These funds are being used to systematically collect data and produce statistically valid estimates of the rate of soil erosion and tracking the adoption of high residue cropping systems in in the 67 counties with greater than 30% land in agricultural row crop production. Designed to establish a long term program in Minnesota to collect data and produce county, watershed, and state wide estimates of soil erosion caused by water and wind along with tracking adoption of conservation measures to address erosion.
The Chisago Soil and Water Conservation District (SWCD) has had such great success implementing gully stabilization projects along the St. Croix River escarpment that all of the current grant funding has been encumbered towards projects. Two large gully projects, one in the City of Taylors Falls and a second nearby in Interstate State Park, are lined up and ready to go as soon as funding is secured. Both of these gullies are large and have been actively eroding for many years, depositing large loads of sediment and phosphorus directly into the St. Croix River.
These funds are being used to systematically collect data and produce statistically valid estimates of the rate of soil erosion and tracking the adoption of high residue cropping systems in counties with greater than 30% land in agricultural row crop production. Designed to establish a long term program in Minnesota to collect data and produce county, watershed, and state wide estimates of soil erosion caused by water and wind along with tracking adoption of conservation measures to address erosion.
The Ramsey-Washington Metro Watershed District (RWMWD) is responsible for the protection and restoration of the water quality of 20 lakes and 5 creeks within its boundary. Permit and voluntary cost share programs serve to slowly redevelop the watershed to the benefit of these water bodies. However, additional projects are needed- not only to implement green infrastructure in areas that need extra restoration and protection, but also to foster new relationships between citizens and the RWMWD to rally together in a common goal to the benefit of their water resources.
Lake George is the premier recreational lake in Anoka County with above average water quality, a vibrant fishery, and a large regional park and beach that is among the most utilized in the county. Located in northwestern Anoka County within the Upper Rum River Watershed Management Organization (URRWMO), the Lake George Improvement District (LGID) was formed to tend to the lake's diminishing water quality and problematic invasive species.
Moody Lake is the headwaters of the Comfort Lake-Forest Lake Watershed District northern flow network, and as such, its water quality sets the stage for downstream waters, particularly Bone Lake, Comfort Lake, the Sunrise River, and ultimately Lake St. Croix. A multi-year diagnostic and implementation feasibility study was conducted in the Moody Lake watershed to prioritize nutrient sources, target cost-effective BMPs, and estimate the measurable phosphorus reductions that will be achieved through implementation of these projects.
This project will reduce phosphorus loading from the watershed tributary to Silver Lake. The project includes a combination of structural water quality improvements in the SLV-10 subwatershed north of the lake, retrofits (including iron enhanced sand filtration) to the Silver Lake bioretention basin, small scale best management practices (BMPs) throughout the watershed, and educational signage in Joy Park. The elements of this project will reduce phosphorus loading to Silver Lake by a combined 15 pounds per year or 40% of the current watershed load.
The lack of sewage treatment in many small communities in Southeast Minnesota is causing surface water and groundwater pollution. Fourteen of these small communities will receive technical assistance provided by this project. These communities have community or individual straight pipes which are discharging raw sewage directly to the environment, surfacing sewage, or have sewage contaminating groundwater.
Wakefield Lake is in the Ramsey-Washington Metro Watershed District (RWMWD) and is impaired for excess phosphorus. Through the Wakefield Lake TMDL process, implementation activities have been identified which include partnerships with the City of Maplewood to install BMPs in the watershed to directly benefit Wakefield Lake. RWMWD has researched, monitored and field tested the use of spent lime for stormwater quality treatment.
To be able to manage resources in the Blue Earth and Le Sueur Watersheds into the future and have a positive effect on water quality, resource managers need high quality accurate data to support decision making of best management practice (BMP) implementation. Digital elevation data is a valuable resource for modeling water flow, however in its current state it cannot represent water conveyance through features such as roadways. These flow barriers limit the accurate use of data for recently developed targeting tools identifying BMP suitability and effectiveness down to the field scale.