in Minnesota. Over the course of the appropriation, PF acquired 18 parcels for a total of 2,267 acres which exceeded our total acre goal of 2,250 acres by 17 acres. Breaking down acres by ecological section we exceeded our acre goal for both the metropolitan area by 61 acres and in the prairie area by 346 acres. We have exceeded anticipated match of $5,125,000 by $771,500.
This program of on-the-ground conservation projects increased the wildlife and ecological values of forest communities on Minnesota's public forestlands. Restoration and enhancement projects in this program enhanced more than 10,000 acres of forest.
This project will support updates to the Draft Bald Eagle Lake TMDL. The updates will address comments received during the public comment period. The comments resulted in the development of individual Wasteload Allocations for stormwater sources in the Bald Eagle Lake watershed.
This program will protect ~510 acres and restore ~200 acres near Cannon River Headwaters including wetlands, Big Woods forest, and river & shallow lake shoreline to reverse habitat loss, improve watershed function, and provide access
This project addresses the identified need for an Implementation Plan that provides an overall roadmap for the effort it will take to meet the Carnelian Marine St. Croix Multi-Lakes Total Maximum Daily Load (TMDL). An Implementation Plan will be developed, with involvement of the Project Partners and stakeholder groups, that sets forth prioritized strategies for attaining the TMDL and a method for tracking the progress of those efforts. The Implementation Plan will be restoration-focused, but will include protection-oriented information/actions as well.
To fully catalog the museum's inventoried collection that documents the history of art in Minnesota under the direction of a qualified museum registrar.
To hire a qualified historic preservation specialist to assess potential impacts on and reuses for up to five buildings along the Central Corridor Light Rail Transit Line.
Minnesota Trout Unlimited enhanced in-stream and riparian fish and wildlife habitat in and along coldwater streams located on public lands and Aquatic Management Areas. We completed all 9 projects originally proposed and three additional. Contracting efficiencies and leveraging of other funding allowed us to add two habitat enhancement projects in southeast Minnesota and another segment on the Sucker River in northeast Minnesota. We enhanced 10 more acres of habitat than originally proposed and increased leverage by $121,700 (67%).
This first year of the project will collect available data relevant to the TMDL development, determine the data sets best suited for the TMDL development. Gain a better understanding of the watershed and impaired lakes, and assessment of all potential sources (internal and external) of the causes of lake impairment. EOR will also review the data produced by the MPCA for the impairment assessment for each of the lakes during year 1 of the project.
Chisago County will coordinate up to three community dialogue meetings to inform its water planning decisions. The goal of the meetings will be to provide safe, productive and effective venues for citizens to become authentically engaged in the water planning process. The outcome of this Civic engagement work with Chisago County and their county water planning process will be a more engaged public in the County Water Planning Process.
This project will construct three watershed framework models built using the Hydrologic Simulation Program FORTRAN. These executable models will simulate hydrology at the 12-digit HUC subbasin scale. An HSPF model will be built for each of the following 8-HUC watersheds: Red Lake River (09020303) and the Clearwater River (09020305).
This project will support a civic engagement cohort that will be offered in southwest Minnesota to foster partnering and build capacity of local government, organizations, and residents for effective civic engagement in water protection and restoration. This project will also build networks and the skill set of local resource professionals to do effective civic engagement work for water restoration and protection. The cohort will be administered through the Minnesota River Board (MRB), established in 1995 with a goal of focusing water management efforts on the local level.
This project will support the necessary activities for improving the water quality and biological community by reducing nutrients, sediment levels and managing in-stream habitat within the Goose Creek 10-digit HUC Watershed. This restoration and protection plan will identify pollutant load reduction estimates and management strategies that will be used to obtain the TMDL goals outlined in the plan.
This project will complete a comprehensive study, following a rational, step-wise process of data analysis, response modeling and comparison to the water quality standards, followed by impairment diagnosis, modeling of improvement and protection options, and development of a WRAP Report and Implementation Plan for Sunfish lake, Thompson lake, Pickerel lake, and Rogers lake.
This project covers activities necessary to complete the major watershed restoration and projection project. The major objectives this project covers include contract administration, watershed coordination, stressor ID activities, identifying priority management zones, engage watershed citizens, and the creation of watershed restoration and protection plans.
This project will finalize HSPF watershed model construction by incorporating internal phosphorus loading in modeled lakes, run a suite of implementation scenarios and generate a GenScn project containing model output. The consultant will produce HSPF watershed models that can readily be used to provide information to support conventional parameter TMDLs. The consultant will deliver all modeling files for baseline and implementation scenarios and provide a GenScn project containing model output.
This project will develop an understanding for how sediment sources change over timescales of individual storm events as well as over the past two centuries. The results will be used by the larger Collaborative for Sediment Source Reduction (CISSR)-Blue Earth research group to establish a sediment budget for the Greater Blue Earth River Basin and understand the effectiveness of various potential mitigation strategies. In addition, these results can be used by MPCA and others to calibrate watershed sediment models.
This project will provide Agency staff, local partners and the citizen volunteers with a framework for building local capacity to design civic engagement and communication / outreach efforts. This will contribute to meaningful and sustained public participation in surface water protection and restoration activities throughout the watershed. MPCA staff, local partners and citizen volunteers will also be able to integrate the results of the biophysical and community assessment into strategies for improving water bodies on the MN 303d List of Impaired Waters
This project will build network and the skill set of local resource professionals to do effective civic engagement work for water restoration and protection in Southeast Minnesota. The cohort will be administered through the Southeast Minnesota Water Resources Board (SE MN WRB) which is an area wide Joint Powers Board (JPB) established to help improve and protect the water resources of the area through coordinating local water planning efforts. This JPB has successfully administered water quality grants in the past that have positively impacted the water resources of this region.
This project will complete an implementation plan, as required by the Minnesota Pollution Control Agency, for the Zumbro River turbidity TMDL project. It will also revise the Zumbro River Watershed Management Plan (completed 2007) to ensure it continues to reflect local needs, incorporates new information, and develops more effective linkages with related local, state and federal government programs.
In 2007, the Children's Museum of Southern Minnesota (CMSM) conducted an environmental scan of early learning opportunities for children in southern Minnesota. It became apparent that the region creates few opportunities for children to engage in self-directed learning experiences in social settings; in particular, opportunities that create access to arts, culture, and heritage. This is still true today.
BWSR will administer funding to eligible County projects that provide funds and other assistance to low income property owners to upgrade or replace Noncompliant Septic Systems. BWSR will also manage annual reporting completed by each County.
To hire a historical architect to conduct a conditions assessment of the George Gardner House, listed in the National Register of Historic Places and currently in use by the Germanic-American Institute.