All Projects

12 Results for
Recipient
Nobles SWCD
2014 Fiscal Year Funding Amount
$113,498
Fund Source

The Nobles Soil and Water Conservation District (SWCD) and Nobles County Environmental Services will complete Level III feedlot inventories with manure management plan reviews through portions of the Rock River Watershed located within Nobles County. There are 133 registered feedlots in the Rock River Watershed portion of Nobles County including 62 open lots and 7 within shoreland. Rock County has completed level III feedlot inventories through the Rock River Watershed within Rock County borders.

Nobles
Recipient
Area 1 - Red River Valley Conservation Service Area
2014 Fiscal Year Funding Amount
$250,000
Fund Source

The Accelerated Water Quality Project Implementation Program will increase the connection between landowners, local government units and the landscape to accelerate efforts addressing non-point source loading to surface waters throughout the Red River Valley Conservation Service Area.

Becker
Beltrami
Clay
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Traverse
Wilkin
Recipient
Heron Lake Watershed District
2014 Fiscal Year Funding Amount
$122,000

Once known for its clean water, fertile soil, and healthy habitat, in more recent times the Heron Lake Watershed in southwestern Minnesota has been heavily impacted by pollution from intensive agriculture, feedlots, non-compliant septic systems, and urban stormwater runoff. The Heron Lake Watershed District is using this appropriation for public outreach and installation and monitoring of water quality improvement projects aimed at reducing sediment and nutrient loading for the benefit of public health, recreation, and wildlife habitat.

Jackson
Murray
Nobles
Recipient
Mahnomen SWCD
2014 Fiscal Year Funding Amount
$22,550
Fund Source

This project will complete an inventory of drainage systems to prioritize locations for structural erosion control practices and buffer strips that will reduce sediment loading into Marsh Creek and Lower Wild Rice River downstream, which are both impaired by turbidity. An inspection plan and database will also be developed to enhance the county drainage ditch inspection program.

Mahnomen
Recipient
Polk , East SWCD
2014 Fiscal Year Funding Amount
$364,880
Fund Source

Increases in crop prices have reduced the acreage of land in conservation set-aside programs such as the Conservation Reserve Program and other marginal land use. Significant conversion of grasslands to cultivated agricultural crops has increased the levels of runoff and sedimentation. Phase III of this project addresses the need to protect vulnerable sites by installing water and sediment basins. These basins are earthen embankments built to temporarily detain sediment-laden runoff, allowing sediment to settle out before runoff is discharged.

Polk
Recipient
Red River Watershed Mgmt Board
2014 Fiscal Year Funding Amount
$235,250
Fund Source

The Prioritization, Targeting, and Measuring Water Quality Improvement Application (PTMA) connects the general qualitative strategies in a Total Maximum Daily Load (TMDL) and Watershed Restoration and Protection (WRAP) and the identification of implementable on-the-ground Best Management Practices (BMPs). Leveraging geospatial data from the International Water Institute this application will be developed for two pilot areas within the Red River Basin.

Becker
Cass
Clay
Grant
Mahnomen
Norman
Otter Tail
Traverse
Recipient
Red River Watershed Mgmt Board
2014 Fiscal Year Funding Amount
$30,636
Fund Source

As part of the FY 2012 funding cycle, the Board of Water and Soil Resources granted funds for development of the Water Quality Decision Support Application (WQDSA). The WQDSA will provide land and water managers with geospatial data and online tools to prioritize, market, and implement actions on the landscape to achieve water quality objectives identified in local and state water plans and to ensure that public funding decisions are strategic and defensible.

Becker
Clay
Mahnomen
Norman
Polk
Recipient
BWSR
2014 Fiscal Year Funding Amount
$13,292,600
Fund Source

The Reinvest in Minnesota (RIM) Wetlands Partnership Phase V protected and restored 2,041 acres of previously drained wetlands and adjacent native grasslands on 23 conservation easements. All easements have been recorded. $35,000 of funds from other sources were also used.  

Becker
Blue Earth
Clay
Freeborn
Le Sueur
Lincoln
Lyon
Meeker
Murray
Nobles
Otter Tail
Redwood
Stevens
Todd
Wilkin
Recipient
Area 7 - Southeast SWCD Technical Support
2014 Fiscal Year Funding Amount
$250,000
Fund Source

The purpose of this project is to provide a new shared position in southeast Minnesota which will accelerate the adoption of soil health practices by leveraging the existing efforts of the National Resources Conservation Service and other organizations.

Dodge
Fillmore
Freeborn
Goodhue
Houston
Mower
Olmsted
Rice
Steele
Wabasha
Winona
Recipient
SE Minnesota Water Resources Board
2014 Fiscal Year Funding Amount
$263,400
Fund Source

The lack of sewage treatment in many small communities in Southeast Minnesota is causing surface water and groundwater pollution. Ten of these small communities will be the target of the technical assistance provided by this project. These communities have community or individual straight pipes which are discharging raw sewage directly into the environment, surfacing sewage, or have sewage contaminating groundwater.

Dakota
Dodge
Fillmore
Freeborn
Goodhue
Houston
Le Sueur
Mower
Olmsted
Rice
Steele
Wabasha
Waseca
Winona
Recipient
Area 5 - Southwest Prairie Technical Service Area
2014 Fiscal Year Funding Amount
$250,000
Fund Source

The Southwest Prairie Technical Service Area 5 (SWPTSA), located in the southwest corner of Minnesota, encompasses 11 Soil and Water Conservation Districts (SWCDs): Cottonwood, Jackson, Lac Qui Parle, Lincoln, Lyon, Murray, Nobles, Pipestone, Redwood, Rock, and Yellow Medicine. This project will protect natural resources within the three major river basins of Minnesota, Missouri and Des Moines Rivers. The SWPTSA will assist member SWCDs in locating and identifying priority subwatersheds that have soil erosion and water quality issues using terrain analysis.

Cottonwood
Jackson
Lac qui Parle
Lincoln
Lyon
Murray
Nobles
Pipestone
Redwood
Rock
Yellow Medicine
Recipient
Mahnomen SWCD
2014 Fiscal Year Funding Amount
$100,938
Fund Source

This project builds on the successful implementation of previous work, installing 29 water and sediment control basins and 25 acres of vegetative filter strips within the priority Marsh Creek watershed to reduce sediment loading into the Wild Rice River, which is currently not meeting water quality standards for sediment.

Mahnomen