All Projects

4 Results for
Recipient
Ramsey-Washington Metro WD
2016 Fiscal Year Funding Amount
$150,000
Fund Source

The Ramsey-Washington Metro Watershed District (RWMWD) is responsible for the protection and restoration of the water quality of 20 lakes and 5 creeks within its boundary. Permit and voluntary cost share programs serve to slowly redevelop the watershed to the benefit of these water bodies. However, additional projects are needed- not only to implement green infrastructure in areas that need extra restoration and protection, but also to foster new relationships between citizens and the RWMWD to rally together in a common goal to the benefit of their water resources.

Ramsey
Washington
Recipient
Anoka CD
2016 Fiscal Year Funding Amount
$60,000
Fund Source

Lake George is the premier recreational lake in Anoka County with above average water quality, a vibrant fishery, and a large regional park and beach that is among the most utilized in the county. Located in northwestern Anoka County within the Upper Rum River Watershed Management Organization (URRWMO), the Lake George Improvement District (LGID) was formed to tend to the lake's diminishing water quality and problematic invasive species.

Anoka
Recipient
Valley Branch WD
2016 Fiscal Year Funding Amount
$199,000
Fund Source

This project will reduce phosphorus loading from the watershed tributary to Silver Lake. The project includes a combination of structural water quality improvements in the SLV-10 subwatershed north of the lake, retrofits (including iron enhanced sand filtration) to the Silver Lake bioretention basin, small scale best management practices (BMPs) throughout the watershed, and educational signage in Joy Park. The elements of this project will reduce phosphorus loading to Silver Lake by a combined 15 pounds per year or 40% of the current watershed load.

Ramsey
Recipient
Ramsey-Washington Metro WD
2016 Fiscal Year Funding Amount
$300,000
Fund Source

Wakefield Lake is in the Ramsey-Washington Metro Watershed District (RWMWD) and is impaired for excess phosphorus. Through the Wakefield Lake TMDL process, implementation activities have been identified which include partnerships with the City of Maplewood to install BMPs in the watershed to directly benefit Wakefield Lake. RWMWD has researched, monitored and field tested the use of spent lime for stormwater quality treatment.

Ramsey