The Accelerated Water Quality Project Implementation Program will increase the connection between landowners, local government units and the landscape to accelerate efforts addressing non-point source loading to surface waters throughout the Red River Valley Conservation Service Area.
Phase II of the Burnham Creek Watershed Restoration Project will conduct inventory on 2,050 acres, 85.4 miles of ditch channel within the Burnham Creek Watershed of West Polk County. This inventory includes surveying, assembling all available GIS data, ArcMap, LiDAR, review aerial photography, location of tile intakes, determine size of the erosion sites, and prioritization of severity. The district will partner with the Area DNR Hydrologist and the Polk County Highway Department-Drainage & Ag Inspector to verify data and identify any additional ditch segments.
The Cannon River Watershed includes approximately 941,000 acres of primarily agricultural landscape. Because of its large size, four subwatershed lobes are often referenced: Straight River Watershed, Upper Cannon River Watershed, Middle Cannon River Watershed, and the Lower Cannon River Watershed. Rice County is proposing utilizing LiDAR topographic data to determine areas of highest importance for Best Management Practice (BMP) Implementation for sediment within the Middle and Lower Cannon subwatersheds.
Within an 11-county area in southeastern Minnesota, two Nutrient Management Specialists will work directly with producers to reduce nitrogen, phosphorus, and fecal coliform runoff into surface and ground water in the region and the Mississippi River. The specialists will help producers create or revise nutrient management plans, implement Best Management Practices for manure and fertilizer use, and set up on-farm demonstration projects to support farmer-to-farmer learning.
Increases in crop prices have reduced the acreage of land in conservation set-aside programs such as the Conservation Reserve Program and other marginal land use. Significant conversion of grasslands to cultivated agricultural crops has increased the levels of runoff and sedimentation. Phase III of this project addresses the need to protect vulnerable sites by installing water and sediment basins. These basins are earthen embankments built to temporarily detain sediment-laden runoff, allowing sediment to settle out before runoff is discharged.
This project is Phase IV of work to install water and sediment basins located within Sand Hill Watershed. A water and sediment basin is an earthen embankment built so that sediment-laden runoff is temporarily detained, allowing sediment to settle out before runoff is discharge. These are installed on agricultural cropland where erosion exceeds the allowable soil rate. Minimum detention time to store water is 36 hours for a 10 year, 24 hour runoff event. Starting in 2010, the District received dollars to assist landowners with flood-related projects.
This grant application will focus on the construction of multiple targeted best management practices (BMPs) in priority areas which will provide measurable reductions in sediment and phosphorus loadings to cold water streams in the Mississippi River/Lake Pepin Watershed. The installation of these BMPs will also protect the existing stream habitat by reducing peak flows and reduced streambank erosion.
As part of the FY 2012 funding cycle, the Board of Water and Soil Resources granted funds for development of the Water Quality Decision Support Application (WQDSA). The WQDSA will provide land and water managers with geospatial data and online tools to prioritize, market, and implement actions on the landscape to achieve water quality objectives identified in local and state water plans and to ensure that public funding decisions are strategic and defensible.
The Red Lake Watershed District will create an inspection database for 103E ditches under their drainage authority. The district will acquire a database software solution to conduct field inspections and to track ditch maintenance projects and use the software to facilitate compliance with state statutes. The project will also develop a process for completing the annual inspection and reporting requirements under Statue 103E.
The Sand Hill River Watershed District along with the West Polk Soil and Water Conservation District (SWCD) will install 18 rock riffles and 2 rock arch rapids to control the grade and stabilize the channelized reach of the Sand Hill River, which contributes thousands of tons of sediment downstream. The entire Sand Hill River is currently impaired for turbidity. The total project length is five miles of channel located between the cities of Fertile and Beltrami in western Polk County.
The purpose of this project is to provide a new shared position in southeast Minnesota which will accelerate the adoption of soil health practices by leveraging the existing efforts of the National Resources Conservation Service and other organizations.
The lack of sewage treatment in many small communities in Southeast Minnesota is causing surface water and groundwater pollution. Ten of these small communities will be the target of the technical assistance provided by this project. These communities have community or individual straight pipes which are discharging raw sewage directly into the environment, surfacing sewage, or have sewage contaminating groundwater.